Additional Questions

Demo 4908

1) Is it possible to receive As-Built Drawings identifying the location of the existing footings to calculate backfill material?

Please find the B-4908 foundation as-built attached.

2) The government included several components to be salvaged in Amendment 1 but what are the quantities that need to be considered for adequate pricing? Depending on the quantities it takes several personnel and man hours which affect the pricing.

Whatever the Government decides to salvage will be removed prior to the facility being handed over.

The contractor will not have to remove anything on the Government’s behalf.

The following items are on list to be salvaged:

Brass endcap/ valves for standpipe system Lighting over vanities Some control hardware Some boiler parts Some pumps Some Mini-Splits Other items as needed at the other facilities

3) What is the quantity of the mini split units?

The exact number will not be available at this time, because some of the mini split units will be salvaged by Government. See answer #2 above.

4) How many tons is the centralized HVAC system? There are no Centralized HVAC system units at the Demo Buildings.

5) Does the boiler need to be salvaged? There will be some parts from the boiler that will be salvaged.

See answer #2 above.

6) Per spec we have to remove fluorescent Lights but what are the quantities? Depending on the quantities it takes several personnel and man hours which affect the pricing.

The exact number is not available, because some will be salvaged by Government.

7) Are the existing utilities private and managed by the base or are they private? If they are private can the government provide the utility companies name and point of contact? Government will take care of locating and shutting done all the utilities. However, it is the responsibility of the contractor to cut and cap the services. However, after capping and before covering the utility lines, the Government /Vectrus Utility shop must inspect the capped lines. The point of contact will be provided to the selected contractor.

File details come from the government source that posted it. Updated .