A1 - PWS LSHV Fans 20 Aug 2026.pdf
PDF 710 KB Posted
- Attached to
- Industrial Hangar Fans Maintenance
- Solicitation number
- FA301626Q0104
About this file
This is a Performance Work Statement (PWS) dated August 20, 2026, for inspection and sustainment of low-speed high volume (LSHV) industrial fans at Joint Base San Antonio, Randolph Air Force Base for the 12th Maintenance Group. The 12-month contract requires preventative maintenance and repair of 21 existing ceiling-mounted industrial fans (Macro Air and Big Ass Fans brands) located across nine hangars at various heights (16 feet to 35 feet), plus replacement of three inoperable fans with new Macro Air Model 24xl2006 units in Hangars 3, 4, and 41.
The contractor must provide all supervision, labor, tools, materials, parts, transportation, and equipment including mechanical lifts to reach ceilings. Key requirements include: annual preventative maintenance performed between months 4-7 of the contract period with 14 calendar days' notice to the Contracting Officer's Representative (COR); monthly inspections of existing fans; initial orientation assessment within 45 days of award; semi-annual inspections at 180 days with findings due within 7 days; and diagnostics and repair services with emergency response within 24 hours, urgent response within 48 hours, and routine response within 2 weeks. Preventative maintenance tasks encompass structural and safety inspections, corrosion mitigation checks, hardware integrity verification, mechanical and electrical systems testing, wildlife intrusion assessments, and user damage reporting. The contractor must submit a Preventative Maintenance Plan within 45 days of award, a Quality Control Plan with proposal, and maintenance documentation in Microsoft Excel format. Performance standards require 100% compliance with preventative maintenance tasks, 80% repair completion rate, 90% compliance with deliverables and warranty management, and 90% diagnostic accuracy with 90% first-attempt repair success. Work occurs during standard base hours (7:30 a.m. to 4:30 p.m., Monday-Friday) or 24-hour flightline hours as needed at no additional cost. The contractor must comply with Air Force Occupational Safety and Health standards, National Electrical Code, NFPA standards, and obtain necessary welding permits, and is responsible for environmental, safety, and health compliance with associated liability for violations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS date 20 Aug 2026 Page 1 of 16
PERFORMANCE WORK STATEMENT
INSPECTION AND SUSTAINMENT OF
LOW-SPEED HIGH VOLUME (LSHV) INDUSTRIAL FANS
12 MXG/MXOP
The 12th Maintenance Group (12 MXG/MXOP) requires a service maintenance contract for the annual preventative maintenance of twenty-one (21) existing ceiling mounted industrial fans and replacement of three (3) of those fans to maintain operational readiness at the Joint Base San Antonio, Randolph Air Force Base (JBSA-Randolph) aircraft hangars.
Effective air circulation in flight line facilities is critical for personnel safety, aircraft performance, and overall mission success. Since installation five years ago, the fans have not been serviced, increasing the risk of mechanical failure. An inoperable fan system poses a significant threat to both personnel (heat-related injuries) and sensitive aircraft components. This contract proactively maintains the integrity and safety of these vital hangar environments and mitigates the risks associated with equipment failure.
1.0 SCOPE. This PWS defines the requirements for a non-personal services to provide maintenance, repair, and installation at JBSA-Randolph. The contractor shall provide all supervision, labor, tools, materials, parts, transportation, and equipment (including any mechanical equipment serving as a platform lift(s) to reach ceilings) to replace inoperable existing fans, perform annual preventative maintenance, diagnostics, and optional repairs for twenty-one (21) fans located across nine (9) buildings.
1.1 Non-Personal Services. The government will neither supervise contractor employees, nor control the methods the contractor performs the required tasks, nor prepare work schedules for individual contractor employees; however, the contractor shall consider the Government’s duty hours and work schedule. If the contractor feels that any actions constitute or are perceived to constitute personal services, the contractor shall notify the Contractor Officer (CO) immediately.
