SF30 Amendment 0001 RFQ FA301623U0077 CO signed.pdf

PDF 134 KB Posted

Attached to
Proximity Reader Replacement Bldg 977 Federal contract opportunity
Solicitation number
FA3016-23-U-0077
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Atch 3 SOW - Updated 13 Jun 18.pdf
1.0 Background cover sheet or appendix
2.0 Scope
3.0 Description of Services
3.1 General Services
3.2 Design Services
3.3 Product Markings/Documentation/Tools
3.4 Delivery Services
3.5 Installation and Removal Services
3.6 Inspection/Acceptance Checklist
4.0 Product
4.1 Monolithic Panels and Components
4.2 Stackable Panels and Components
4.3 Modular Furniture
4.4 Demountable Walls
5.0 Government Furnished Property/Support
6.0 Site Conditions
7.0 Additional Services Information
8.0 Quality Assurance
9.0 Voluntary Protection Program (VPP)/Safety
10.0 Base/Installation Specifics
11.0 Reporting Requirements
12.0 Deliverables (CDRLs)
13.0 Services Summary
14.0 Attachment 1 – Inspection/Acceptance Checklist
Atch 3 SOW - Updated 13 Jun 18.pdf
1.0 Background cover sheet or appendix
2.0 Scope
3.0 Description of Services
3.1 General Services
3.2 Design Services
3.3 Product Markings/Documentation/Tools
3.4 Delivery Services
3.5 Installation and Removal Services
3.6 Inspection/Acceptance Checklist
4.0 Product
4.1 Monolithic Panels and Components
4.2 Stackable Panels and Components
4.3 Modular Furniture
4.4 Demountable Walls
5.0 Government Furnished Property/Support
6.0 Site Conditions
7.0 Additional Services Information
8.0 Quality Assurance
9.0 Voluntary Protection Program (VPP)/Safety
10.0 Base/Installation Specifics
11.0 Reporting Requirements
12.0 Deliverables (CDRLs)
13.0 Services Summary
14.0 Attachment 1 – Inspection/Acceptance Checklist
Atch 3 SOW - Updated 13 Jun 18.pdf
1.0 Background cover sheet or appendix
2.0 Scope
3.0 Description of Services
3.1 General Services
3.2 Design Services
3.3 Product Markings/Documentation/Tools
3.4 Delivery Services
3.5 Installation and Removal Services
3.6 Inspection/Acceptance Checklist
4.0 Product
4.1 Monolithic Panels and Components
4.2 Stackable Panels and Components
4.3 Modular Furniture
4.4 Demountable Walls
5.0 Government Furnished Property/Support
6.0 Site Conditions
7.0 Additional Services Information
8.0 Quality Assurance
9.0 Voluntary Protection Program (VPP)/Safety
10.0 Base/Installation Specifics
11.0 Reporting Requirements
12.0 Deliverables (CDRLs)
13.0 Services Summary
14.0 Attachment 1 – Inspection/Acceptance Checklist
ADP99CB.tmp
1.0 Background cover sheet or appendix
2.0 Scope
3.0 Description of Services
3.1 General Services
3.2 Design Services
3.3 Product Markings/Documentation/Tools
3.4 Delivery Services
3.5 Installation and Removal Services
3.6 Inspection/Acceptance Checklist
4.0 Product
4.1 Monolithic Panels and Components
4.2 Stackable Panels and Components
4.3 Modular Furniture
4.4 Demountable Walls
5.0 Government Furnished Property/Support
6.0 Site Conditions
7.0 Additional Services Information
8.0 Quality Assurance
9.0 Voluntary Protection Program (VPP)/Safety
10.0 Base/Installation Specifics
11.0 Reporting Requirements
12.0 Deliverables (CDRLs)
13.0 Services Summary
14.0 Attachment 1 – Inspection/Acceptance Checklist
Statement of Work Revised 18 June 19.pdf
1. Purpose
2. Scope
3. Requirement Description
4. Safety Requirements.
The contractor shall remain in compliance with all Federal, State, county, and JBSA-Randolph security and safety laws, regulations, policies, and requirements.
5. Site Coordination.
6. Confined Space.
7. Accident/Incident Reporting and Investigation.
8. Work Area(s).
9. Traffic control.
10. Security Requirements.
10.1 Security Clearances.
11. Environmental Management.
13. Quality Assurance.
14. Contractor Personnel.
14.1 Project Management.
14.2 Site Point of Contact (POC).
14.3 Personnel Requirements.
15. Warranty.
16. Manuals and Practices.
17. Network Services and Solutions
17.1 Network Infrastructure
Site Preparation and Installation Activities
17.2 Requirements Analysis and Conceptual Design
17.3 Installation Schedules.
17.4 Site Preparation
17.5 Pre-Installation Briefing
17.6 Government Support
17.7 Installation
17.8 Manuals and Practices.
17.10 Labeling.
17.11 Grounding.
17.12 Cable Terminations.
18. Inside Plant Requirements.
18.1 Measurements.
18.2 Tools and Testing Support
18.3 Test and Acceptance/Installation Test Plan.
18.4 Testing.
19. In-progress Testing.
19.1 Fiber Optic Tests.
19.2 Optical Attenuation.
19.3 Distance.
19.4 Acceptance/Installation Test Report.
19.5 Final Acceptance.
20. General Requirements
20.1 Tools and Test Equipment
Statement of Work Revised 18 June 19.pdf
1. Purpose
2. Scope
3. Requirement Description
4. Safety Requirements.
The contractor shall remain in compliance with all Federal, State, county, and JBSA-Randolph security and safety laws, regulations, policies, and requirements.
5. Site Coordination.
6. Confined Space.
7. Accident/Incident Reporting and Investigation.
8. Work Area(s).
9. Traffic control.
10. Security Requirements.
10.1 Security Clearances.
11. Environmental Management.
13. Quality Assurance.
14. Contractor Personnel.
14.1 Project Management.
14.2 Site Point of Contact (POC).
14.3 Personnel Requirements.
15. Warranty.
16. Manuals and Practices.
17. Network Services and Solutions
17.1 Network Infrastructure
Site Preparation and Installation Activities
17.2 Requirements Analysis and Conceptual Design
17.3 Installation Schedules.
17.4 Site Preparation
17.5 Pre-Installation Briefing
17.6 Government Support
17.7 Installation
17.8 Manuals and Practices.
17.10 Labeling.
17.11 Grounding.
17.12 Cable Terminations.
18. Inside Plant Requirements.
18.1 Measurements.
18.2 Tools and Testing Support
18.3 Test and Acceptance/Installation Test Plan.
18.4 Testing.
19. In-progress Testing.
19.1 Fiber Optic Tests.
19.2 Optical Attenuation.
19.3 Distance.
19.4 Acceptance/Installation Test Report.
19.5 Final Acceptance.
20. General Requirements
20.1 Tools and Test Equipment
topmostSubform[0]:
Page1[0]:
IDCode[0]:
Page[0]: 1
Pages[0]: 1
AmendNo[0]: 0001
EffDate[0]: 14 April 2023
ReqNo[0]:
ProjNo[0]:
IssCode[0]: FA3016
IssuedBy[0]: 502 CONS/JBKBA

