FA302218R0019.pdf

PDF 624 KB Posted

Attached to
B216 Repair Roof Leaks
Solicitation number
FA302218R0019
Issued by

About this file

Solicitation

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Provide all plant, labor, transportation, materials, equipment, and perform all w ork necessary to prepare existing roof surface to receive a replacement Ridge Cap. Contractor w ill Install a new Roof Ridge Cap and a metal Z closure under ridge cap.

The NAICS code is 238160 and the size standard is $15,000,000.00

Project Magnitude: Less than $25,000.00

A one time site visit w ill be held on 11 July 2018 at 1:00 P.M.

Questions concerning the solicitation or site visit shall be forw arded to the Contract Specialist by 13 July 2018 by 2:00 P.M.

JAKE CAMACHO 662-434-7787

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

25-Jun-2018

(RFP)

(IFB)

X

CALL:

Repair Roof Leaks, Bldg. 216

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________50 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________26 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

14 CONS/PKA--FA3022

495 HARPE BLVD, STE 293

COLUMBUS AFB MS 39710-1006

FA3022

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

OPP# 1068471

8. ADDRESS OFFER TO (If Other Than Item 7)

662-434-7753FAX:TEL: 662-434-7780 TEL: FAX:

FA302218R0019 28

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA302218R0019

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot

Bldg. 216 Roof Repairs

FFP

Provide all plan, labor, transportation, materials, equipment, and perform all work necessary to prepare existing facility to receive replacement new ridge cap and reconnect gutter IAW attached Statemet of Work dated 2 April 2018.

FOB: Destination

NET AMT

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 50 dys. ANP 1 N/A

FOB: Destination

CLAUSES INCORPORATED BY REFERENCE

52.211-13 Time Extensions SEP 2000

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to:

(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 50 calendar days after receipt of the Notice to Proceed.

The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $318.24 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

Section I - Contract Clauses

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-13 System for Award Management Maintenance OCT 2016

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

NOV 2015

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013

52.222-3 Convict Labor JUN 2003

52.222-6 Construction Wage Rate Requirements MAY 2014

52.222-7 Withholding of Funds MAY 2014

52.222-8 Payrolls and Basic Records MAY 2014

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) MAY 2014

52.222-12 Contract Termination-Debarment MAY 2014

52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility MAY 2014

52.222-21 Prohibition Of Segregated Facilities APR 2015

52.222-26 Equal Opportunity SEP 2016

52.222-50 Combating Trafficking in Persons MAR 2015

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-9 Buy American--Construction Materials MAY 2014

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014

52.232-16 Progress Payments APR 2012

52.232-23 Assignment Of Claims MAY 2014

52.232-27 Prompt Payment for Construction Contracts JAN 2017

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-5 Material and Workmanship APR 1984

52.236-17 Layout of Work APR 1984

52.236-26 Preconstruction Conference FEB 1995

52.242-14 Suspension of Work APR 1984

52.243-5 Changes and Changed Conditions APR 1984

52.244-6 Subcontracts for Commercial Items NOV 2017

52.246-21 Warranty of Construction MAR 1994

52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7003 Agency Office of the Inspector General DEC 2012

252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Alt A System for Award Management Alternate A FEB 2014

252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.225-7048 Export-Controlled Items JUN 2013

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.236-7001 Contract Drawings, and Specifications AUG 2000

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.244-7000 Subcontracts for Commercial Items JUN 2013

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through

WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Combo

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in

WAWF, as specified by the contracting officer.

Destination

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC F87700

Issue By DoDAAC FA3022

Admin DoDAAC FA3022

Inspect By DoDAAC F1N3BC

Service Approver (DoDAAC) F1N3BC

Service Acceptor (DoDAAC) F1N3BC

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send

Additional Email Notifications” field of WAWF once a document is submitted in the system.

ricky.witherspoon@us.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Agency Name:Ogden Help Desk

System Name: WAWF

Agency Primary Email: disa.global.servicedesk.mbx.eb-ticket-requests@mail.mil

Commercial Telephone:

866-618-5988

801-605-7095

Commercial Fax: 801-605-7453

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

5352.201-9101 Ombudsman

As prescribed in 5301.9103, insert the following clause:

OMBUDSMAN (Jun 2016)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman AETC is the Deputy Director of Contracting, AFICA/KT (OL-AET), 2035 First Street West, JBSA Randolph TX 78150-

