This is a Questions and Answers (Q&A) document for Keesler Air Force Base Telecommunication Services Contract FA301027Q0001, issued on October 6, 2026. The document clarifies contract requirements and technical specifications for an incoming telecommunications service provider.
The contract period of performance runs from December 1, 2026 through November 30, 2031 (base year plus four option periods). The contractor must achieve full cutover and operational status by December 1, 2026, with no extension available if the previous contract expires on November 30. The Government will not handle CUI data under this contract; contractor equipment will only process analog voice traffic, requiring CMMC Level 1 certification. CenturyLink Communications, LLC is the current service provider, and all 20,000 telephone numbers in the 228-376 and 228-377 ranges must be ported to the awardee. One-time costs for contractor-provided equipment, installation, and number porting are included in CLIN 0002, while usage charges (long distance, international, operator and directory assistance) are included in the firm fixed monthly price under CLIN 0001. The contractor must provide 9 T1-PRI circuits with capacity for 150 concurrent SIP trunk calls, configured as standalone spans with D-channels on Government-owned/operated ISRs. E911 CAMA and ALI circuits are within contract scope; however, the Government's 81CS maintains the E911 database, and the awardee is not responsible for that function. The contractor must respond to Government POC within one hour for all priority issues. Service restoration times are specified as 8 hours for emergency, 24 hours for serious, and 2 calendar days for routine outages, with catastrophic outages requiring updates every 4 hours. The Government will provide a relay rack location with Multi-NEMA 5-15 power (15 amp, 115v), UPS/Generator backup, and cable distances up to 40 feet maximum to Building 2801.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Keesler Air Force Base Telecommunication Services (FA301027Q0001) Q&A Version 1
6 October 2026
Question # Date Received Question Response
1 1 Oct 26 DFARS 252.204-7025 states the required level is CMMC Level 2 (Self) for systems that process, store or transmit FCI or CUI.
Will the contractor receive or handle CUI under this contract? If contractor systems will handle FCI only, is a current CMMC
Level 1 (Self) status acceptable?
Contractor will not handle, store, or process CUI data. Contractor equipment will only process analog voice traffic. CMMC Level 1 is acceptable.
2 1 Oct 26 If Level 2 (Self) is required, is a Conditional
Level 2 (Self) status with a plan of action and milestones acceptable at time of award?
Level 2 is not required at this time.
3 1 Oct 26 The period of performance begins 01
December 2026, and the PWS allows no more than 30 days for cutover. Must service be fully cut over and operational on
01 December 2026, or does the 30-day cutover period begin on that date (or on the date of award)?
Fully cutover and operational on 1 Dec 2026.
4 1 Oct 26 If a new provider requires circuit installation and number porting that cannot be completed by 01 December
2026, will the Government continue the existing service until cutover is accepted, and when would billing under CLIN 0001 begin?
No. Previous contract expires 30 November, with no option to extend.
5 1 Oct 26 Page 4 of the solicitation shows a period of performance of July 1, 2026 - June 30, 2027. The CLINs show 01 December 2026 -
30 November 2027. Please confirm which is correct.
The period of performance is for a base year plus four (4) option periods: 01 December 2026 – 30 November 2031.
6 1 Oct 26 The schedule contains only monthly service
CLINs. Should one-time costs for contractor-provided equipment, installation and number porting be
CLIN 0002 was added. Reference Amendment 0001.
included in the CLIN 0001 monthly price, or will the Government add a separate line item for non-recurring charges?
7 1 Oct 26 FAR 52.217-8 is included. Will the six-month extension be evaluated, and if so at which rates?
FAR 52.212-2 was updated to include how the 6-month extension will be evaluated. Reference Amendment 0001.
8 1 Oct 26 Are usage charges (long distance, international, operator and directory assistance) to be included in the fixed monthly price, or billed separately? Please provide recent monthly minutes of use by category if available.
Included in the firm fixed price.
9 1 Oct 26 Who is the current service provider and carrier of record for the 228-376 and 228-
377 number ranges? Are all 20,000 numbers to be ported to the awardee?
Current Service provided by CenturyLink Communications, LLC. All 20,000 numbers are to be ported.
10 1 Oct 26 PWS Appendix A.7 describes CAMA trunks and ALI circuits to the base PSAP. Are these
E911 circuits within the scope of this contract, or will they remain under a separate arrangement with the current 911 system service provider? The text and the table in A.7 show different trunk quantities;
please confirm the required quantity.
Yes, CAMA and ALI circuits are in the scope of this contract, CAMA 1 (70EMXX501167)
CAMA 2 (70EMXX501168)
CAMA 3 (70EMXX501169)
ALI 1 (70HRXZ506477)
ALI 2 (70HRXZ506478)
11 1 Oct 26 Who maintains the E911 database (ALI records) for the listed numbers today, and is the awardee expected to assume that function?
E911 database is maintained by 81CS. Awardee is not expected to assume the function.
12 1 Oct 26 PWS Appendix A.3 lists two analog lines, including an emergency dial-out line for use if the Government switch fails. Must these be delivered on facilities physically separate from the PRI service, or may they be delivered from the same contractor equipment?
The analog lines omitted. See updated PWS.
13 1 Oct 26 Appendix A lists 9 T1-PRI circuits (207 bearer channels) and also 150 concurrent calls. Which figure governs the required capacity?
150 concurrent calls is the required capacity of the SIP trunk. 9 T1- PRIs are required to be handed to the government for redundancy and spread across two government owned/operated ISRs.
14 1 Oct 26 Are the existing PRIs configured as NFAS groups or as standalone spans with a D-channel each, and what ISDN protocol variant is in use on the Cisco gateways?
Existing PRIs are standalone spans with each having a D-channel.
Government Cisco gateways are using Global ISDN Switch Type NI2;
Switchback Timing Graceful; Type Of DTMF Relay NTE-CA.
Government Cisco port config is Line Coding B8ZS; Framing ESF
15 1 Oct 26 The PWS requires the contractor to respond and coordinate with the
Government POC within one hour for all priorities. Does "respond" mean contact with the Government POC, or a technician on site within one hour?
“Respond” means contact with the Government POC.
16 1 Oct 26 PWS 3.2 requires a contractor-provided relay rack. Please provide the available floor space, power (voltage, amperage, receptacle type, and whether backup power is provided) and the cable distance to the Government equipment at Building
2801.
Multi-NEMA 5-15 --15amp, 115v, UPS/Generator power provided.
Cable distance-Varies depending on required equipment rack space needed by contractor. Worst case no more than 40 feet.
17 1 Oct 26 Is there a page limit or required format for the technical submission?
No.
18 2 Oct 26 “On the PWS you have two analog lines listed, (228) 432-5037 and (228) 374-1083 however I show that these lines were disconnected last January when the switch was decommissioned. Please advise.”
The analog lines omitted. See updated PWS.
19 5 Oct 26 In reference to the 'Cutover within 30 days'
(App. A.1), when does the 30-day cutover clock start: at award of bid, Notice to
Proceed (NTP) or order acceptance?
Service needs to be up and running by 1 December.
20 5 Oct 26 What are the email follow-up deadlines for each outage type? (2.1.2 refers to times that are never specified.)
Section 2.1.4 specifies for a catastrophic outage, updates are expected every 4 hours. For emergency, serious and routine outages restoration is expected within 8 hours; 24 hours; and 2 calendar days, respectively.
21 5 Oct 26 How is 100% availability measured, and what are the remedies or penalties for a missed threshold?
The expectation is 100%, any degradation is considered less than 100%. The Contracting Office will engage with the Contractor for resolution.