This document contains questions and answers related to a solicitation for replacing window blinds in Building 2012 at Lackland Air Force Base. The key details are:
The solicitation number is FA3016-24-Q-5067 for "Lackland Faux Wood Blinds". It is a 100% small business set-aside with a NAICS code of 337920. The work involves replacing all current window blinds with new horizontal faux wood blinds, as well as removing the older window blinds. A site visit is scheduled for June 21, 2024 at 1:00 PM CDT, and RFQ responses are due by July 5, 2024 at 1:00 PM CDT. Specific requirements include providing light gray colored blinds, potentially using multiple blinds for wider windows, and meeting SCIF compliance for visual and acoustic protection. The Government will assist with removing obstacles and blackboards prior to installation. A limited lifetime warranty is required on the blinds.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg. 2012, Window Blinds Replacement Q & A:
1. Are the blind sizes are the exact size to be order or is this the window opening size?
R: To my knowledge, the exact size, the windows do not open.
2. The SOW indicates a need to “meet SCIF compliancy requirement”. We assume SCIF [Sensitive Compartmented Information Facility] implies an area, room, buildings certified and accredited as meeting Director of National Intelligence security standards for the processing, storage, and/or discussion of sensitive compartmented information. By extension, does our understanding of meeting the SCIF compliance requirement simply mean that the blinds need to provide visual and some level of acoustic protection?
R: Visual protection.
3. In reference to the longer widths Is it acceptable to use two blinds side by side to achieve desired length?
R: Yes.
4. Please confirm if the blinds can be installed to the Window Mullion (Standard Practice).
R: Yes.
5. Can you Provide a detailed list of room names?
Conference Room (Rm 302) Orderly Room (Rm 305) – Big Room Senior Enlisted Advisor’s Office (Rm 304) Commander’s Office (Rm 306) Switch/Server Room (Rm 308) First Sergeant’s Office (Rm 310) Storage Room (Rm 307) Men’s Lav (Rm L5) Women’s Lav (Rm L6) Tech Advisor/Training Offices (Rms 316 a/b) TELCON/Alarm Room (Rm 309) – Kitchenette Area PAI (Rm 318) Lactation Room (Rm 311) Director of Operations (Rm 321) Analyst Rooms (Rm 313, 317, 320, 322, 324, 326)
SOW Will be amended to include detailed list of room names.
6. For windows measuring 124, 125,126" W - blinds are not available in this width, nor recommended as they will be too heavy for cordless lift. Will installing 3 blinds in each of these openings will be permitted?
R: Yes.
7. Will the Customer arrange removing blackboards that cover window openings prior to final measurement?
R: Yes. With advanced notice.
8. Will Customer arrange moving all obstacles in front of window openings for a safe work environment?
R: Yes. With advanced notice.
9. Can you Define the Warranty needed? ie: Limited Lifetime Manufacturer Warranty, 90 Day Installation Warranty R: Limited Lifetime warranty
10. Blind measurement verification: Does contractor have to personally verify Width and Length OR does Government Official verify Width and Length is ordered as written, per Description of Work? (see 2.2.1) R: I’d recommend avoiding possible margin of error potentially associated with hardware, contractor shall conduct a remeasure before start of work.
11. Can individual blind sets be “temporarily stored” within each Room area specified or any other approved area in Building 2012, until they blind is ready to install?
R: Temporary storage is acceptable if customer is given advanced notice
12. Is work totally off-limits for Saturdays/Sundays?
R: No, it is not off-limits. We would need lead time to arrange for personnel to be on-site.
13. Could photos be provided of window opening( s) to illustrate 1.) type of blind to be removed, and 2.) surface area where new blinds will be installed into (e.g., drywall, cement, wood, etc.)?
R: Pictures have been taken and will be posted on SAM.gov as Attachment 5 of the solicitation
14. What time frame is considered acceptably “reasonable” after award for existing blind removal/blind installation?
R: The time frame for completion for the project is currently 60 days after award date
15. Blind product specifications: Will blind be replaced with blinds that are similar (Vertical) in type or with "horizontal", as referenced in Description of Work (1.2)?
R: This are HORIZONTAL please.
16. Can Contractor/Vendor submit multiple quote submissions for FA3016-24-Q-5067?
R: Contracting will allow only one combined synopsis solicitation submission per contractor/
Vendor
17. The statement of work is asking for “Light Gray”. Is there a specific manufacturer and color you are requiring?
R: The specific color is LIGHT GRAY 120GY046