FA301624Q5226 Atch 3 Statement of Work Amend 001.pdf
PDF 94 KB Posted
- Attached to
- Purchase and Installation of Hoists
- Solicitation number
- FA301624Q5226
About this file
This document is a Statement of Work (SOW) for the purchase and installation of two 5-ton electrical hoists in Hangar 4 at Joint Base San Antonio - Randolph. The contractor shall inspect and certify the existing hoist railing system, remove any obstructions, install the new hoists, and provide training to 12th Maintenance Group personnel. The work must be completed within 90 calendar days and will be performed while the facility is occupied, requiring coordination with the 12th Maintenance Group. The contractor is responsible for providing all required tools, parts, materials, and supplies. The government will provide utilities and emergency services. Safety and hazardous material handling requirements are specified. The contract opportunity has a Solicitation Number of FA301624Q5226 and is being issued by the Department of the Air Force Air Education and Training Command.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement Of Work
Purchase and Installation of Hoists for Hangar 4 (T-7)
JBSA Randolph (ESU)
1 Jul 24 Amended information is highlighted.
PART 1 - GENERAL REQUIREMENTS:
1.1 PROJECT SCOPE: The contractor shall purchase and install two 5-ton electrical hoists in hangar 4 on Joint Base San Antonio - Randolph using existing hoist railing at a height of 45 feet on both the east and west end of the hangar. The existing rail system will be inspected and certified for hoist use.
1.2 REQUIREMENTS: The facility will be occupied while the work is being performed within the hangar. Contractor will work in coordinate with 12th Maintenance Group while work is being performed.
1.3 PROJECT DESCRIPTION:
1.3.1 Contractor shall inspect and certify the existing supporting rail system is still rated at
10,000 lbs.
1.3.1.1 If inspection reveals any defects in the existing system, the contracting office must be notified of any additional work that needs to be done for approval before proceeding.
1.3.2 The contractor will remove any obstructions to the rail system that would prevent its use when the hoists are installed.
1.3.3 Contractor shall provide rail system inspection results and related reports to the 12th
Maintenance Group upon contract completion.
1.3.4 Contract shall purchase two 5-ton rated electrical hoists and install them on hoist rail system if the rail system is rated to use them. One hoist will be installed on the east rail system and one hoist will be installed on the west rail system.
1.3.5 The hoist must be able to traverse the length of each corresponding rail system.
1.3.6 Each hoist must have a manual control box that is sufficient in length that the user can operate the hoist from a safe distance when moving aircraft engines.
1.3.7 Contractor shall install any required safety markings.
1.3.8 Contractor shall also provide initial hoist training to 12th Maintenance Group personnel.
1.4 GOVERNMENT FURNISHED SERVICES: The government will provide utilities (water and electricity) and emergency, including fire and security police response.
1.5 TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations and are subject to random vehicle speed control checks. Contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, is prohibited while driving on military installations in San Antonio, TX.
1.6 HAZARDOUS AND/OR TOXIC MATERIALS: A hazardous material (HAZMAT) is one that poses a risk to the health and safety of the public, and/or the environment if not properly controlled during the handling, storage, manufacture, processing, packaging, use, disposal, or transportation. Hazardous materials may be elements or compounds, and can be found as gases, solids, or liquids. HAZMAT poses a risk to the health and safety of the public, and/or the environment. Hazardous chemicals are defined under Sec. 1910.1200 (c) of Title 29 of the Code of Federal Regulation (CFR). All
HAZMAT brought to the job site shall require the contractor to fill out an AF Form 3952 for each item for submission to the Hazardous Material Pharmacy, which must be submitted no later than 5 calendar days from the preceding month. Additionally, the contractor is required to submit Material Safety Data
Sheets (MSDS) as directed by the clause entitled Hazardous Material Identification and Material Safety
Data (FAR 52.223-3). The Contractor shall submit a monthly actual usage report of all hazardous/toxic materials brought onto the base during the preceding month to the HAZMAT Pharmacy (IAW AFI 32-
7086, Hazardous Material Management) no later than the 5th calendar date of each month as well.
PART 2 - SPECIFIC REQUIREMENTS:
2.1 SITE CONDITIONS: The contractor shall furnish and maintain adequate barricades and warning signs at the job site. The contractor shall clean up debris on a daily basis.
2.2 CODES AND REGULATIONS: All work shall be accomplished in accordance with the
Contract Specifications, applicable Uniform Building Codes, Air Force Base Regulations, and
OSHA Requirements.
2.3 INSPECTION AND ACCEPTANCE: A final inspection of completed work will be conducted by the project manager, contractor and designated 502 CES personnel. Discrepancies identified during inspections shall be corrected prior to final payment.
2.4 HOURS OF WORK: Normal duty hours are from 7:00 A.M. to 5:00 P.M., Monday through Friday, except on government holidays.
2.5 PERIOD OF PERFORMANCE: The performance period is to be completed in 90 calendar days, this will include lead time for equipment purchase, manufacture, and shipping. Contractor will coordinate with the contract POC 48 hours before the actual work is to commence to minimize mission impact or deficiencies that may occur during the normal work week.
2.6 CLEAN-UP: At the end of each working day, the contractor shall clean up the work site by removing all debris. Clean up of the work site shall include the repair area(s), stage area(s), parking and eating area(s) and any other area(s), affected by the repair process. Any dirt or mud tracked on the any base street, parking area, sidewalk, patio, driveway, or building shall be cleaned daily.
