Questions_and_Answers_posted_FBO__(142-150).docx

DOCX document 19 KB Posted

Attached to
JBSA Randolph Grounds
Solicitation number
FA3016-16-R-0048
Issued by

About this file

The initial submission of questions (142-150) was incorrect. Please see the attached for the correct attachment for answers to questions 142-150.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

502 CONS JBKA FA3047-16-R-0048

JBSA Lackland JBSA Randolph Grounds Maintenance

QUESTIONS & ANSWERS (#142-150)

Question 142: Reference: PWS 1.1.4.1 Plant and Maintain Annual Beds. What is the Size, in plantable SF, of the annual beds? Also, what is the Avg number of flats installed?

Government Response: The number of flats can vary depending on the size of the plants and the layout of the beds. The average number of flats per change-out is 80.

Question 143: How many ammunition bunkers are present on JBSA Randolph?

Government Response: 502 CONS does not have access to that information

Question 144: What is the average size of the ammunition bunkers?

Government Response: 502 CONS does not have access to that information

Question 145: 3.2.4. Refuse Collection and Disposal (p. 157) – What is the size of the bulk containers? What are the base level recycling collection procedures? Will the bulk containers be shared by others? Will the Government provided 30 CY refuse container be provided for the sole use of the contractor in performance of this work?

Government Response: a.) The Yard/Green Waste container located in the laydown yard is 30 cubic yards (CY). An 8 CY Front End Load Container (dumpster) is located directly outside the contractor’s fenced area. b.) c & d.) The dumpster will be shared with the Thrift Shop adjacent to the contractor’s laydown area. The 30 CY roll off is for the contractor’s sole use and is for green waste only.

Question 146: 4.4. Environmental Requirements (p. 158) – Please provide the base environmental laws.

Government Response: Information can be obtained by the awardee from the Base Environmental Office upon award or kick-off meeting.

Question 147: 4.4.1. Hazardous Materials (p. 158) – Will the training be given by the HazMat Manager or the contractor? Will the Government be providing acceptance of any substitute hazardous materials for use? Please provide the waste minimization and pollution prevention policies.

Government Response: Training will be given by the Haz-Mat Manager located on JBSA-Randolph and additional questions can be discussed then.

Question 148: Section 52.215-21 (b) states “TBD.” Is this part N/A for this contract?

Government Response: Section 52.215-21 (b) does not apply as well.

Question 149: Appendix C data requirements. If the contractor chooses to use a commercial vendor for fuel supplies why would the contractor have to provide a fuel usage report?

· As this is a FFP solicitation and resulting contract, will a Fuel Usage Report be required when utilizing commercial vendors for fuel supplies?

Government Response: Please see PWS 3.2.1.1 Fuels in regards to Government fuel

Question 150: CLIN 0030 trim Palm tree (20) what is the average height of these palm trees?

Government Response: 27 ft.