Atch 6 Questions and Answers.docx

DOCX document 27 KB Posted

Attached to
Honeywell Vindicator IDS and ACS -Bldg 896 (Brand Name Only)
Solicitation number
FA301623U0291
Issued by

About this file

This document contains questions and answers regarding a solicitation for a Honeywell Vindicator intrusion detection system and access control system for Building 896 at an Air Force base. The solicitation seeks installation of a single Vindicator IDS to protect the entire open storage area of the building, which includes four classrooms, a simulator bay, a hydraulic room with mezzanine, a two-story warehouse, a maintenance tech office, and a computer room. Drawings identifying room numbers are provided to define the perimeter and suggested sensor locations. No other alarms are required beyond the single IDS.

View the file

Other files

File Type Posted
RFQ - FA301623U0291-Honeywell IDS Amendment 001.docx DOCX document
Atch 5 B896 IDS and ACS Open Storage Drawings.pdf PDF
Atch 2 As-Built Drawings.docx DOCX document
RFQ - FA301623U0291-Honeywell IDS.docx DOCX document
Atch 4 Unescorted Access Request.pdf PDF
Atch 1 SOW.docx DOCX document
Atch 3 JandA Brand Name.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Atch 6 Questions and Answers

Questions 1-9

Question 1. Which rooms would require ACS?

Government Response: ACS is intended for the entire “Open Storage Area” with maglocks on all pedestrian Open Storage Area perimeter access doors, the key pads-badge/card readers on first floor Admin/ Maintenance Tech office: Room 166, Rm 161, and another at second floor Mezzanine entrance near Classrooms 263, 264, 265, and 266.

Question 2. Which rooms have IDS in them?

Government Response: There is no existing IDS; this project intent is to procure and install a single Vindicator IDS to protect the entire “open Storage Area” which covers (composed) the following Rooms within Bldg. 896

* 4 briefing/classrooms: Rooms 263, 264, 265, and 266

* 1 simulator high bay: Room 169

* 1 hydraulic room with overhead mezzanine: Room 170 & 270

* 1ea 2-story warehouse: Room 153 & 271

* 1 Maintenance Tech office: Room 166

* 1 Computer room: 168

* 1 MAF DMO Kit/Portal room: Room 161

Question 3: Are they separate alarms?

Government Response: There are no additional alarms (IDS).

Question 4: How many rooms need IDS?

Government Response: Refer to answer to question #2.

Question 5: Is there a collateral area alarm?

Government Response: There are no additional alarms (IDS).

Question 6: Is there a SCIF area alarm?

Government Response: No “SCIF” alarm.

Question 7: Are any rooms conjoined/ meaning does each room need its own alarm? It does not specify

Government Response: Only one IDS is required for the entire Open Storage Area; which once IDS installation is completed and certified it will become Secured Area instead of Open Storage.

Question 8: The drawings provided do not have room numbers, is there a drawing with room numbers? (Critical)

Government Response: Please, see attached As-built/drawings with Rm #s titled: “B896 IDS & ACS Open Storage Drawings”, Provide room #s and defines the perimeter (for each floor) of “Open Storage Area”, it also provide the suggested location for IDS sensors/devices.

Question 9: Does this bldg. have a basement?

Government Response: There is no basement.

File details come from the government source that posted it. Updated .