This document is a Questions & Answers file for a Request for Quote (RFQ) FA301625Q0203 for a Variable Refrigerant Flow Condenser System Replacement at B.2261. The project involves replacing 10 out of 14 existing fan coils, with work to be performed during standard hours from 0700-1700. Key requirements include utilizing existing line sets, salvaging and reinstalling lightning protection, and submitting contract-specific QA/QC and Safety Plans. Contractors are permitted to use alternative manufacturers like Carrier VRF systems, provided they can use existing line sets without voiding the manufacturer's warranty.
The solicitation has been extended to 25 August 2025, with the project being a tax-exempt commodity requirement. Technical specifications include a 7500 BTU load for fan coils, a crane setup on the south and east sides of the building, and reconnection of existing lighting bonds. The contractor must have a superintendent on-site during all work hours, and the project allows flexibility in manufacturer selection and lightning protection installation, with an emphasis on maintaining existing system components where possible.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers
Variable Refrigerant Flow Condenser System Replacement for B.2261
RFQ: FA301625Q0203
Q Planholders list/bidders list or mandatory prebid list
A Not applicable, this is a commodity requirement.
Q Confirm that the bid date and time listed above are unchanged
A Please check SAM.gov. The solicitation due date has been extended to 25 August 2025.
Q Any addenda that have been released, please attach them to this response
A Please check SAM.gov.
Q Construction cost estimate or a construction cost range for the project
A Not applicable, this is a commodity requirement.
Q Where can the crane set up?
A The crane can be positioned on the south end of the building and east side of the building
Q Will after-hours work be allowed?
A No after hours are required. A set time from 0700-1700
Q Can information be provided on which indoor cassette goes to each outdoor unit?
A Will provide Diagram for reference. On the diagram it shows 14 fan coils but we’re only replacing 10. The other 4 are out of service.
Q Can we get an itemized list of model and serial numbers?
A Model Number for Condenser CHDX07263
Q Are “As Built” available?
A Yes, providing what I could find through our archives.
Q Will the contractors be blocked from entering work areas on certain days and hours?
A No, we will coordinate with the Facility Manager and set a schedule.
Q Will the contractor be responsible for Lighting Bond
A The contractor will be responsible for reconnecting existing lighting bonds to the new outdoor condensers. Will include to SOW.
Q In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles?
A Yes, a reminder that the superintendent must be on site all times when workers are present.
Q Are contractors required to issue a contract specific QA/QC Plan?
A Yes, contractors must outline their approach to ensuring that the work meets the specified quality standards, including inspection procedures, testing protocols, and corrective action processes.
Q Are contractors required to issue a contract specific Safety Plan?
A Yes
Q Is this project tax exempt?
A Yes.
Q What are the load requirements in BTU/Tonnage for each of the fan coils serving the individual rooms?
A 7500 BTU
Q The SOW states that the contractor is responsible for replacing the drain connections. Is it safe to assume that the condensate pumps are in good working order and that all gravity drains are clear of obstructions and are draining properly as well?
A Yes
Q The SOW of work states that the contractor is to flush the existing line sets and blow out any existing oils and debris with compressed nitrogen. According to manufacturer specifications from several manufacturers it is not recommended to use existing line sets that have had r410a in them with the new refrigerants that need to meet the new EPA standards such as r32 or r454b, this may void any factory warranty. Also, the manufacturer is recommending that they engineer the line set sizing based off load calculation and tonnage required for the amount of fan coils being utilized. Are we to figure in new line sets for this project based off the information given?
A No, contractors must utilize the existing line sets and must provide a manufacturer that will allow this method and keep manufacture warranty.
Q Can a table for all the condensing units and fan coil units be provided which shows line voltage and phase to each of the condensing units and each of the fan coil units?
A Yes, I will provide this information from what I found through our archives.
Q Will the existing lightning protection aerials down conductors and clamping devices mounted at the top of the condenser units be salvaged and reinstalled on the new condensing units?
A Yes, contractor shall salvage and reinstalled the existing lighting protection.
Q Will the contractor be allowed to remove and install lightning protection system on the condensing units at their discretion, or will the contractor be required to subcontract a licenses lightning protection contactor?
A Yes, contractor will be allowed to remove and install lighting protection system on the condensing units at their discretion.
Q Can the existing mechanical HVAC drawings to include the mechanical schedules which show the condensing units and fan coil units which are be replaced be provided?
A Yes, I can provide diagrams from what I can from our archives folder.
Q Can a bid extension be granted to allow more time to relay RFI answers to subcontractors as the proposal is due on August 18th?
A Yes
Q I am reaching out to inquire whether an alternative product would be acceptable under
Solicitation FA301625Q0203. Our partner does not represent Sanyo but is an authorized representative for Carrier VRF systems. We would like to confirm if proposing a Carrier-based solution in place of Sanyo would be acceptable for consideration.
A Yes, as along as manufacture will allow to utilize existing lines sets that have had R410 in them and will not void the manufacture warranty.