4304, telephone 210-652-7907 (DSN 487-7907). The alternate Ombudsman is the Chief, Clearance & Program

Support Division, AFICA/KTC, 2035 First Street West, JBSA Randolph TX 78150-4304, telephone 210-652-7075

(DSN 487-7075). Concerns, issues, disagreements, and recommendations that cannot be resolved at the

Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force

Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

mailto:disa.global.servicedesk.mbx.eb-ticket-requests@mail.mil https://cs1.eis.af.mil/sites/afcc/knowledge_center/policy_memo_15_c_02/Memo%20Attachments/5301.docx#p53019103 http://www.whitehouse.gov/omb/circulars_a076_a76_incl_tech_correction/

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

5352.242-9000 Contractor Access to Air Force Installations

As prescribed in 5342.490-1, insert a clause substantially the same as the following clause in solicitations and contracts:

CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (NOV 2012)

1. Contractor Access to Columbus Air Force Base Installations a. Background Checks: All contractor and subcontractor personnel requiring entry on Columbus AFB (CAFB) must submit to a local background check to include criminal history checks conducted by the 14th Security Forces Squadron (14 SFS). Cooperation with the investigation is mandatory for entry to CAFB. Contractor personnel convicted of certain crimes will not be allowed to work on CAFB. Such crimes include, but are not limited to the following: espionage, sabotage, treason or terrorism; felony convictions; violent crimes against persons; sex crimes; drug crimes related to distribution or intent to distribute firearms/explosives violations. Other grounds for exclusion from working on CAFB include, but are not limited to: inability to provide proof of U.S. citizenship or legal U.S. residency, outstanding warrants, individuals identified on Federal terrorist watch lists, and incarceration for any offense. Deviations from this guideline are permitted on a case by case basis as determined by 14 MSG/CC and/or the 14 Flying Training Wing (FTW)/CC.

Background checks will be considered valid for a period of twelve (12) months for contractors working on CAFB without a break in service. In the event of a break in service greater than six (6) months, the contractor will have to resubmit a request for a background check.

b. Non-routine access requirements: Non-routine delivery drivers are drivers requiring access to the installation less than three (3) times in a twelve (12) month period. This will be tracked by a database maintained by the Visitors

Center. A delivery driver making more than three (3) deliveries in a twelve (12) month period, will be required to comply with the requirements listed below for those who make frequent visits to CAFB. At the time of delivery, the

Visitors Center will contact the requesting activity’s delivery recipient, and the Government recipient will report to the Visitors Center to validate the delivery. Once the delivery driver has been validated by the Government recipient, the delivery driver will present two forms of ID (at least one US Government-issued ID and one photo ID) to the Visitors Center. The 14 SFS Control Center will run the criminal history background. The Visitors Center will then issue either an AF Form 75or DBIDS pass, Visitor/Vehicle Pass, which will be valid for only 30 days to make their delivery and depart the installation. Drivers of time-sensitive deliveries, such as concrete and asphalt, will identify themselves to the Visitors Center personnel upon arrival to allow them priority. Time sensitive deliveries will be expedited to the maximum extent practicable, but access will not be allowed until the entire process has been completed successfully. After normal duty hours, passes will be issued at the Main Gate and will only be valid until the next duty day.

c. Routine access requirements: The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

Contractor personnel need to have a valid base pass on them at all times while on the installation. The contractor http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/5342.htm#p53424901 shall coordinate with the appropriate government organization’s Contracting Officer Representative (COR) or contract inspector for information on the below as needed.

(1) Retired DoD personnel and dependents who are employed by a contractor may not use their sponsorship privilege for the contractor or subcontractor’s benefit; contractor employees must go through the regular process to obtain a pass to work on base.

(2) Contractor personnel need to have a valid base credentials on them at all times while on the installation. Before initiation of the contract, the Air Force sponsoring activity or COR of the contract submits a primary Contactor

Employee Identification Credential Request form to the Visitor’s Control Center to determine the credentials to be issued to each contractor (this form may be obtained from the Visitor’s Control Center). This form must be completed (to include the names and social security numbers for all primary and sub-contractors requiring base access) and signed before processing can occur. Unless otherwise approved by the government, forms must be submitted to the 14 SFS/VCC and 14 FTW/IP at least five duty days prior to the contract performance to allow processing time for required background checks; Contracts must coordinate with the COR in a timely manner to allow adequate time for this process to occur. After initial base credentials have been issued, the prime contractor shall be responsible for sponsoring their employees and subcontractor employees on the base and ensuring they have the appropriate credential. Only prime contractor employees, designated in writing, shall have the authority to sponsor subcontractor employees on base. Valid base credentials consist of:

1. DoD Common Access Card (CaC): All contract employees requiring CaCs will be issued a 30 day DBIDS visitor pass to allow time for completion of CaC prerequisites. A completed SF 85/ National Agency Check with Inquiries background investigation required before CaC issuance (see 2. Personnel and Information Security Requirements below for additional information).

