B491 Attic Clean-Up Questions and Answers.pdf
PDF 139 KB Posted
- Attached to
- B491 Attic Clean-Up
- Solicitation number
- FA301623U0104
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B491 Attic Clean-Up
RFQ# FA301623U0104
Q&A
• Can we utilize a skytrak?
o Due to the railings outside of the building, Skytrak may not be practical. However, if a suitable plan is in place we would not be against usage.
• What are the dimensions of B491?
o 374Lx76W
• What is the ceiling height?
o The ceiling height of the attic is generally 15 feet, however obstructions in certain areas lowers the height to 13 feet.
• Is it ground level, 1 floor?
o Please see attachment 4 on the RFQ solicitation
• 2 story 2 floors with adjoining steps?
• Is it 2nd floor only?
• Does it have easy access?
o There are both access points through interior and exterior means.
• Is the material to be removed stacked to the ceiling or packed tightly into the space of B491?
o Material is stored in spacious area. No material is stacked.
• Are there any hazardous materials contained in B491?
o No hazardous Material located within building.
File details come from the government source that posted it. Updated .