2.0 APPLICABLE DOCUMENTS. The contractor shall comply with the following documents and standards in the performance of this contract:
• Original Equipment Manufacturer (OEM) Maintenance and Safety Manuals
• National Electrical Code (NEC) Standards
• Air Force Occupational Safety and Health (AFOSH) Standards
• National Fire Protection Association (NFPA) Standards
• Unified Facilities Criteria (UFC) and applicable ETL fire safety standards
3.0 REQUIREMENT
3.1 Preventative Maintenance. The Contractor shall perform preventative maintenance (PM) on all fans. To ensure standardized annual intervals, the Contractor shall execute the
PWS date 20 Aug 2026 Page 2 of 16 required maintenance no earlier than four (4) months and no later than seven (7) months into the period of performance. All twenty-one (21) fans shall be inspected, cleaned, and maintained in accordance with Original Equipment Manufacturer (OEM) specifications. The Contractor shall coordinate dates with the COR at least 14 calendar days in advance of the scheduled event.
3.1.1 The contractor shall perform the following specific tasks:
• Inspect hub and airfoils for signs of damage.
• Remove airfoils for further inspection if hub material is cast aluminum.
• Check tightness of all mounting hardware with a torque wrench to OEM specifications.
• Check breather cap and oil levels (if applicable) and inspect for any signs of leakage.
• Check safety cables and guy wires for proper tension and security.
• Check and verify the fan mounting method, ensuring the fan is plumb and level.
• Inspect the entire fan assembly for signs of corrosion, discoloration, pitting, or flaking.
• Visually inspect all welds and supplemental steel supports.
• Verify electrical connections, wiring methods, and raceway isolation.
• Verify fault history, check for proper fuse sizing, and ensure maximum Hz has not been changed in the VFD.
3.1.2 Additional specific tasks shall be conducted by the contractor:
(a) Structural and Safety Inspections on the Fans and Mounting Structures include checking for zero structural defects, fatigue, or buckling left unaddressed after scheduled PM. This includes a visual inspection for obvious defects like cracks, structural deformities, loose components, and signs of overstress or fatigue in the fan blades, mounting brackets, and supports. The contractor shall check for proper blade alignment, secure attachment of all components, and adequate clearances.
(b) Corrosion and Mitigation Inspections include visual inspections of fan components including all surfaces free of unmanaged rust or corrosion; and submit documentation with their findings. During the inspection, check for corrosion on ceiling-mounted industrial fans, examine all fan surfaces and components for corrosion; including a thorough visual inspection of the fan blades (top and bottom), the motor housing, mounting brackets, safety guards, and associated hardware for any signs of rust, pitting, discoloration, or material degradation. The inspection shall encompass areas prone to moisture accumulation or exposure to harsh environments.
(c) Installation and Hardware Integrity Inspections include physical and electrical testing of fasteners, hardware, and safety wires are securely torqued and aligned. This includes verifying the fan's alignment for level and plumb installation, ensuring the
PWS date 20 Aug 2026 Page 3 of 16 blades rotate freely and correctly without obstruction, and confirming the unit is securely mounted according to manufacturer specifications and relevant building codes. The contractor shall also inspect all electrical connections and safety features. Furthermore, they must meticulously check for any missing or loose hardware – from bolts and screws to cotter pins and safety wires – on the fan itself, its mounting brackets, blade assemblies, and any associated guards or components.
(d) Mechanical and Electrical Systems Checks include physical and electrical testing of motors, switches, bearings, and electrical components are certified safe and fully functioning; to include a close examination of all moving parts, such as bearings, shafts, belts, and gears, for signs of wear, damage, unusual noises, or improper lubrication. The contractor shall verify that blades are properly balanced and rotate freely without excessive vibration. Beyond simply identifying damage, the contractor shall also be able to recognize potential design flaws that could lead to premature wear or failure. The electrical inspection shall encompass all wiring, connections, and components, including the motor, starter, disconnect switch, and any associated controls. The contractor shall also check for signs of overheating, loose connections, frayed wiring, corrosion, and proper grounding. This comprehensive approach ensures safe and efficient operation of the fan and minimizes the risk of electrical hazards.
(e) Wildlife Intrusion and Damage Checks include ensuring zero nesting materials, droppings, or pest-related physical damage left unmitigated. The contractor shall meticulously examine every accessible area of the industrial fan and its surrounding environment. This includes a thorough visual inspection of the fan blades for signs of nesting materials, droppings, or physical damage caused by chewing or scratching.
The contractor shall also check the motor housing, electrical components, and wiring for evidence of nesting, gnawing, or contamination from droppings, which can create electrical shorts and fire hazards. The inspection shall extend beyond the fan itself to include the surrounding ceiling space, ductwork, and any nearby openings where wildlife might gain access. Any signs of intrusion, damage, or nesting materials shall be documented and addressed as part of the overall maintenance plan.
