Atch_6_-_Cost_Estimate_Breakdown.xls
XLS spreadsheet 52 KB Posted
- Attached to
- Repair 575 Depot Condensers @ Bldg 75
- Solicitation number
- FA301618R0049
About this file
Atch 6 Cost Estimate Breakdown
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA301618R0049_-_Answers_to_RFI_Questions.docx | DOCX document | |
| FA301618R0049_0002.pdf | ||
| Atch_2_-_Wage_Determination_(v2).docx | DOCX document | |
| FA301618R0049_0001.pdf | ||
| Request_for_Proposal_(RFP).docx | DOCX document | |
| Atch_3_-_Unescorted_Base_Access_Request.pdf | ||
| Atch_1_-_Statement_of_Work_and_Appendices.docx | DOCX document | |
| Atch_7_-_AF_Form_66_(Schedule_of_Material_Submittals).xlsx | XLSX spreadsheet | |
| Atch_8_Local_Information.pdf | ||
| Atch_4__Financial_Information_Questionnaire.docx | DOCX document | |
| Atch_2_-_Wage_Determination.docx | DOCX document | |
| Atch_5_Contractor_Responsibility_Questionnaire.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Details
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||
| CONTRACTOR | ADDRESS | ||||||||||
| General Construction Subtotal | $0.00 | ||||||||||
| General Construction Labor Burden | |||||||||||
| 100.00% | RSMeans San Antonio, TX CCI | ||||||||||
| General Construction Subcontractor Overhead | |||||||||||
| General Construction Subcontractor Profit | |||||||||||
| General Construction Prime Contractor Overhead | |||||||||||
| General Construction Prime Contractor Profit | |||||||||||
| General Construction Prime Contractor Bonding | |||||||||||
| General Construction Contingency | 0.00% | $0.00 | |||||||||
| CONTRACT FOR (Work to be performed) | This cost proposal is valid for ______________________________days | Proposed Project Amount | $0.00 | ||||||||
| Replace HVAC Condensor Units Bldg. 75 | The period of performance to perform this work is ___________ days. | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| TYMX026309 | JBSA-Randolph, TX | ||||||||||
| LINE | |||||||||||
| NO. | ITEM DESCRIPTION | UNIT OF | |||||||||
| MEASURE | MATERIAL COSTS | LABOR COSTS | EQUIPMENT COSTS | OTHER COSTS | LINE |
TOTAL
| 2 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 2 | 01-31-13-20-0200 Field personnel, project manager, average | Week | $0.00 | $0.00 | ||||
| 3 | 01-31-13-20-0260 Field personnel, superintendent, average | Week | $0.00 | $0.00 | ||||
| 4 | 01-54-33-40-6410-4 Rent per month for general equipment rental, without operators, toilet, portable chemical | Ea. | $0.00 | $0.00 | ||||
| 5 | 01-93-13-15-0870 Mechanical facilities maintenance, ductwork, clean, rectangular, 16" | L.F. | $0.00 | $0.00 | ||||
| 6 | 02-41-19-19-0725 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Dumpster, weekly rental, includes one dump per week, 20 C.Y. capacity, 5 tons | Week | $0.00 | $0.00 | ||||
| 7 | 02-41-19-19-0910 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, delivery, average for all sizes | Ea. | $0.00 | $0.00 | ||||
| 8 | 02-41-19-19-0920 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, haul, average for all sizes | Ea. | $0.00 | $0.00 | ||||
| 9 | 02-41-19-19-0940 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, rent per month, average for all sizes | Ea. | $0.00 | $0.00 | ||||
| 10 | 22-05-05-10-2162 Plumbing demolition, plastic pipe with fittings, 2" thru 3" diameter | L.F. | $0.00 | $0.00 | ||||
| 11 | 22-05-29-10-2300 Hangers and supports for plumb'g/HVAC pipe/equip., bands, split ring, malleable iron, for non-insulated pipe, type 11, 1-1/2" pipe size | Ea. | $0.00 | $0.00 | ||||
| 12 | 23-05-05-10-0100 HVAC demolition, air conditioner, split unit, 3 ton | Ea. | $0.00 | $0.00 | ||||
| 13 | 23-05-05-10-0100-4140 Labor adjustment factors, add to labor for working in existing occupied buildings, office building (Modified using 22-01-02-20-4140) | Ea. | $0.00 | $0.00 | ||||
| 14 | 23-05-05-10-0436 HVAC demolition, computer room unit, air cooled split, 12 thru 23 ton | Ea. | $0.00 | $0.00 | ||||
| 15 | 23-05-05-10-0460 HVAC demolition, computer room unit, water cooled, excluding condenser, up thru 10 ton | Ea. | $0.00 | $0.00 | ||||
| 16 | 23-05-05-10-1570 HVAC demolition, ductwork, metal, steel, stainless steel, fabricated | Lb. | $0.00 | $0.00 | ||||
| 17 | 23-05-93-20-0050 Balancing, water, subcontractor's quote including material and labor, air cooled condenser | Ea. | $0.00 | $0.00 | ||||
| 18 | 23-09-43-10-0220-0020 Electronic control systems, for electronic costs to Section 23 09 43.10, add (Modified using 23-09-33-10-0020) | Ea. | $0.00 | $0.00 | ||||
| 19 | 23-09-43-10-0220-4140 Labor adjustment factors, add to labor for working in existing occupied buildings, office building (Modified using 22-01-02-20-4140) | Ea. | $0.00 | $0.00 | ||||
| 20 | 23-09-43-10-0520 Pneumatic control systems, including a nominal 50 feet of tubing, add control panelboard if required, heating and ventilating, split system, cooling coil, chilled water, room, thermos | Ea. | $0.00 | $0.00 | ||||
| 21 | 23-09-43-10-0520-4140 Labor adjustment factors, add to labor for working in existing occupied buildings, office building (Modified using 22-01-02-20-4140) | Ea. | $0.00 | $0.00 | ||||
| 22 | 26-05-05-10-0100 Electrical demolition, conduit to 15' high, including fittings and hangers, rigid galvanized steel, 1/2" to 1" diameter | L.F. | $0.00 | $0.00 | ||||
| 23 | 26-05-05-10-0370-9910 Electrical demolition, add to labor for higher elevated installation, 15' to 20' high, add (Modified using 26-05-05-10-9910) | L.F. | $0.00 | $0.00 | ||||
| 24 | 26-05-05-10-0380-9910 Electrical demolition, add to labor for higher elevated installation, 15' to 20' high, add (Modified using 26-05-05-10-9910) | L.F. | $0.00 | $0.00 | ||||
| 25 | 26-05-05-10-0390-9910 Electrical demolition, add to labor for higher elevated installation, 15' to 20' high, add (Modified using 26-05-05-10-9910) | L.F. | $0.00 | $0.00 | ||||
| 26 | 26-05-05-10-0520-9910 Electrical demolition, add to labor for higher elevated installation, 15' to 20' high, add (Modified using 26-05-05-10-9910) | L.F. | $0.00 | $0.00 | ||||
| 27 | 26-05-05-10-0620 Electrical demolition, copper bus duct, indoor, 3 phase, including hangers and supports, 225 amp | L.F. | $0.00 | $0.00 |