2.Defense Biometric Identification System (DBIDS) card/pass: To receive a DBIDS credential, the contractor must provide two forms of ID (with at least one containing a photo) to the Visitor’s Control Center. DBIDS credential will be issued at the same location. A DBIDS pass is issued in 30 day increments. The DBIDS card is for contractor employees who will require frequent access to the base for one year or more not meeting CaC requirements. The contractor must receive a DBIDS request form memo from their COR and present this memo to the Visitor Control

Center personnel. Additionally, the prime contractor may complete a DBIDS request form requesting authorization for key primary contract personnel to have base escort privileges. The government reserves the right to disapprove escort privileges.

d. Verification of Contractor and Vehicle:

1. Contractor employees will be confirmed by verifying the person’s credentials (driver’s license, insurance, registration, etc.) against the Contactor Employee Identification Credential Request form or DBIDS request form.

Supplier vehicles delivering materials to the base will be granted entry upon presentation of a valid bill of lading and after clearing through the vehicle search area.

2. The employee must show a notarized letter from the contractor that he/she is a driver of the vehicle and is covered by insurance, accompanied by a copy of the registration.

3. When the driver changes vehicles, he/she will stop at Pass & ID to obtain a pass for that particular vehicle.

4. If a day worker or other contractor/subcontractor employee reports to the Visitors Center for a short notice pass, the prime contractor will be contacted, and if necessary report to the Visitors Center, to validate that the employee is authorized and obtain the required access.

e. Additional Contractor Responsibilities: Contractor and subcontractor employees shall report all lost, stolen or missing base credentials to 14 SFS at 434-7128 immediately upon discovery. Upon completion or termination of the contract or expiration of the base credential, the prime contractor shall ensure that all base credentials issued to employees and subcontractor employees are returned to the issuing office (Visitor Control Center for DBIDS and

Military Personnel Facility (MPF) for CaCs). Failure to comply with these requirements may result in withholding of final payment from the prime contractor and/or prevent the contractor or subcontractor from further qualifying for base access.

(1) Contractor and subcontractor personnel gaining access to the installation will conduct all work during the days and hours of Monday thru Friday, 7:30 AM to 430 PM Central Time, unless otherwise specified in the contract or as approved by the Contracting Officer (CO). Contractor/subcontractor personnel will not be allowed to access other base facilities unless specified in the contract.

f. Entry to Restricted or Controlled Areas: When work under this contract requires unescorted entry to controlled, restricted or other areas designated sensitive by the installation commander, the contractor shall comply with AFI

31-101, Integrated Defense, DoD 5200.2-R and AFI 31-501, Personnel Security Program Management, requirements. Contractor or sub-contractors who require escorted or unescorted entry to controlled areas, must be added to the Entry Authority List (EAL) for that respective controlled area. Note* only contractors possessing a CaC card are authorized unescorted access to controlled areas. EAL's will be signed by the owner/using commander and authenticated by Security Forces. These documents will be routed through the Security Forces S-5 office.

Contractors shall produce and maintain Entry Authority Lists (EAL’s) IAW AFI 31-101 chapter 7.

(1) Restricted Area Training: The Government controlled area monitors provide initial and follow-on training to contractor personnel who work in Air Force controlled/restricted areas. Air Force restricted and controlled areas are explained in AFI 31-101. The contractor security representative will coordinate with their COR in order for the respective Government controlled area monitor to provide the training.

(2) Implementation of local Procedures: Contractors shall implement local base procedures for entry to Air Force controlled/restricted areas where contractor personnel will work. Local base procedures will be provided at the pre-performance briefing when required. Updates will be provided to the contractor as changes are made in the procedures.

