RFQ FA3016-22-Q-0007
Amendment 0001 Answers to Questions: 1-5
Question 1: Regarding section 1.1.1.1 of the SOW: Removal/Disposal. Can the contractor provide a dumpster on facility premises for disposal of the old equipment? If so, can the dumpster remain on-site until project completion and then removed by the contractor?
Answer 1: If the company wants to put a dumpster in during the removal and installation of the new lighting systems that should be allowed for the duration of the project.
Question 2: Can more than one room be shut down at a time for removal and installation of the new lights? If so, how many rooms can be made available at one time?
Answer 2: Yes, up to 2 rooms can be shutdown at a time. This will allow us to continue operations during the installation of the new lighting systems.
Question 3: Section 1.1.1.3.1 of the SOW. states that the contractor is not responsible for finish work. However, current lighting designs use single anchors with articulating arms - not a track system that is currently being used. The removal of the track systems will leave significant spaces in the ceilings. Should the contractor include the repair of these spaces in the proposal?
Answer 3: Yes, this is a turn-key project the contractor is responsible for returning the rooms to their original state including any repairs required to the ceiling or other surfaces. The contractor is responsible for finish work. Ref.
para 1.1.1.3.2.
Question 4: Is infection control mitigation and procedure required in the scope of work? I ask because it is typically not required for animal research operating rooms.
Answer 4: The contractor shall be responsible for infection control mitigation to an extent, shall provide an semi abatement to keep dust down. Ref. para 1.1.1.1 of the SOW
Question 5: We did receive the attachments, however, we just want to make sure that we are quoting correctly. The quote calls for 3 OR Lights (major) and 2 smaller OR Lights (minor) and want to make sure that is correct. If that is correct, we are ready to submit!
Answer 5: Yes. Ref. para 1.1.1.2, para 1.1.1.2.1.1, and para 1.1.1.2.1.2