Attachment 5 - Contractor Questions - ANSWERED.pdf
PDF 95 KB Posted
- Attached to
- HoneyWell Vindicator Alarms
- Solicitation number
- FA301625Q6197
About this file
This document is a Contractor Questions file related to an Intrusion Detection System (IDS) installation project for an ICD-705 compliant facility. The questions address critical infrastructure details such as power backup, facility layout, and security system requirements. Key responses include: no facility-wide generator exists (only under-desk UPS), ceiling heights are approximately 12 feet, and all walls (including interior walls) extend to the roofline with no raised flooring. The facility plans to gradually implement ICD-705 compliance, with initial IDS installation focused on specific areas and potential future expansion to the entire facility. The document indicates specific annotations for camera locations, access control card reader placements, and references to areas needing intrusion detection system coverage.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Questions
1. Does the building have an existing generator or building UPS that the ICD-705 area IDS can connect to for meeting the 24-hour backup requirement?
There will not be a generator for B1003, there will be under desk UPS but not one for the entire facility.
2. On the floorplan, can you please outline the ICD-705 area perimeter in red?
3. On the floorplan, can you please outline non-ICD-705 areas that are in need of IDS in green?
Eventually the entire facility with be ICD705 compliant and we would like to have the IDS installed to accommodate this expansion.
4. On the floorplan, can you please indicate where you want the camera located with
“CAM”?
2 locations annotated with “*”
5. On the floorplan, can you please indicate where you want access control card readers located (on which doors) with a “CR”?
Both card reader locations are already annotated with ACR and PCR.
6. Can you please estimate ceiling heights for the various areas in need of IDS?
Area highlighted in yellow is roughly 12’
7. For ICD Areas, is there any raised flooring? Do perimeter walls go all the way up to the roofline?
No raised floors and all the walls to include the interior wall go to the roofline.