(f) MXG User Damage Reporting includes submittals of detailed reports of any improper use, tool marks, or accidental damage from the government staff. The contractor will meticulously examine the fans and associated parts for any signs of damage or irregularities that deviate from normal wear and tears, such as tool marks, stripped screws, damaged access panels, bent components, or improper reassembly. The contractor shall document any findings, noting the specific location and nature of the damage. The report shall provide sufficient evidence to determine if the cause of the damage stems from improper use or inadequate maintenance practices by 12th MXG.
3.1.3 The Contractor shall provide all management, labor, tools, and materials necessary to inspect, maintain, and repair or replace industrial fans, to include associated electrical components, and safety markings. The contractor shall provide the documentation of inspection, maintenance, and repair. Inspections include checks for:
PWS date 20 Aug 2026 Page 4 of 16
• Inherent structural weakness
• Corrosion and Severed item
• Improper installation or Improper use
• Design defects
• Electrical defects (to include electrical switches)
• Failure (signs or evidence of electrical, structural, or mechanical failure)
• Evidence of stress/buckling/fatigue/etc.
• Fan blade defects
• Missing hardware or Loose hardware
• Wildlife related damage or Wildlife intrusion
• Other discrepancies
3.1.4 Site Management. Provide a single point of contact (POC) for management of all industrial fan sustainment activities to communicate to the COR and CO.
3.1.5 Certifications and Licensing. Contractor is responsible and shall ensure any maintenance or repairs requiring licensing or certification shall only be performed by contractor personnel with the appropriate licensing and/or certifications.
3.2 Initial and Semi-Annual Inspections. The Contractor shall perform an Orientation assessment in conjunction with the initial inspection within 45 days after contract award. The orientation shall also serve as a post award conference for planning purposes. Upon the initial or orientation inspection, any obvious defects pertaining to the maintenance and condition of each industrial fan shall be identified, documented as a written report, and reviewed with the COR. Thereafter, semi-annual inspections will commence throughout the life of the contract period. 180 days after contract award, the contractor will perform the Semi-Annual Inspection. The contractor will submit findings NLT 7 days after the semi-annual inspection is completed.
3.2.1 The contractor shall provide the written reports and shall submit the details of the inspections to the COR (including the orientation or initial and all semi-annual inspections).
See Appendix D for further information regarding the format of using Microsoft Excel spreadsheet. This documentation shall be submitted no later than 15 days upon all inspections.
3.2.2 At any time during the inspection, should the diagnostics disclose an immediate work order or maintenance, or if there’s any problems affecting maintenance, the contractor shall report the problem immediately to the COR. See paragraph 3.6.2 for work priorities.
3.3 Existing fans: The maintenance includes monthly inspections on the existing fans, identifying and repairing fatigue or damages parts, and preventative maintenance services.
Type of Fans: Macro Air and Big Ass Fans
PWS date 20 Aug 2026 Page 5 of 16
Location of Fans: *See Appendix E for LSHV location map.
LSHV Fans Locations* Number of Fans Fan Identification Numbers
Ceiling Fan Height from Floor
Hangar 3 2 1, 2 16’ Hangar 4 3 3, 4, 5 16’ Hangar 5 3 6, 7, 8 16’ Hangar 7 1 9 16’ Hangar 16 2 10, 11 16’ Hangar 40 3 12, 13, 14 35’ Hangar 41 3 15, 16, 17 35’ Hangar 42 2 18, 19 20’ Hangar 44 2 20, 21 20’
TOTALS 21
3.4 Replace three (3) new fans: The contractor shall provide all supervision, labor, tools, materials, parts, transportation, and equipment to replace broken fans. The work includes removal of the existing fans, removal of debris, installation of the new fans and all supplemental parts, wiring, securing the fans, testing, and deployment. Contractor shall submit product data and warranties to replace the existing inoperable fans and obtain approval of submittal(s).
3.4.1 The supply and installation of the 3 LSHV overhead ceiling fans and the work includes unit disposal, mounting hardware installation, electrical wiring, safety cable anchoring, and system testing. The replacement of the fans shall include controller testing and commissioning, mounting and securing the brackets inside the hangar and routing all appurtenances as required, such as electrical branch wiring to existing panel box.
