Attachment 2 - Schedule of Material Submittals 08Dec2019.pdf

PDF 108 KB Posted

Attached to
Repair Nursery Rd. - FSH Federal contract opportunity
Solicitation number
FA301620B0005
Issued by
Department of the Air Force Air Education and Training Command

About this file

This submittal register outlines materials required to be submitted by a contractor for the Repair Nursery Road Section-02 project. Key required submittals include a traffic control plan, project schedule, safety plans, environmental protection plan, quality control plan, concrete mix designs and testing results, asphalt mix designs and testing, pavement marking materials and certifications, drainage materials certifications, and landscaping materials. The contractor must submit these materials to the approving authority for review and approval by the dates specified. The submittal register provides a standardized way for the contractor, government, and engineers to track materials required for the project and ensure all necessary information is submitted as the work progresses.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Nursery Rd. - FSH, newest first.
File Type Posted
Attachment 14 - SD-91 of 96 Storm Drain Map.pdf PDF
Attachment 1 - AMENDED SOW for Pre Bid Questions.pdf PDF
Attachment 11 -S-88 of 96 San Swr Map.pdf PDF
Attachment 17 - V-409.pdf PDF
Solicitation Amendment - FA301620B00050001.pdf PDF
Attachment 8 - Communication Lines Map.pptx PPTX presentation
Attachment 12 - S-91 of 96 San Swr Map.pdf PDF
Attachment 13 - SD-88 of 96 Storm Drain Map.pdf PDF
Attachment 9 - E-88 of 96 Electrical and Street Light Map.pdf PDF
Attachment 18 - W-88 of 96 Water Line Map.pdf PDF
Attachment 10 - E-91 of 96 Electrical and Street Light Map.pdf PDF
Attachment 15 - V-407.pdf PDF
Attachment 19 - W-91 of 96 Water Line Map.pdf PDF
Attachment 16 - V-408.pdf PDF
Solicitation Amendment FA301620B00050001 SF 30 - Released.pdf PDF
Pre Bid SIte Visit Questions-Answers edited by SrA Trevino.pdf PDF
S-91 of 96 San Swr Map.pdf PDF
W-91 of 96 Water Line Map.pdf PDF
V-409.pdf PDF
V-407.pdf PDF
SD-88 of 96 Storm Drain Map.pdf PDF
S-88 of 96 San Swr Map.pdf PDF
E-91 of 96 Electrical and Street Light Map.pdf PDF
W-88 of 96 Water Line Map .pdf PDF
Communication Lines Map.pptx PPTX presentation
E-88 of 96 Electrical and Street Light Map.pdf PDF
Attachment 1 - SOW 30Sep219 amended for Pre Bid Questions.pdf PDF
SD-91 of 96 Storm Drain Map.pdf PDF
V-408.pdf PDF
Solicitation - FA301620B0005.pdf PDF
Attachment 6 - Physical Data 2018 - 2019.pdf PDF
Solicitation - FA301620B0005.pdf PDF
Attachment 1 - SOW 30Sep2019.pdf PDF
Attachment 7 - Unescorted Access Request 29Jan2020.pdf PDF
Attachment 3 - DD1354 08Dec2019.pdf PDF
Attachment 5 - Estimated Cost Breakdown 07Jun2018.xls XLS spreadsheet
Attachment 4 - Wage Determination 29Jan2020.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES

01 11 00 SD-01 Preconstruction Submittals

1.2.1.1.2 GTraffic Control Plan

01 14 00 SD-01 Preconstruction Submittals

1.4.1.1 Glist of Contract Personnel

1.4.1.2Installation Access

01 30 00 SD-01 Preconstruction Submittals 1.2View Location Map

1.3 GProgress and Completion

Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals

Project Schedule CPM

GA

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 35 29 SD-01 Preconstruction Submittals 1.5Accident Prevention Plan (APP)

GA

Asbestos Hazard Abatement Plan (for description see spec section

13280); GA

Lead Hazard Control Plan (for description see spec section

13281); GA.

1.6 GActivity Hazard Analysis (AHA)

Crane Critical Lift Plan Crane Operators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair Nursery Road Section-02

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) charles.baish Cross-Out

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES

01 35 29 SD-06 Test Reports GAccident Reports

Crane Reports

GA

Monthly Exposure Reports Regulatory Citations and Violations

SD-07 Certificates Confined Space Entry Permit Hot work permit

01 35 30 SD-08 Manufacturer’s Instructions GSite Safety and Health Plan

SD-09 Manufacturer’s Field Reports

GSafety and Health Phase-Out Report

01 35 35 SD-01 Preconstruction Submittals

1.6ENVIRONMENTAL

PROTECTION PLAN

G Fish and Wildlife Protection Measures as applcable; G Environmental Permits as applicable; G

SD-02 Shop Drawings Asbestos Work Plans Asbestos Certifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair Nursery Road Section-02

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 9 PAGES

01 35 35 Asbestos Transporter License Asbestos Medical clearances (may be reviewed on site)

Asbestos Training Certificates Asbestos TDSHS License as applicable

Any Asbestos Inspection reports that have not been provided by the area specific Environmental Office.