(3) Operating Procedures: When specified in the PWS, the contractor security representative shall develop written procedures for internal circulation control, protection of resources, and to regulate entry into Air Force controlled areas during normal, simulated and actual emergency operations. The procedures shall be written in accordance with

AFI 31-101, The Physical Security Program, 14 FTW Antiterrorism Plan 10-245 and AFI 10-245, The Air Force

Antiterrorism/Force Protection (AT/FP) Program Standards, and coordinated through the Security Forces S-5 office.

2. Personnel and Information Security Requirements

The contractor shall coordinate with their COR for the below requirements as necessary.

a. Common Access Card (CaC) Issuance: AFFARS 5352.242-9001, Common Access Cards (CACs) for Contractor

Personnel is included in the terms and conditions of this contract (Section I or clause section). Any long term contract (defined in CAFB IDP 31-101, CAFB Base Integrated Defense Plan, Enclosure 1 to Tab A to Appendix 3 to Annex C, ID Vetting and Authorization Determinations, Para. g.(1)), meeting contractor CaC eligibility requirements IAW AFI 31-113, Installation Perimeter Access Control and any supplements must obtain a CaC card.

Advance Fingerprints and a NACI investigation must be accomplished prior to being issued the CaC card. Note*

Contractors must complete all CaC card requirements within 20 days of the contractor’s start date. In accordance with AFI 31-501, Personnel Security Management, CaC card issuance and access to Automated Information

Systems (AIS) will be prohibited until the biometric fingerprint data is returned favorable (usually takes a couple of weeks) and the initial SF 85/NACI is transmitted by the Information Protection office to the Office of Personnel

Management. If the biometric fingerprint data results return unfavorable, the individual must wait until the Air Force

Central Adjudication Facility makes a determination on their NACI investigation before being issued a CaC card.

The requesting activity’s Government Trusted Agent will verify this information through the Information Protection office at 434-2603 before authorizing/approving CaC issuance and Government computer access via the Contractor

Verification System (CVS). Once the contractor’s information is approved in the CVS, they will go to the Military

Personnel Section in building 730 to obtain their CAC.

(1) Advance fingerprint biometric data is conducted at the 14 FTW Information Protection office, Bldg 926, Rm

125, when the contractor/sub-contractor has completed their NACI security questionnaire.

FA302218R0004 Page 19 of 35

(2) NACI background investigations are initiated in the Electronic Questionnaires for Investigations Processing (e-

QIP) by the sponsoring agency security manager. Contractors must report to the unit security manager on their first work day to initiate the questionnaire. This questionnaire will be e-mailed to the contractor and may be accomplished from any computer with internet access. The security manager and the 14 FTW/IP office review the questionnaire once completed by the contractor. The contractor will be contacted to report to the 14 FTW/IP office, provide a completed OF 306 (Declaration of Federal Employment), and sign off on all release forms. Then the completed background investigation will be submitted to and investigated by the Office of Personnel Management.

b. Security Representative Appointment: Any contract longer than 6 months in duration and/or if personnel require access to Automated Information Systems and/or if personnel require access to work in or in close proximity to Air

Force sensitive information/areas, the contractor shall designate a security representative for on-base contract performance. At the contractor’s discretion, the security representative may be a full-time position or an additional duty position. The security representative, working in concert with the security manager shall provide employees with initial and recurring training required by AFI 31-401, AETC Supplement 1, Information Security Program

Management, Chapter 8.

c. Reporting Potential Threats: The contractor shall fully comply with AFI 71-101, Volume-1, Criminal

Investigations, and Volume-2, Protective Service Matters. Contractor personnel shall immediately report any information or circumstances which they are aware may be a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their company’s immediate supervisor upon initial on-base assignment and as required thereafter.

d. Reporting Suspicious Activity: Contractor/subcontractor employees working on classified, sensitive and/or high risk projects shall report any suspicious activity or suspicious contacts by personnel to the COR, the Office of

Special Investigations (662-434-2852), 14th FTW Information Protection Office (14 FTW/IP) at (662) 434-2603 or the Government requesting activity’s unit security manager. The Government requesting activity’s unit security manager is also referred to herein as the security manager and will be identified in the Performance Work Statement

(PWS) / Statement of Work (SOW).

e. Handling of Unattended Classified Information: Any person finding unattended classified information will immediately secure it (do not open/read/examine) and contact 14 FTW Information Protection office and the COR.

During non-duty hours, notify 14th Security Forces Squadron (14 SFS) Emergency Communications Center (ECC) at (662) 434-7128 and the COR.