Type of Fans: Macro Air Fans (existing model 24xl2006) Location of Fans: *See Appendix E for LSHV location map.
LSHV Fans
Locations Fan Identification
Numbers Ceiling Fan Height from Floor
Hangar 3 1 16’ Hangar 4 4 16’ Hangar 41 17 35’
3.5 Diagnostics and Repair Services.
3.5.1 Diagnostics: The contractor shall conduct a diagnostic evaluation of any fan exhibiting failure to determine the root cause and provide actionable repair recommendations. The diagnostic process shall include visual inspection, electrical system troubleshooting, mechanical assessment, and a review of fault codes. See paragraph details for PMP.
PWS date 20 Aug 2026 Page 6 of 16
3.5.2 Repairs: Upon the Contracting Officer’s (CO) authorization, the contractor shall execute repairs identified in the diagnostic reports to restore the full operational capability of the fan(s).
The contractor shall provide all necessary parts, materials, and labor for authorized repairs and conduct operational testing upon completion.
3.5.3 Repair Quotes and Service Orders. The contractor is responsible for providing a detailed quote for any required repairs. To assist the Government in determining fair and reasonable pricing, the contractor shall include comparative pricing for replacement parts. The contractor shall not proceed with any repair work without prior written authorization from the CO and COR.
Within three (3) business days of completing the on-site diagnostic evaluation, the contractor shall submit a formal Repair Quote to the COR containing the following:
Quote Component Required Details
Diagnostic Findings The root cause of the failure and recommended repair actions.
Breakdown & Price Comparison
An itemized list of parts, labor hours, and materials. For replacement parts, the contractor shall attach at least two (2) vendor prices (e.g., quotes, catalog screenshots, or links) to demonstrate market fairness.
Schedule & Lead Time Estimated time to receive parts and complete the repair.
Warranty Impact Confirm length and warranty coverage.
3.5.4 Estimated Time to Repair (ETR). Coordinate and establish an ETR with the COR for industrial fan repairs. Provide written status as changes occur within 8 hours of a known change to the planned schedule.
3.5.5 Work Clearance and Permits. Coordinate work with the COR and 502 CES, as required, to obtain any necessary welding permits IAW base operating instructions.
3.5.6 Work Priorities. The contractor shall include, in its maintenance plan, procedures for assessing, scheduling, and performing unscheduled emergencies, urgent, and routine corrective maintenance as follows:
• Emergency Maintenance is classified as an immediate response to repair hardware or structural failure that renders the industrial fans unserviceable and/or unsafe. The contractor shall have the capability to assess the emergency conditions within 24 hours of notification. Ceiling mounted industrial fans will need to be inspected if there is a fire emergency inside the hangar. Scope shall be limited to the work necessary to eliminate the emergency conditions (i.e., assessment and temporary repair - except where permanent repair is more practical). The contractor shall initiate actions necessary to render the industrial fan “safe” within 24 hours of assessment. For
PWS date 20 Aug 2026 Page 7 of 16 events so catastrophic that 24-hour alleviation is not possible, written justification and communication must be provided to the COR. Once the emergency condition has been alleviated, the condition shall be re-categorized as urgent or routine.
• Urgent maintenance is classified as a condition that, if not acted upon immediately, is likely to create an emergency maintenance situation or is a safety hazard (example:
a fan blade coming loose). The contractor shall have the capability to be on site to begin assessing the urgent condition within 48 hours of notification. The contractor shall initiate and complete urgent action repairs within 24 hours of assessment unless written communication stating otherwise has been obtained from the COR.
• Routine maintenance is classified as all other maintenance actions. The contractor shall incorporate routine maintenance into a planned work schedule. Contractor shall coordinate at least 2 weeks prior with the COR.
3.5.7 Warranty Coordination. The contractor shall coordinate all warranty claims. In addition, all new fan components and parts shall be covered by a manufacturer's warranty for a minimum of one year. A copy of the warranty with pertinent information shall be provided to the COR and to the CO to maintain in the contract documents. For any fans or components under existing warranty, the contractor shall ensure repairs do not void existing warranties and shall not perform any work that could invalidate a warranty without prior written authorization from the COR.
3.5.8 Scheduling. Schedule work with the COR to minimize disruptions to mission requirements. Coordinate inspections 30 calendar days in advance and schedule with COR.
