Single Source Justification_EVAPCO AT212-2H9 (Cooling Tower (FA301626Q0034)_R.pdf
PDF 624 KB Posted
- Attached to
- EVAPCO AT212-2H9 Cooling Towers Federal contract opportunity
- Solicitation number
- FA301626Q0034
About this file
This is a Single Source Justification (Simplified Acquisition) form documenting a federal procurement action. The contracting activity is 502 CONS/PKAB, and the project involves the purchase and installation of a cooling tower for FSH B624, with an estimated contract cost that is redacted. The Purchase Request/Local ID Number is F2M3CB6016A002, and this action is not classified as a Bridge Action.
The procurement requires the removal and replacement of an existing Evapco Cooling Tower. The justification for single source solicitation identifies Evapco as the only manufacturer that meets the technical requirements and performance specifications necessary for system integrity, compatibility, and long-term reliability. Key salient characteristics include PVC drive eliminators with drift loss of 0.01% of recirculating water rate and all type 304 stainless steel basins with factory welded seams. The existing infrastructure and design specifications for B624 are aligned with Evapco's proprietary connection standards, control integration, and structure configurations; substituting alternative manufacturers would require significant redesign and re-engineering, resulting in delays and increased costs. To preclude future single source awards, the agency will conduct market surveillance by regularly monitoring industry trends, new technologies, and emerging vendors through trade journals, industry publications, and market reports. The Contracting Officer determination was made on February 2, 2026, in accordance with FAR 13.106-1(b)(1).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI-EVAPCO AT212-2H9 Cooling Tower (Solicitation FA301626Q0034).pdf | ||
| EVAPCO Cooling Tower JBSA Fort Sam Houston photo.pdf | ||
| Cooling Tower- Lackland-Solicitation FA301625Q6106- Amendment Letter 0001.pdf | ||
| Synopsis and Solicitation - FA301626Q0034 EVAPCO Cooling Tower.pdf | ||
| Attachment 2-EVAPCO Cooling Tower SPECS.pdf | ||
| Attachment 1-Salient Characteristics EVAPCO Cooling Tower.pdf | ||
| Synopsis and Solicitation - FA301626Q0034 EVAPCO Cooling Tower.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .