Material Submittals Schedule

Project Number:
MAHG21-1144Project Title:
Demolish Building 4908Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1HazMat Questionnaire15 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
2HazMat MSDS115 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
3Hazmat Reporting Entry Form1115 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
4Recycling and Landfill Report11End of ContractProvide the documents as required per the Environmental packet provided by Keesler AFB.
5Warranty (Manufacturer's)1End of Contract
61-Year Warranty (Contractor)1End of Contract
7Demolition Plan12 Weeks Prior to Planned Construction Start
8Dust Control Plan12 Weeks Prior to Planned Construction Start
9Record of Existing Conditions12 Weeks Prior to Planned Construction Start
10Demolition Notificaton12 Weeks Prior to Planned Construction Start
11Ozone Depleting Substance Receipts1As Required
12Fill Gradation and Proctor Testing1As Required
13Compaction Testing Results1As Required
14Testing Lab Certifications15 Days Prior to Start Date

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)