See paragraph for scheduling emergencies or urgent maintenance. For cancellations, the contractor shall notify the COR one week in advance and no later than 24 hours prior to a final urgent notice.
3.5.9 Disruption. Coordinate disruptions with the COR prior to starting work. Provide notification at least 14 working days prior to disruption (e.g., power outages, blocked access, inspection processes, maintenance processes, repair processes, cleaning, and/or spraying) for work other than emergency or urgent maintenance. Disruptions shall provide the least amount of customer inconvenience. Notify the COR (format to be provided by the COR) to confirm the disruption within 24 hours of expected downtime due.
3.5.10 Access to Facilities. The contractor shall be allowed access to government facilities subsequent to transition start date. Access shall not interfere with the work efforts others.
COR must arrange access to ensure interference does not occur. The contractor shall be able to familiarize personnel with aircraft hangars.
3.5.11 Assuming Functional Responsibility. The contractor shall designate a primary Contract Manager (CM) who shall have full authority to act on all matters relating to the contract and who will assume responsibility for all executable functions. The contractor shall submit the name and phone number(s) to the Contracting Officer (CO) and COR.
PWS date 20 Aug 2026 Page 8 of 16
4.0 SERVICES DELIVERY SUMMARY (SDS). The SDS table below outlines the performance objectives and minimum performance standards:
# Performance Objective PWS Paragraph Performance Standards
1 Preventative Maintenance 3.1 3.2
100% compliance with preventative maintenance tasks. 80% of repairs were carried out on equipment.
2 Deliverables, Warranty, and Preventative Maintenance Plan.
3.7 5.0 5.3
Appx. B
90% compliance with deliverables, warranty calls, and records of diagnosed faults.
Unscheduled Maintenance & Repairs, and Diagnostics & Repairs
Urgent Assessment Responses Emergency Assessment Responses Routine Assessment Responses
3.5 3.5.6
90% accurately diagnose faults and restore fans to full operational capability, and 90% of the repairs are successful on first attempt.
Urgent response is within 48 hours.
Emergency response is within 24 hours.
Routine response is within 2 weeks.
4.1 General Guidance: Only the Contracting Officer’s Representative (COR) or the designated alternate COR has the authority to inspect, accept, or reject all deliverables.
4.2 Quality Assurance: The government is responsible for evaluating the contractor's performance. For the performance objectives listed in the SDS, the COR shall follow the methods of surveillance specified in the Quality Assurance Surveillance Plan (QASP). The COR shall record all surveillance observations. COR surveillance of tasks not listed in the SDS or by methods other than those listed in the SDS may occur on an as needed basis.
4.3 Quality Assurance Meetings. The Contracting Officer (CO) may require the contractor to meet with the CO, Contract Specialist (CS), COR, and other government personnel as deemed necessary. The contractor may request a meeting with the CO when necessary.
Written minutes of any such meeting shall be recorded by the COR. A copy of the minutes shall be sent to all attendees via e-mail, and a copy of all recorded minutes shall be provided to the contractor, and a copy shall be placed in the official contract file for recordkeeping purposes. In the event the contractor does not concur with any portion of the minutes, exceptions to the minutes shall be provided, in writing, to the CO within ten (10) working days following receipt of the minutes. Final resolution to exceptions taken by the contractor resides with the CO.
4.4 Contractor’s Quality Control Plan (QCP). The Contractor shall provide and maintain a QCP that includes the requirements incorporated into this PWS. A short version QCP shall
PWS date 20 Aug 2026 Page 9 of 16 be submitted with quote; however, a comprehensive final QCP shall be submitted to the Contracting Officer within thirty (30) days of the date of award and shall be approved by the Government. The contractor shall be responsible for the expectations of the services, the technical elements of the work, and the actual performance of each; plus, the responsiveness and adherence to schedules, the management of contractor team's efforts including the level of understanding of the mission.
4.5 Performance Management. The contractor shall develop, document, implement, maintain, and continuously improve a comprehensive QCP that assures compliance with all requirements of this PWS in general, and specifically address those items identified in the SDS table. The QCP shall address frequency/interval, numbers and types of quality control (QC) inspections, the qualifications of personnel accomplishing those tasks, and how the contractor shall control the quality of any subcontractors. The contractor shall submit the QCP to the CO with their proposal.