395 B STREET WEST, SUITE 2, BLDG 224

JBSA RANDOLPH AFB TX 78150-4525

AdmCode[0]: FA3016
AdminBy[0]: SEE BLOCK 6
ContName[0]:
ContStrt[0]:
ContCnty[0]:
ContSt[0]:
ContZIP[0]:
Code[0]:
FacCode[0]:
SolChgYs[0]: Yes
SolChgNo[0]: Off
SolAmdNo[0]: SAM.gov RFQ#FA301623U0077
AmendDate[0]: 28 March 2023
ModNo[0]:
ModDate[0]:
NoCopies[0]: 1
Amended[0]: Yes
OffrExt[0]: Yes
OffrNoEx[0]: Off
ApprData[0]:
ChgeOrd[0]: Off
ChgeOrder[0]:
Modify[0]: Off
SuppAgre[0]: Off
SuppAuth[0]:
ModOthr[0]: Off
OthrSpec[0]:
NoReq[0]: Off
Require[0]: Off
Copies[0]:
Descript[0]: The purpose of this amendment is to:

- extend the quotation due date from 14 April 2023, 3:00PM CDT to 24 April 2023, 3:00PM CDT.

POC: Sharla Blalock, sharla.blalock@us.af.mil

SignName[0]:
SignTitl[0]:
ContDate[0]:
CoName[0]:
CoTitle[0]:
CODate[0]:
2023-04-14T06:53:45-0500
DELGADO.DAVID.ALVAREZ.JR.1130168236

File details come from the government source that posted it. Updated .