Attachment 9 - Addendum 1.pdf

PDF 67 KB Posted

Attached to
Replacement of Vault Doors Federal contract opportunity
Solicitation number
FA301023R0019
Issued by
Department of the Air Force Air Education and Training Command

About this file

This addendum provides revisions to the scope of work for project number MAHG 22-1056 to replace vault doors at Building 4002, Keesler Air Force Base in Mississippi. The contractor shall confine work to designated areas, provide filters and barriers to prevent dust spread, and conduct daily cleaning at the work area. One vault door will be completed first to allow relocation of its contents to the other vault door to allow completion of that door. The related federal contract opportunity is solicitation number FA301023R0019 issued by the Department of the Air Force Air Education and Training Command to replace the vault doors.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1 Date: 08/03/2023

PROJECT NAME: Replace Vault Doors

LOCATION: Building 4002 – Keesler AFB, Mississippi

PROJECT NUMBER: MAHG 22-1056

Changes to the SOW:

1.1.1 SCOPE: Provide all equipment, labor, supervision, and materials necessary to replace vault doors at building B4002.

Notes:

1. Contractor shall confine all work to specific areas as designated in the Scope of

Work and Drawings.

2. Contractor shall provide and maintain filters, temporary dust barriers, etc. to prevent construction dust and debris from spreading throughout the HVAC system, Fire

System Devices, and IT equipment, and other spaces.

3. Contractor shall provide constant daily cleaning of the building at the work area locations.

4. This project contains work required on the existing AVANTOR alarm system.

Work on the ADVANTOR system shall be by qualified ADVANTOR technicians only.

5. Phasing of work for Taylor Logistics: Vault door 102 to be completed first, allowing

Vault door 101 to be emptied of contents and placed in Vault door 102, thus enabling Vault door 101 to be completed.

ATTACHMENTS:

N.A.

END OF ADDENDUM #1