2.7 CONTRACTOR FURNISHINGS: All required tools, parts, materials and supplies shall be supplied by the contractor and should be on hand before beginning work. The contractor will be required to furnish all supervision, labor, transportation materials, lifting materials, tools, incidentals, dumpsters, and any other applicable equipment. The contractor shall also provide barriers and signs to prevent unauthorized personnel from entering the work area while the contractor is removing and installing equipment or material.
2.8 CONTRACTOR WASTE AND DISPOSAL: All contractor-generated refuse and waste shall be stored in a waste container provided by the contractor and hauled from the project site to a disposal area to be selected by the contractor. This disposal area shall be located outside the physical boundaries of the project. Refuse disposal shall comply with the current disposal environmental requirements. The work site shall be kept neat, orderly and safe for workmen at all times. On-site dumpsters, if furnished by the contractor, shall be coordinated with CE
Project Manager. All manifests shall be obtained prior to the transportation of refuse off-site.
Appendices:
A. Questions and Answers
Appendix A
Questions and Answers
Q1. What is the electrical requirements are needed for these hoists? Is it 480 volt or 220 volt?
A1. Either 220-480 volts depending on the type of hoist that is installed, as long as it has a 5 ton capacity.
Q2. Will these need to be single or three phase?
A2. 3 Phase.
Q3. Are previous load test reports available?
A3. No reports available.
Q4. Is a full periodic inspection per ANSI B30.17 and an engineering check sufficient per requirement or is a new load test required per this specification?
A4. No, a one time inspection load test will be required.
Q5. Can any information about possible obstructions or a picture of the monorails be provided to identify possible obstructions that will need to be removed?
A5. Yes, we can provide pictures of the rail areas.
Q6. Is electric being provided to the hoist? If so, via what means and will it cover the length of the monorail? If it is not being provided, what is required? What is the voltage?
A6. No, the contractor will need to provide electricity to the hoist. Electricity will be provided using an in-line retractable power cord reel. No, it will not cover the entire length of the rail only
60-75 ft from the end of the rail. The voltage depends on the hoist being used (220-480 volts).
Q7. Can you confirm if the work site has a man lift?
A7. No man-lift available.
Q8. In reference to para 1.3.1, Contractor shall inspect and certify the existing supporting rail system is still rated at 10,000 lbs. Please confirm any deficiencies shall be Additional Work.
A8. Yes, if any defects are noted they need to be repaired, have contingency plan for repairs included on the quote.
Q9. In reference to para 1.3.3 Contractor shall provide rail system inspection results and related reports to the 12th Maintenance Group upon contract completion. Please confirm visual inspection is adequate.
A9. Yes. Minimum expected reports are 1. Rail weight certification and 2. Hoist weight certification.
Q10. Please confirm that the hoist and trolley motions are motorized.
A10. Yes, motorized.
Q11. Please confirm the size and dimension of the existing monorail especially the bottom flange.
A11. Bottom flange is 5 inches wide
Q12. Please provide the Electrical Hazard Classification of the hoist.
A12. Non-hazardous area
Q13. Please confirm the existing festoon or tagline cable supplying power to the hoist is to be reused.
A13. There is no current hoist or power lines installed. Power will need to be supplied from the west wall power source to each hoist.
Q14. Please provide the required lift.
A14. 5 Tons
Q15. Please provide the elevation of the bottom of the monorail.
A15. 20ft
Q16. Please confirm that you intend to procure a handheld wired pendant connected directly to the hoist.
A16. Yes
Q17. In reference to para 1.3.7 Contractor shall install any required safety markings. Please provide the requirements or a standard which we are to follow to figure this out for ourselves.
A17. Contractor will provide ANSI, ASME and OSHA Standard markings as required.
Q18. How will the power be supplied to the hoist? Cable reel? Festoon? Conductor Bar?
A18. Cable reel.
Q19. Are we suppling all necessary lift equipment?
A19. Yes the contractor will need to supply their own lift equipment.
Q20. Will we need site training to access the facility? And/or background check, drug screen, ETC).
A20. Yes, training is required if you need to drive on the flightline. All contractors entering the base will need to have a visitor’s pass processed by the visitor’s center, which does include a background check.
Q21. Will we need company badges or documents showing all of our safety training? (Scissor lift, forklift training etc.)
A21. Contractors should be identifiable as contractor personnel, but there is no need for badges showing all training.
Q22. Is an inspection & certification required for the beam? If so, we’ll have to sub this out to an engineering firm.
A22. Yes, the beam must be inspected and certified before use.
Q23. Do we need to provide test weights to perform a load test ?
A23. Yes
Q24. Will we be able to drive our service trucks to the work area inside the hangers? If not, we’ll have to possibly rent a powered cart.
A24. You will not be able to drive service trucks into the hangar, you can only park outside the hangar. If power cart is required, add this to your quote.
Q25. Do you have a trolley and just need a hook mount hoist?
A25. No trolly installed, trolly needs to be part of the hoist assembly.
Q26. Suspension: Push Trolley or Motorized Trolley?
A26. Motorized trolly.
Q27. What is the Lift Height: Comes with 20ft (longer lengths available)
A27. 20ft
Q28. Single or dual speed hoists?
A28. Dual speed.
Q29. Power cord length? (comes with 15ft. longer lengths are available)
A29. 20ft
File details come from the government source that posted it. Updated .