4.6 Quality Control Manager. The contractor’s QC Manager shall lead the contractor’s quality control efforts in establishing and implementing the QCP. The contractor shall train personnel in effective methods and techniques for inspecting the contractor’s conformance to requirements. The contractor shall act as the focal point for inspections, analysis of inspection results, corrective actions, and reports.
4.6.1 Performance Evaluation. Contractor performance outputs are subject to surveillance by a government COR to ensure PWS compliance. At a minimum, the contractor shall all tasks listed in the subparagraphs below when it comes to performance evaluation.
4.6.2 Non-Conformances. Take effective corrective action(s) for any non-conformance identified during internal or government surveillance.
5.0 DELIVERABLES AND OTHER REPORTING REQUIREMENTS - Acceptance of final documents is subject to Government approval. All deliverables shall be submitted via email to the
COR.
5.1 Maintain and electronically submit maintenance documentation to the COR in a Microsoft Excel spreadsheet format as recommended in Appendix C, Maintenance Documentation.
Maintenance documentation shall include industrial fan condition (serviceable/unserviceable – see definition), scheduled/unscheduled maintenance activities, discrepancies, corrosion control actions, repairs needed, corrective actions, identified trends in discrepancies, and metrics.
5.2 All documentation shall be considered an integral part of this contract and shall be nonproprietary in nature. The maintenance documentation shall be submitted if any activities have been performed or changed. If no activities have been performed, documentation shall be submitted stating the reason(s) why it was not needed. All semi-annual documents shall be reviewed with the COR and submitted for the previous 180 days not later than the 15 calendar days after the start of the next semi-annual inspection.
PWS date 20 Aug 2026 Page 10 of 16
5.3 Preventative Maintenance Plan (PMP). The contractor shall submit a plan that provides details on how the contractor shall address and successfully complete all the requirements as stated in all the paragraphs of section 3.0 and 5.0 of the PWS. This will include how the ceiling mounted industrial fans shall be maintained and the performance of preventative maintenance in accordance with manufacturer’s recommendations. The PMP shall be submitted to the COR and CO NLT 45 days after contract award and shall be non-proprietary.
5.4 Reference Material. Maintain copies of applicable industrial fan manuals, drawings, specifications, etc. for use in inspection, preventative maintenance, and/or repair IAW Industry standards. Provide copies to the COR, as requested.
6.0 HOURS OF OPERATIONS
6.1 Period of Performance: 12 months.
6.2 Duty Hours. Base hours of operation are from 7:30 a.m. to 4:30 p.m. Monday through Friday. Flightline hours are 24 hours per day. The contractor may find it necessary to deviate from the normal base hours of operation to ensure timely completion of work. If the contractor determines it is necessary to work non-standard hours, the work will be completed at no additional cost to the Government. Work scheduled but not accomplished because of base closure due to weather, exercise, or actual alert, will be accomplished as soon as possible after reopening the base.
6.3 Scheduled Holidays. Below is a list of the holidays recognized and published by the government. Family days and down-days declared by the AFAC Commander is considered a duty day and is not included in the definition of a holiday.
• New Year's Day January 1
• Birthday of Martin Luther King, Jr. Third Monday in January
• Washington's Birthday Third Monday in February
• Memorial Day Last Monday in May
• Juneteenth National Independence Day June 19
• Independence Day July 4
• Labor Day First Monday in September
• Columbus Day Second Monday in October
• Veterans Day November 11
• Thanksgiving Day Fourth Thursday in November
• Christmas Day December 25
Note: Any of the above holidays falling on a Saturday may be observed on the preceding Friday; holidays falling on a Sunday may be observed on the following Monday depending on which day the recognition day is declared.
7.0 SAFETY
7.1 Contractor Liability. The contractor shall be liable and responsible for non-compliance of
PWS date 20 Aug 2026 Page 11 of 16 environmental safety and health (ES&H) provisions and pay all fines and fees resulting from improper contractor actions and/or processes.
7.2 Spill Notification. Notify the CO and the COR immediately of any pollution incident, as per base requirements. The contractor shall also report spills to the base Environmental Office at 210-652-4668.
7.3 Safety and Health (S&H) Program. Establish responsibilities and procedures required to effectively administer compliance with Air Force (AF) Occupational Safety and Health (AFOSH) and Occupational Safety and Health Administration (OSHA) Standards.
