FA301624Q5226 Atch 3 Statement of Work.pdf

PDF 247 KB Posted

Attached to
Purchase and Installation of Hoists
Solicitation number
FA301624Q5226
Issued by

About this file

This document is a Statement of Work (SOW) for the purchase and installation of two 5-ton electrical hoists in Hangar 4 at Joint Base San Antonio - Randolph. The contractor shall inspect and certify the existing hoist railing system, remove any obstructions, install the new hoists, and provide initial training to maintenance personnel. The contractor will be responsible for providing all necessary tools, parts, materials, and equipment, as well as daily cleanup of the work site. The period of performance is 90 calendar days, including lead time for equipment procurement and shipping. A final inspection will be conducted, and any discrepancies must be corrected prior to final payment. The contracting agency is the Department of the Air Force, Air Education and Training Command.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement Of Work Purchase and Installation of Hoists for Hangar 4 (T-7)

JBSA Randolph (ESU) 1 Jul 24

PART 1 - GENERAL REQUIREMENTS:

1.1 PROJECT SCOPE: The contractor shall purchase and install two 5-ton electrical hoists in hangar 4 on Joint Base San Antonio - Randolph using existing hoist railing at a height of 45 feet on both the east and west end of the hangar. The existing rail system will be inspected and certified for hoist use.

1.2 REQUIREMENTS: The facility will be occupied while the work is being performed within the hangar. Contractor will work in coordinate with 12th Maintenance Group while work is being performed.

1.3 PROJECT DESCRIPTION:

1.3.1 Contractor shall inspect and certify the existing supporting rail system is still rated at

10,000 lbs.

1.3.2 The contractor will remove any obstructions to the rail system that would prevent its use when the hoists are installed.

1.3.3 Contractor shall provide rail system inspection results and related reports to the 12th

Maintenance Group upon contract completion.

1.3.4 Contract shall purchase two 5-ton rated electrical hoists and install them on hoist rail system if the rail system is rated to use them. One hoist will be installed on the east rail system and one hoist will be installed on the west rail system.

1.3.5 The hoist must be able to traverse the length of each corresponding rail system.

1.3.6 Each hoist must have a manual control box that is sufficient in length that the user can operate the hoist from a safe distance when moving aircraft engines.

1.3.7 Contractor shall install any required safety markings.

1.3.8 Contractor shall also provide initial hoist training to 12th Maintenance Group personnel.

1.4 GOVERNMENT FURNISHED SERVICES: The government will provide utilities (water and electricity) and emergency, including fire and security police response.

1.5 TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations and are subject to random vehicle speed control checks. Contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, is prohibited while driving on military installations in San Antonio, TX.

1.6 HAZARDOUS AND/OR TOXIC MATERIALS: A hazardous material (HAZMAT) is one that poses a risk to the health and safety of the public, and/or the environment if not properly controlled during the handling, storage, manufacture, processing, packaging, use, disposal, or transportation. Hazardous materials may be elements or compounds, and can be found as gases, solids, or liquids. HAZMAT poses a risk to the health and safety of the public, and/or the environment. Hazardous chemicals are defined under Sec. 1910.1200 (c) of Title 29 of the Code of Federal Regulation (CFR). All HAZMAT brought to the job site shall require the contractor to fill out an AF Form 3952 for each item for submission to the Hazardous Material Pharmacy, which must be submitted no later than 5 calendar days from the preceding month. Additionally, the contractor is required to submit Material Safety Data Sheets (MSDS) as directed by the clause entitled Hazardous Material Identification and Material Safety Data (FAR 52.223-3). The Contractor shall submit a monthly actual usage report of all hazardous/toxic materials brought onto the base during the preceding month to the HAZMAT Pharmacy (IAW AFI 32-7086, Hazardous Material Management) no later than the 5th calendar date of each month as well.

PART 2 - SPECIFIC REQUIREMENTS:

2.1 SITE CONDITIONS: The contractor shall furnish and maintain adequate barricades and warning signs at the job site. The contractor shall clean up debris on a daily basis.

2.2 CODES AND REGULATIONS: All work shall be accomplished in accordance with the Contract Specifications, applicable Uniform Building Codes, Air Force Base Regulations, and OSHA Requirements.

2.3 INSPECTION AND ACCEPTANCE: A final inspection of completed work will be conducted by the project manager, contractor and designated 502 CES personnel. Discrepancies identified during inspections shall be corrected prior to final payment.

2.4 HOURS OF WORK: Normal duty hours are from 7:00 A.M. to 5:00 P.M., Monday through Friday, except on government holidays.

2.5 PERIOD OF PERFORMANCE: The performance period is to be completed in 90 calendar days, this will include lead time for equipment purchase, manufacture, and shipping. Contractor will coordinate with the contract POC 48 hours before the actual work is to commence to minimize mission impact or deficiencies that may occur during the normal work week.

2.6 CLEAN-UP: At the end of each working day, the contractor shall clean up the work site by removing all debris. Clean up of the work site shall include the repair area(s), stage area(s), parking and eating area(s) and any other area(s), affected by the repair process. Any dirt or mud tracked on the any base street, parking area, sidewalk, patio, driveway, or building shall be cleaned daily.

2.7 CONTRACTOR FURNISHINGS: All required tools, parts, materials and supplies shall be supplied by the contractor and should be on hand before beginning work. The contractor will be required to furnish all supervision, labor, transportation materials, lifting materials, tools, incidentals, dumpsters, and any other applicable equipment. The contractor shall also provide barriers and signs to prevent unauthorized personnel from entering the work area while the contractor is removing and installing equipment or material.

2.8 CONTRACTOR WASTE AND DISPOSAL: All contractor-generated refuse and waste shall be stored in a waste container provided by the contractor and hauled from the project site to a disposal area to be selected by the contractor. This disposal area shall be located outside the physical boundaries of the project. Refuse disposal shall comply with the current disposal environmental requirements. The work site shall be kept neat, orderly and safe for workmen at all times. On-site dumpsters, if furnished by the contractor, shall be coordinated with CE Project Manager. All manifests shall be obtained prior to the transportation of refuse off-site.

END STATEMENT OF WORK