Attachment_2_-Schedule_of_Material_Submittals.pdf
PDF 947 KB Posted
- Attached to
- RPR CORPORAL JOHNSON RD - FSH Federal contract opportunity
- Solicitation number
- FA301619BA003
About this file
Attachment 2 - Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_Final-Revised.pdf | ||
| Questions_and_Answers_-_Map.pdf | ||
| Attachment_1_-SOW_-_RPR_Corporal_Johnston_Road_-_FSH_-_Revised_28_Feb_2019.pdf | ||
| Questions_and_Answers_Final.pdf | ||
| Amendment_FA301619BA0030001.pdf | ||
| Attachment_1_-SOW_-_RPR_Corporal_Johnston_Road_-_FSH.pdf | ||
| Attachment_5_-_Estimated_Cost_Breakdown.xls | XLS spreadsheet | |
| Attachment_7_-_Physical_Data_-_52-236-4_b.pdf | ||
| Attachment_3_-DD_1354.pdf | ||
| Attachment_4_-_Wage_Determination_TX190007.pdf | ||
| Solicitation_-_FA301619BA003.pdf | ||
| Attachment_6_-_Unescorted_Access_Request.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
Repair Corporal Johnson Road
CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G # R A P H
G O V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 11 00 SD-01 Preconstruction Submittals Traffic Control Plan 1.2.1.1.2 G
01 14 00 SD-01 Preconstruction Submittals list of Contract Personnel 1.4.1.1 G Installation Access 1.4.1.2
01 30 00 SD-01 Preconstruction Submittals View Location Map 1.2 G Progress and Completion 1.3 G Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals Project Schedule CPM 1.2 GA
01 33 00 SD-01 Preconstruction Submittals Submittal Register 1.7 G
01 35 29 SD-01 Preconstruction Submittals Accident Prevention Plan (APP) 1.5 GA
Activity Hazard Analysis (AHA) 1.6 G 01 35 29 SD-06 Test Reports
Accident Reports G Monthly Exposure Reports GA Regulatory Citations and GA Violations
SD-07 Certificates Confined Space Entry Permit Hot work permit
FA301619BA003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES
TITLE AND LOCATION
Repair Corporal Johnson Road
CONTRACTOR
A C T I V I T Y
N O
R A N S M I T T
L
S P E
DESCRIPTION
ITEM SUBMITTED
R A G # R A
H
G
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
ACTION
APPROVING AUTHORITY
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH
REMARKS
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
T I
D
DATE
OF
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
TO OTHER
REVIEWER
DATE RCD
FROM OTH
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 35 30 SD-08 Manufacturer’s Instructions
Site Safety and Health Plan 1.2 G
SD-09 Manufacturer’s Field
Reports
Safety and Health Phase-Out 1.2 G
Report
01 35 35 SD-01 Preconstruction Submittals
ENVIRONMENTAL 1.6
PROTECTION PLAN G
Fish and Wildlife Protection
Measures as applicable; G
Environmental Permits as applicable; G
01 45 00.00 20 SD-01 Preconstruction Submittals
Contractor Quality Control (CQC) G
Plan
01 50 00 SD-01 Preconstruction Submittals
Construction Site Plan 1.2 G
Traffic Control Plan G
SD-06 Test Reports
Backflow Preventer Tests
SD-07 Certificates
Backflow Tester
Backflow Preventers Certification 1.3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 78 00 Warranty Management Plan 1.4.1 G
02 41 00 SD-01 Preconstruction Submittals
Existing Conditions 1.8
SD-11 Closeout Submittals
Receipts
03 30 00 SD-01 Preconstruction Submittals
Concrete Curing Plan 1.6.3.1
Quality Control Plan 1.6.6 G
Quality Control Personnel 1.6.7 G
Certifications
Laboratory Accreditation 1.6.9 G
Form Removal Schedule G
Formwork 1.6.2.1