7.4 Safety Notification and Reporting. Notify the CO and the COR of any mishap involving contractor personnel, AF assets, or AF operations, which resulted in an injury, illness, or damage.
Establish internal mishap notification procedures and brief all contractor personnel. Document and report any mishaps to the COR immediately. Provide a copy of all mishap reports to the CO and the COR. Injuries to contractor personnel shall be reported IAW OSHA requirements.
Maintain copies of all mishap reports for one year.
7.5 Site Conditions. Work will take place in an active hangar. To minimize outage and down time all work will need to be coordinated with 12th Maintenance Group. The Contractor shall furnish and maintain adequate barricades, and warning signs, on the job site. The contractor shall clean up their debris on daily basis when required. When parking near the hangars, vehicles will remain in the designated parking lot unless they are required inside the hangar to service the industrial fans. If the contractor requires access to the flightline, the contractors must comply with appropriate speed limits and aircraft wing tip clearance requirements (5 MPH within 25 feet of aircraft, 10 feet circle of safety, etc.). Prior to entering or driving on the flightline the contractor will need to complete Airfield Controlled Area Training and Airfield Driver’s Training with JBSA Randolph Airfield Management. The contractor must notify Airfield Management no later than 7 days prior to schedule Airfield Controlled Area Training and Airfield Driver’s Training.
8.0 SECURITY
8.1 Traffic Laws. The contractor and its employees shall comply with base traffic regulations.
8.2 Weapons, Firearms, and Ammunition. Contractor employees shall not possess weapons, firearms, or ammunition on themselves, or within any vehicle, while on any military installation.
8.3 Laws, Directives, and Regulations. Contractor shall comply with Security procedures.
8.4 Terminations. Remove employees identified as potential threats to the health, safety, security, general well-being or operational mission of the installation or its population, or failure to comply with laws, regulations, and directives of the appropriate MAJCOM.
APPENDIX A - DEFINITIONS
Configuration Management – physical attributes or characteristics. Installation of original hardware/equipment.
Corrosion – the electrochemical oxidation of metals in reaction with an oxidant such as oxygen. Can occur in any environment.
Fatigue – the progressive and localized structural damage that occurs when a material is subjected to cyclic loading.
Fracture – the (local) separation of an object or material into two, or more, pieces under the action of stress.
Fraying – to strain; chafe. To wear away (the edges of fabric, for example) by rubbing. To become worn away or tattered along the edges. A frayed or threadbare spot, as on fabric.
Hardware – a general term for items such as fasteners, bolts, washers, wire, turn buckles, etc.
Performance Work Statement (PWS) – specifies the government's requirements for services to be performed.
Serviceable – safe for use and discrepancies do not pose a hazard to personnel, equipment and/or aircraft. Unit can expand upon specifics for this definition.
Structural Failure – loss of the load-carrying capacity below manufacturer’s design. Can refer to a component or member within a structure or of the structure itself.
Unserviceable – presents a danger to personnel, equipment and/or aircraft/flight safety. Unit can expand upon specifics for this definition.
Wear – erosion or sideways displacement of material from its "derivative" and original position on a solid surface performed by the action of another surface. Wear is related to interactions between surfaces and more specifically the removal and deformation of material on a surface as a result of mechanical action of the opposite surface.
APPENDIX B - DELIVERABLES
# DELIVERABLE PWS
REFERENCE DUE DATE
1 Preventative Maintenance Plan (PMP) 5.3 45 days after contract award
2 Initial and Semi-Annual Maintenance 3.2 Reports are due within 7 days
3 Semi-Annual Inspection Report 3.2 NLT 7 days after inspection is accomplished
4 Work Schedules 1.1 NLT 30 days before work is
5 Quality Control Plan (QCP) 4.4 To be submitted with proposal
APPENDIX C - MAINTENANCE DOCUMENTATION
LSHV Fans Maintenance Documentation Sheet
Fan # Date Inspected Discrepancy Corrective Action(s)
Corrosion Control Actions
ECD Contractor Repair Needed
Repair Cost
APPENDIX D - SEMI-ANNUAL INSPECTION REPORT
LSHV Fans Maintenance Documentation Sheet
Fan # Date Inspected Discrepancy Corrective Action(s) Corrosion
Control Actions ECD Contractor Repair Needed
Repair Cost
APPENDIX E – LSHV FAN
LOCATIONS:
2 Fans
2 Fans