Any Asbestos Inspection Reports that were not included in the original assessment or a results to a change in the scope of work.

G Unsigned copy of State Renovation, Demolition Notifications 15 days prior; G

Lead Work Plans Lead Occupant Protection Plan.

Texas Department of State Health Services Lead Licenses

Lead Notifications Lead Training Certificates Lead Based Paint Reports Lead Inspection reports

SD-03 Product Data Asbestos Air Monitoring reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair Nursery Road Section-02

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 9 PAGES

01 35 35 Lead Air Monitoring reports SD-04 Samples Lead OSHA Negative Exposure Assessment or

Lead Work Plan.

EPA Lead Training Lead Awareness Training certificates

OSHA Air Monitoring Lead Training Certificates Waste Disposal Plan, May be included in work plan

Lead Inspection reports Lead Based Paint Reports

01 45 00.00 20 SD-01 Preconstruction Submittals Contractor Quality Control (CQC) Plan

01 50 00 SD-01 Preconstruction Submittals 1.2Construction Site Plan

Traffic Control Plan SD-06 Test Reports Backflow Preventer Tests

SD-07 Certificates Backflow Tester

1.3Backflow Preventers 01 78 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair Nursery Road Section-02

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES

01 78 00 GAs-Built Drawings SD-02 Shop Drawings As-Built Record of Materials

FIO

SD-03 Product Data

1.4.1 GWarranty Management Plan

SD-04 Samples GWarranty Tags

02 41 00 SD-01 Preconstruction Submittals 1.8Existing Conditions

SD-11 Closeout Submittals Receipts

03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.7 GQuality Control Personnel

Certifications

1.6.9 GLaboratory Accreditation

Form Removal Schedule 1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data 2.4.7Joint Sealants 2.4.6Joint Filler 2.1Materials for Forms 2.4.1Cementitious Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair Nursery Road Section-02

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES

03 30 00 2.3.2Concrete Curing Materials 2.5Reinforcement

2.4.4 SAdmixtures

SD-06 Test Reports

1.6.1.2 GConcrete Mix Design

3.14.2.3 GCompressive Strength Tests

3.14.2.5Unit Weight of Structural

Concrete 3.14.2.4Air Content 3.14.2.1Slump Tests 2.4.2Water

SD-07 Certificates 2.5.1Reinforcing Bars 1.6.3.6Safety Data Sheets 2.3.2Curing Compound

31 00 00 SD-03 Product Data 3.2Shoulder Construction

SD-06 Test Reports Testing

SD-07 Certificates Testing

32 11 23 SD-03 Product Data

1.5 GPlant, Equipment, and Tools

1.1.3Waybills and Delivery Tickets

SD-06 Test Reports

2.3.1 GInitial Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair Nursery Road Section-02

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES

32 11 23 3.13.1 GIn-Place Tests 32 12 13 SD-03 Product Data

1.1.3Waybills and Delivery Tickets 2.2.4Local/Regional Materials

SD-06 Test Reports 3.7Sampling and Testing

32 12 16 SD-03 Product Data

2.4 GMix Design

3.10 GQuality Control

3.11 GMaterial Acceptance

1.1.3 GPercent Payment

SD-04 Samples 2.3Asphalt Cement Binder 2.2Aggregates

SD-06 Test Reports

2.2 GAggregates

3.10.3.10QC Monitoring

SD-07 Certificates

2.3 GAsphalt Cement Binder

3.6Testing Laboratory

32 17 23 SD-03 Product Data

2.1.1.2 GSurface Preparation Equipment

List

2.1.2 GApplication Equipment List

3.2Exterior Surface Preparation

1.4.1 GSafety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair Nursery Road Section-02

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES

32 17 23 2.2.5.1 GReflective media for roads

2.2.1 GSolventborne Paint

2.2.4 GRaised Pavement Markers

Primers and Adhesives SD-06 Test Reports

2.2.5.1 GReflective Media for Roads

2.2.1 GSolventborne Paint

(HBAC)

2.2.4 GRaised Pavement Markers

Primers and Adhesives 3.4.1Test Reports

SD-07 Certificates

1.4.2 GQualifications

2.2.5.1Reflective Media for Roads 2.2.1Solventborne Paint

1.4.1 GVolatile Organic Compound

SD-08 Manufacturer’s Instructions

2.2.1 GSolventborne Paint

32 92 23 SD-03 Product Data 2.5Fertilizer

SD-06 Test Reports 2.3.3Topsoil composition tests

SD-07 Certificates 2.1sods

33 40 00 SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair Nursery Road Section-02

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES

33 40 00 2.1Pipe for Culverts and Storm Drains

SD-07 Certificates 2.1.1Resin Certification 2.3.6.1Oil Resistant Gasket 3.9.1.2Leakage Test 3.9.1.1Hydrostatic Test on Watertight

Joints 3.9.1.3Determination of Density 2.3.5Frame and Cover for Gratings 3.9.2.1.3Post-Installation Inspection

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair Nursery Road Section-02

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)