Reinforcing Steel 1.6.2.2 G
SD-03 Product Data
Joint Sealants 2.4.7
Joint Filler 2.4.6
Materials for Forms 2.1
Cementitious Materials 2.4.1
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
03 30 00 Concrete Curing Materials 2.3.2
Reinforcement 2.5
Admixtures 2.4.4 S
SD-06 Test Reports
Concrete Mix Design 1.6.1.2 G
Compressive Strength Tests 3.14.2.3 G
Unit Weight of Structural 3.14.2.5
Concrete
Air Content 3.14.2.4
Slump Tests 3.14.2.1
Water 2.4.2
SD-07 Certificates
Reinforcing Bars 2.5.1
Safety Data Sheets 1.6.3.6
Curing Compound 2.3.2
31 00 00 SD-03 Product Data
SD-10 Precon Submittals 3.2
SD-06 Test Reports
Testing
SD-07 Certificates
Testing
32 11 23 SD-03 Product Data 1.4
Plant, Equipment, and Tools 1.4 G
Waybills and Delivery Tickets 1.4 G
SD-06 Test Reports
Initial Tests 1.5 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
32 11 23 In-Place Tests 1.4 G
32 12 13 SD-03 Product Data
Waybills and Delivery Tickets 1.3 G
Local/Regional Materials 1.3
SD-06 Test Reports
Sampling and Testing 3.7
32 12 16 SD-03 Product Data
Mix Design 2.4 G
Quality Control 3.10 G
Material Acceptance 3.11 G
Percent Payment 1.1.3 G
SD-04 Samples
Asphalt Cement Binder 2.3
Aggregates 2.2
SD-06 Test Reports
Aggregates 2.2 G
QC Monitoring 3.10.3.10
SD-07 Certificates
Asphalt Cement Binder 2.3 G
Testing Laboratory 3.6
32 17 23 SD-03 Product Data
Surface Preparation Equipment 2.1.1.2 G
List
Application Equipment List 2.1.2 G
Exterior Surface Preparation 3.2
Safety Data Sheets 1.4.1 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
32 17 23 Reflective media for roads 2.2.5.1 G
Solventborne Paint 2.2.1 G
Raised Pavement Markers 2.2.4 G
Primers and Adhesives G
SD-06 Test Reports
Reflective Media for Roads 2.2.5.1 G
Solventborne Paint 2.2.1 G
Raised Pavement Markers 2.2.4 G
Primers and Adhesives
Test Reports 3.4.1
SD-07 Certificates
Qualifications 1.4.2 G
Reflective Media for Roads 2.2.5.1
Solventborne Paint 2.2.1
Volatile Organic Compound 1.4.1 G
SD-08 Manufacturer’s Instructions
Solventborne Paint 2.2.1 G
32 92 23 SD-03 Product Data
Fertilizer 2.5
SD-06 Test Reports
Topsoil composition tests 2.3.3
SD-07 Certificates sods 2.1
33 40 00 SD-04 Samples
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTR/
DATE RCD
T I
AUTH/
DATE RCD
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
33 40 00 Pipe for Culverts and Storm 2.1
Drains
SD-07 Certificates
Resin Certification 2.1.1
Oil Resistant Gasket 2.3.6.1
Leakage Test 3.9.1.2
Hydrostatic Test on Watertight 3.9.1.1
Joints
Determination of Density 3.9.1.3
Frame and Cover for Gratings 2.3.3
Post-Installation Inspection 3.9.2.1.3
Report
| PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS |
| DIVISION 03 - CONCRETE |
| DIVISION 31 - EARTHWORK |
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| 11/15 |
| 08/15 |
| 11/15 |
| 02/15 |
| 05/11 |
| 12/02 |
| 12/15 |
| 05/18 |
| 11/14 |
| 12/15 |
| 08/09 |
| 12/15 |
| 12/15 |
| 12/15 |
| 12/15 |
| 12/15 |
| 08/11 |
| 12/15 |
| 05/14 |
| 08/08 |
| 02/17 |
| 05/17 |
| 08/09 |
| 08/16 |
| 04/06 |
| 02/10 |
| 03B - SOW Attachment 1 - East CPL Johnson Work Plan Womack to Williams.pdf |
| Slide Number 1 |
| 03C - SOW Attachment 2 - West CPL Johnson Work Plan Garden to Chaffee.pdf |
| Slide Number 1 |
| 03D - SOW Attachment 3 - East CPL Johnson Parking Strip Repair.pdf |
| Slide Number 1 |
File details come from the government source that posted it.