Termite Treatment - Questions Answers.docx
DOCX document 13 KB Posted
- Attached to
- Termite Application Services Federal contract opportunity
- Solicitation number
- FA301620U0021
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch3- Base Pass Form.pdf | ||
| Atch1- SOW FSH Bldg 16 Quadrangle 27 Jan 2020.pdf | ||
| Atch2- WD 2015-5253_Rev-10_23Dec2019.pdf | ||
| Solicitation - FA301620U0021.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Termite Treatment FSH Quadrangle Site Visit Questions – 2/25/2020
1. What is the square footage of the basement areas? 60’X80’
1. What is the height of the basement areas? 9’
1. What is the square footage of the crawl spaces and the height of those as well? 30’X 40’
1. Concerning attic spaces, do all three sides of the fort have attic spaces? No attic spaces on all three sides, only on the south wing.
1. If we discover live animals in crawl spaces, how would you like to proceed? We will contact the 802d CES entomology shop to remove any possible animals.
1. Is there insulation in crawl space? What kind of insulation? We currently do not have any information regarding insulation, if needed we could look into getting the crawlspace inspected prior to treatment beginning in this area.
1. If there is asbestos located in areas that need to be treated and inspected, how would you like us to proceed? In the event asbestos is detected, all termite treatment will stop immediately until we coordinate the abatement of any existing asbestos.
1. Can we work inside building after hours (referring to interior infestation only)? No, bldg. personnel will only be present during working hours.
1. Can work be done during weekends? No, bldg. personnel will not be present during the weekends.