Attachment_7,_Addendum__1.pdf
PDF 77 KB Posted
- Attached to
- FOC at Keesler Marina Federal contract opportunity
- Solicitation number
- FA301017R0022
About this file
Addendum #1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment.pdf | ||
| Attachment_2_-_Wage_Determination.pdf | ||
| Attachment_8,_Addendum__2.pdf | ||
| Amend_0003.pdf | ||
| Amend_2.pdf | ||
| Site_Visit_Sign_in.pdf | ||
| FA301017R00220001_-_Change_Block_13b.pdf | ||
| Attachment_6_-__Notice_of_Compliance.pdf | ||
| Attachment_1_-_Statement_of_Work_and_Drawings.pdf | ||
| Attachment_2_-_Wage_Determination.pdf | ||
| Attachment_3_-_PPQ.doc | DOC document | |
| Attachment_4_-_Reference_List.docx | DOCX document | |
| FA301017R0022_-_Marina_Fiber_Optic_Cable.pdf | ||
| Attachment_5_-_SF_1444.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #7
F2J3SF7159AW01
August 2, 2017
ADDENDUM #1
The following are changes to the construction documents for the following project:
FIBER OPTIC CABLING AT MARINA
KEESLER AFB, MISSISSIPPI
Any information found within these documents shall take precedent over the information contained within the original construction documents. It is the responsibility of the contractor to review the documents and to include any revised or additional information in their bid.
A. Changes to Scope of Work:
1. SOW dated 15 April 17 – para. 2.1.1.2, pg. 2, Confined Space
Current: OSHA CFR 29 Part 1910-268
New: OSHA CFR 29 Part 1910-146
2. SOW dated 15 April 17 – para. 2.2.1, pg. 5, 2.2.1- Outside Plant Requirements
Current: Transition from the underground infrastructure at HB-Marina with 2 ea. 2-inch schedule 80 conduit on the West side marina dock to each location indicated on sketch.
New: Transition from the underground infrastructure at HB-Marina with 2 ea. 2-inch schedule 80 conduit on the West side marina dock to each location indicated on sketch. The conduits should follow alone side the existing electrical conduit underneath the pier.
B. Addition to Scope of Work:
1. SOW dated 15 April 17 – para. 2.2.1.11.2.1, pg. 11-12, Fiber Optic Distribution Panel
(FODP).
Note: The NEMA boxes should be installed as to not impede with the customers and the daily duties of the
Marina staff. Check with 81 CS/SCXP for details.
C. Changes to Drawings:
1. No change required
End of Addendum #1