This document is a Questions and Answers (Q&A) file for a heating boiler replacement project at JBSA Randolph, identified by solicitation number FA301625Q0218. The Q&A covers critical project details including boiler room location (basement with steps), venting configuration (new venting through the roof), and specific technical requirements. Key contractor responsibilities include performing lock out/tag out procedures, installing 1.5' thick fiberglass insulation with PVC or metal jacketing on hot water and backflow preventer piping, and providing temporary heating during the project. The building's existing DDC system is Johnson Controls, and the solicitation does not meet the Buy American Act. No hazardous materials were identified on mechanical piping or hangers, and the contractor will be provided with floor plan pictures and details about the boiler room access.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Heating Boiler – JBSA Randolph – FA301625Q0218
Questions: Answers:
Could we get pictures of the floor plan of this building?
Provided.
Does the boiler room go directly outside or are there steps?
There are steps leading down into the basement.
How far up does the venting go? As the venting that is there is not sufficient and a new boiler will need new venting.
There is new venting in place from a recent project, should just need to hook up to it, venting goes up through the roof.
Planholders list/bidders list or mandatory prebid list
Not available.
Confirm that the bid date and time listed are unchanged
Date and time are unchanged. Please refer to Solicitation response due date.
Any addenda that have been released, please attach them to this response
Addenda to FAR 52.212-1 and 52.212-2 only applicable and included in the RFQ.
Construction cost estimate or a construction cost range for the project
Not to be provided.
Will the contractor be responsible for the Lock Out Tag Out of the electrical, gas, and other associated piping?
Yes, the contractor is responsible for lock out, tag out.
What insulation specifications will be required for the heating hot water piping and accessories?
Must be 1.5’ thick made of fiberglass with PVC cover, if exterior piping must be metal jacketing.
What insulation specifications will be required for the backflow preventor piping?
Must be fiberglass insulation with metal jacketing
Will the contractor be required to provide temporary heating?
Contractor will provide temporary heating
What is the building’s current DDC system?
Johnson Controls
Is this project tax exempt? See FAR 52.212-4(k) and FAR 29.302 Does the solicitation meet the Buy American Act?
No.
Is there hazardous materials on the mechanical piping or hangers?
No.