Paragraphs (g) through (i) below are only required when working on CLASSIFIED contracts as identified in the

Performance Work Statement or Statement of Work

f. Security Representative Appointment: The contractor shall appoint, in writing, a security representative for on-base contract performance. At the contractor’s discretion, the security representative may be a full-time position or an additional duty position. The security representative, working in concert with the security manager of the requesting activity shall provide employees with initial and recurring training required by DoDM 5200.01-V3, Information Security Program Regulation, Enclosure 5, and AFI 31-401, Information Security Program

Management.

g. Clearance Level: If access to classified, unescorted access to restricted areas, root access to Government networks, or a security clearance is required under the contract, contractor employees are required to have a security clearance equivalent to the highest level of classified information accessed.

h. Clearance Requirements. The contractor must possess or obtain at least a SECRET facility security clearance prior to performing work on a classified Government contract. The contractor shall ensure that required personnel performing services under this contract possess a minimum of a SECRET security clearance. Unless otherwise stated by the sponsoring military organization, ALL required personnel must possess a SECRET security clearance before contract start date. Replacement personnel will initiate security clearance paperwork within 15 days of hire to their contracting Facility Security Officer (FSO). The contractor’s FSO is responsible for requesting and monitoring security clearances for personnel requiring access and/or eligibility to classified information. Individual

Security clearances are accomplished by the Facility Security Officer (FSO) through the Defense Security Service

(DSS). These security clearances will be submitted and maintained by the contractor at no additional cost to the

Government.

i. AFFARS 5352.204-9000, Notification of Government Security Activity and Visitor Group Security Agreements, applies to all classified contracts. In addition to this AFFARS clause, the following specific requirements shall be complied with. The contractor is required to enter into a Visitor Group Support Agreement (VGSA), submit a DD

Form 254, provide a list of key personnel and a visitor access letter (VAL) through JPAS visit request SMO

CO0JF55J5 (Manual copies annotated in 3.i.(3) below are acceptable if JPAS cannot be accessed). The VAL will be updated as needed in JPAS. The DD Form 254 will be updated every five years or as needed.

(1) DD Form 254. The contractor shall coordinate with their COR and notify the base servicing Information

Protection Office NLT 30 days before on-base performance of the service. The notification shall be accomplished utilizing a Visitor Access List and a DD Form 254. A draft DD Form 254 is to be provided to the COR and 14 FTW

Information Protection office at 14ftw.cip@columbus.af.mil for review before final signatures are accomplished. If the contract award is given in less than 30 days out, the contractor shall notify the 14 FTW/IP immediately.

(2) Visitor Group Security Agreement (VGSA). This agreement shall outline how the contractor integrates security requirements for contract operations with the Air Force to ensure effective and economical operation on the installation.

(3) Visitor Access Letter. If provided electronically, provide as annotated in 3.a. above. If provided manually, the

VAL shall be on contractor letterhead with contract number, location of performance, and highest level of classification contractor employees require access to. Additionally, the VAL will include employee's name, social security number, and current level of security clearance. The VAL shall be validated, signed by the company's

Facility Security Officer (FSO) and provided to the CO, QAE, Security Manager of the requesting activity, and 14

FTW Information Protection Office NLT 30 days prior to the contract start date. If the contract award is given in less than 30 days out, the contractor shall complete and submit the VAL immediately This document must be updated at least annually or when an employee's status or information changes. The contractor shall ensure sensitive information (i.e., Privacy Act information) is properly marked and protected from unauthorized access, disclosure, or manipulation.

3. Physical Security

a. Key Control

(1) Establish Procedures: The contractor shall establish and implement key control procedures in their Quality

Control Plan to ensure keys issued to the contractor by the Government are properly safeguarded and not used by unauthorized personnel. The contractor shall not duplicate keys issued by the government.

(2) Lost Keys: Lost keys shall be reported immediately to the CO. The Government replaces lost keys or performs re-keying. The contractor shall be responsible for the total cost of lost keys, re-keying or lock replacement; the cost may be deducted from the contractor’s invoice.

(3) Government Authorization: The contractor shall ensure its employees do not allow Government issued keys to be used by personnel other than current authorized contractor employees. Contractor employees shall not use keys to open work areas for personnel other than contract employees engaged in performance of duties unless authorized by the Government functional area chief.

