Atch_6_-_Cost_Estimate_Breakdown.xls

XLS spreadsheet 52 KB Posted

Attached to
Repair 575 Depot Condensers @ Bldg 75
Solicitation number
FA301618R0049
Issued by

About this file

Atch 6 Cost Estimate Breakdown

View the file

Other files

File Type Posted
FA301618R0049_-_Answers_to_RFI_Questions.docx DOCX document
FA301618R0049_0002.pdf PDF
Atch_2_-_Wage_Determination_(v2).docx DOCX document
FA301618R0049_0001.pdf PDF
Request_for_Proposal_(RFP).docx DOCX document
Atch_3_-_Unescorted_Base_Access_Request.pdf PDF
Atch_1_-_Statement_of_Work_and_Appendices.docx DOCX document
Atch_7_-_AF_Form_66_(Schedule_of_Material_Submittals).xlsx XLSX spreadsheet
Atch_8_Local_Information.pdf PDF
Atch_4__Financial_Information_Questionnaire.docx DOCX document
Atch_2_-_Wage_Determination.docx DOCX document
Atch_5_Contractor_Responsibility_Questionnaire.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Details

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
General Construction Subtotal$0.00
General Construction Labor Burden
100.00%RSMeans San Antonio, TX CCI
General Construction Subcontractor Overhead
General Construction Subcontractor Profit
General Construction Prime Contractor Overhead
General Construction Prime Contractor Profit
General Construction Prime Contractor Bonding
General Construction Contingency0.00%$0.00
CONTRACT FOR (Work to be performed)This cost proposal is valid for ______________________________daysProposed Project Amount$0.00
Replace HVAC Condensor Units Bldg. 75The period of performance to perform this work is ___________ days.
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
TYMX026309JBSA-Randolph, TX
LINE
NO.ITEM DESCRIPTIONUNIT OF
MEASUREMATERIAL COSTSLABOR COSTSEQUIPMENT COSTSOTHER COSTSLINE

TOTAL

2$0.00$0.00$0.00$0.00
201-31-13-20-0200 Field personnel, project manager, averageWeek$0.00$0.00
301-31-13-20-0260 Field personnel, superintendent, averageWeek$0.00$0.00
401-54-33-40-6410-4 Rent per month for general equipment rental, without operators, toilet, portable chemicalEa.$0.00$0.00
501-93-13-15-0870 Mechanical facilities maintenance, ductwork, clean, rectangular, 16"L.F.$0.00$0.00
602-41-19-19-0725 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Dumpster, weekly rental, includes one dump per week, 20 C.Y. capacity, 5 tonsWeek$0.00$0.00
702-41-19-19-0910 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, delivery, average for all sizesEa.$0.00$0.00
802-41-19-19-0920 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, haul, average for all sizesEa.$0.00$0.00
902-41-19-19-0940 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, rent per month, average for all sizesEa.$0.00$0.00
1022-05-05-10-2162 Plumbing demolition, plastic pipe with fittings, 2" thru 3" diameterL.F.$0.00$0.00
1122-05-29-10-2300 Hangers and supports for plumb'g/HVAC pipe/equip., bands, split ring, malleable iron, for non-insulated pipe, type 11, 1-1/2" pipe sizeEa.$0.00$0.00
1223-05-05-10-0100 HVAC demolition, air conditioner, split unit, 3 tonEa.$0.00$0.00
1323-05-05-10-0100-4140 Labor adjustment factors, add to labor for working in existing occupied buildings, office building (Modified using 22-01-02-20-4140)Ea.$0.00$0.00
1423-05-05-10-0436 HVAC demolition, computer room unit, air cooled split, 12 thru 23 tonEa.$0.00$0.00
1523-05-05-10-0460 HVAC demolition, computer room unit, water cooled, excluding condenser, up thru 10 tonEa.$0.00$0.00
1623-05-05-10-1570 HVAC demolition, ductwork, metal, steel, stainless steel, fabricatedLb.$0.00$0.00
1723-05-93-20-0050 Balancing, water, subcontractor's quote including material and labor, air cooled condenserEa.$0.00$0.00
1823-09-43-10-0220-0020 Electronic control systems, for electronic costs to Section 23 09 43.10, add (Modified using 23-09-33-10-0020)Ea.$0.00$0.00
1923-09-43-10-0220-4140 Labor adjustment factors, add to labor for working in existing occupied buildings, office building (Modified using 22-01-02-20-4140)Ea.$0.00$0.00
2023-09-43-10-0520 Pneumatic control systems, including a nominal 50 feet of tubing, add control panelboard if required, heating and ventilating, split system, cooling coil, chilled water, room, thermosEa.$0.00$0.00
2123-09-43-10-0520-4140 Labor adjustment factors, add to labor for working in existing occupied buildings, office building (Modified using 22-01-02-20-4140)Ea.$0.00$0.00
2226-05-05-10-0100 Electrical demolition, conduit to 15' high, including fittings and hangers, rigid galvanized steel, 1/2" to 1" diameterL.F.$0.00$0.00
2326-05-05-10-0370-9910 Electrical demolition, add to labor for higher elevated installation, 15' to 20' high, add (Modified using 26-05-05-10-9910)L.F.$0.00$0.00
2426-05-05-10-0380-9910 Electrical demolition, add to labor for higher elevated installation, 15' to 20' high, add (Modified using 26-05-05-10-9910)L.F.$0.00$0.00
2526-05-05-10-0390-9910 Electrical demolition, add to labor for higher elevated installation, 15' to 20' high, add (Modified using 26-05-05-10-9910)L.F.$0.00$0.00
2626-05-05-10-0520-9910 Electrical demolition, add to labor for higher elevated installation, 15' to 20' high, add (Modified using 26-05-05-10-9910)L.F.$0.00$0.00
2726-05-05-10-0620 Electrical demolition, copper bus duct, indoor, 3 phase, including hangers and supports, 225 ampL.F.$0.00$0.00