(4) Lock Combinations. The contractor shall establish procedures to ensure lock combinations are not revealed to unauthorized persons and ensure the procedures are implemented. The contractor is not authorized to record lock combinations without written approval by the Government functional area chief. Records with written combinations to authorized secure storage containers or Secure Storage Rooms (SSR), shall be marked and safeguarded at the highest classification level as the classified material maintained inside the approved containers. The contractor shall comply with DoDM 5200.01 security requirements for changing combinations to storage containers used to maintain classified materials.

b. Alarm System Operations: Any construction contract that physically alters a building where alarm systems are present, will have the alarms tested and deemed fully operational by the security forces physical security representative before final acceptance. The contractor will work with their COR to coordinate this action. The security representative can be located in the S-5 office at 434-2595. Contractor actions that resulted in damage to a building’s alarm system will be repaired or replaced by the contractor at no cost to the Government.

c. Building Alterations: Alterations to buildings that contain vaults, secure rooms, or open storage areas will ensure modifications are in compliance with DoDM 5200.01-V3, Information Security Program, Appendix to enclosure three. Civil Engineering and Information Protection must be notified to inspect these facilities and ensure compliance before final acceptance. Alterations to buildings that contained controlled areas will ensure modifications are in compliance with AFI 31-101, Integrated Defense. Civil Engineering and Security Forces S-5 section must be notified to inspect these facilities and ensure compliance before final inspection. The contractor will work with their COR to coordinate this action. The contractor will be held liable for failure to comply. Additional work required will be accomplished by the contractor at no cost to the Government.

4. CAFB Traffic Regulations / Vehicle Inspections

a. All personnel working on contractor projects including: contractor employees, subcontractors, suppliers, and surveyors shall fully comply with CAFB traffic regulations (AFMAN 31-116), CAFB Supplement to AFMAN 31-

116 and any updates to base traffic regulations. All employees that drive onto the installation must have a valid driver’s license, current vehicle registration and current proof of insurance. Instructions given by Security Forces personnel at base entry gates shall be complied with immediately. Security Forces use speed detection devices and citations will be issued to violators. Personnel who park on grass or seeded areas will be cited.

b. Contractor or subcontractor personnel shall adhere to vehicle inspections when entering and exiting the base and traffic laws as outlined in the Mississippi Code, DoD regulations, Air Force Instructions, and applicable AETC

Supplements to include AFI 10-245, AFI 31-101, AFMAN 31-116, CAFB Sup to AFMAN 31-116 and CAFB Sup to 31-101 (IDP).

5. Freedom of Information Act Program /Operational Security

Freedom of Information Act Program (FOIA): The contractor shall comply with DoD Regulation 5400.7/Air Force

Supplement, DoD Freedom of Information Act Program, requirements. The regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding For Official Use

Only (FOUO) material.

Operational Security (OPSEC): The contractor shall comply with Air Force Instruction 10-701, Operations Security

(OPSEC). This instruction along with DoD 5205.02, DoD Operations Security Program, sets policy and procedures for all Air Force Personnel (Military and civilian) and supporting contractors in implementing, maintaining and executing OPSEC programs. It describes the OPSEC process and discusses integration of OPSEC into Air Force plans, operations and support activities. Although the entire instruction discusses contractors in various spots, chapter 8 specifically calls out OPSEC requirements within contracts.

6. Records Management and Administrative Support

The contractor shall ensure all records, files, documents and working papers provided by the Government and/or generated for the Government in the performance of this contract remain Government property and are maintained in accordance with established Federal Records Act, Public Law 81-754, and DoD. Government owned records will be segregated from the company-owned records. Actions to destroy Government records can only be based on authorized records disposition schedule (RDS) located at https://www.my.af.mil/afrims/afrims/afrims/rims.cfm. If there is no disposition, records will be maintained until disposition is established. All reports, records, files, documents, maintenance policies/operating instructions and working papers shall be made available as they are requested by the Government QA Personnel or CO.

7. Additional Security Requirements

In accordance with DoDM 5200.01 and AFI 31-401, the contractor shall comply with AFMAN 33-282 - Computer

Security (COMPUSEC), AFMAN 33-152-User Responsibilities and Guidance for Information Systems, AFI 33-

200-Information Assurance (IA) Management, AFSSI 7700 - Emission Security (EMSEC), 7702 -Emission Security

Countermeasures Reviews; applicable AFKAGs, AFIs, and AFSSIs for Communications Security (COMSEC); and

AFI 10-701, Operations Security (OPSEC) Instructions.

8. Antiterrorism/Force Protection

a. In accordance with AFI 10-245, Air Force Antiterrorism (AT) Standards, and applicable supplements the following requirements apply to this contract:

(1) Contractor personnel may be required to participate in installation Anti-Terrorism/Force Protection exercises.

(2) Contractor personnel will comply with the implementation of higher Force Protection Conditions and will ensure that subcontractors are in compliance as well.

(3) Antiterrorism (AT) Level I training is available to all contractor personnel. The Government will provide/make available AT Level I training/information at the contractor’s request. This information can be provided through the

14 FTW contractors AT Level I awareness pamphlets/binders, through computer based training programs, or through the unit/installation Antiterrorism Officer. To request training, contact the 14th FTW Antiterrorism Officer, 14 FTW/CCW at (662) 434-1260.

b. Force Protection Condition (FPCON) levels:

(1) FPCON NORMAL. This condition applies when a general global threat of possible terrorist activity exists and warrants a routine security posture. At a minimum, access control will be conducted at all DOD installations and facilities. What to Expect: Expect to see a routine security posture.

(2) FPCON ALPHA. (AF Modified) This condition applies when there is an increased general threat of possible terrorist activity against personnel or facilities, the nature and extent of which are unpredictable, and circumstances do not justify full implementation of FPCON BRAVO measures. However, it may be necessary to implement certain measures from higher FPCONs measures resulting from intelligence received or as a deterrent. The measures in this FPCON must be capable of being maintained indefinitely. What to Expect: Expect random vehicle checks and increased crime prevention efforts.

(3) FPCON BRAVO. Applies when an increased or more predictable threat of terrorist activity exists. Sustaining

FPCON BRAVO measures for a prolonged period may affect operational capability and military-civil relationships with local authorities. What to Expect: Expect to see closer inspections of vehicles and deliveries, ID checks, and a greater presence of guards.

(4) FPCON CHARLIE. Applies when an incident occurs or intelligence is received indicating that some form of terrorist action or targeting against personnel or facilities is likely. Prolonged implementation of FPCON CHARLIE measures may create hardship and affect the activities of the unit and its personnel. What to Expect: Expect rigorous efforts to inspect vehicles and facilities; you may be required to evacuate the base, or you may not be allowed On-

Base without escort.

(5) FPCON DELTA. Applies in the immediate area where a terrorist attack has occurred or when intelligence has been received that terrorist action against a specific location or person is imminent. FPCON DELTA is usually declared as a localized condition. FPCON DELTA measures are not intended to be sustained for an extended duration. What to Expect: If On-Base, follow security forces instructions; you may be directed to evacuate or seek shelter, if Off-Base, you may be denied access until the incident has been taken care of and additional security measures will delay and interrupt normal routines.

c. The contractor shall ensure areas controlled by contractor employees comply with base operations plans/instructions for FPCON procedures, and local search/identification requirements. The contractor shall be responsible for the above FPCON requirements in all assigned facilities. In addition, in other shared occupancy buildings, the contractor shall assist (based on occupancy) with manning the building/facility Entry Control Point

(ECP). The contractor shall safeguard all Government property, including controlled forms, provided for their use.

At the close of each work period, Government training equipment, ground aerospace vehicles, facilities, support equipment, and other valuable materials shall be secured.

Instructions, regulations and forms can be obtained online at http://www.e-publishing.af.mil/ or by doing a general inquiry on any web-based search engine. If unable to obtain the applicable information, contact the 14th Contracting

Squadron’s contract administrator.

Section J - List of Documents, Exhibits and Other Attachments

LIST OF ATTACHMENTS

Document Name Description Pages Date

Attachment 1 3 2 April 2018 Attachment 2 1 2 May 2018 Attachment 2a 1 2 May 2018 Attachment 2b 1 2 May 2018 Attachment 3 5 5 January 2018 Attachment 4 2 2 May 2018 Attachment 5 8 Tabs 30 April 2018 Attachment 6

SOW_Bldg 216 Ridge Cap Detail Drawings_Service Shop Plumbing Service Shop Wall Sections

WD MS180168

DD Form 1354 AF Form 66 (Excel Document) Contract Insurance Compliance Not. 1 1 January 2018

Section K - Representations, Certifications and Other Statements of Offerors

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.236-28 Preparation of Proposals--Construction OCT 1997

252.204-7007 Alternate A, Annual Representations and Certifications JAN 2015

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238160.

(2) The small business size standard is $15,000,000.00.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.