Attachment_7,_Addendum__1.pdf

PDF 77 KB Posted

Attached to
FOC at Keesler Marina Federal contract opportunity
Solicitation number
FA301017R0022
Issued by
Department of the Air Force Air Education and Training Command

About this file

Addendum #1

View the file

Other files for this federal contract opportunity

Other files attached to FOC at Keesler Marina, newest first.
File Type Posted
Amendment.pdf PDF
Attachment_2_-_Wage_Determination.pdf PDF
Attachment_8,_Addendum__2.pdf PDF
Amend_0003.pdf PDF
Amend_2.pdf PDF
Site_Visit_Sign_in.pdf PDF
FA301017R00220001_-_Change_Block_13b.pdf PDF
Attachment_6_-__Notice_of_Compliance.pdf PDF
Attachment_1_-_Statement_of_Work_and_Drawings.pdf PDF
Attachment_2_-_Wage_Determination.pdf PDF
Attachment_3_-_PPQ.doc DOC document
Attachment_4_-_Reference_List.docx DOCX document
FA301017R0022_-_Marina_Fiber_Optic_Cable.pdf PDF
Attachment_5_-_SF_1444.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #7

F2J3SF7159AW01

August 2, 2017

ADDENDUM #1

The following are changes to the construction documents for the following project:

FIBER OPTIC CABLING AT MARINA

KEESLER AFB, MISSISSIPPI

Any information found within these documents shall take precedent over the information contained within the original construction documents. It is the responsibility of the contractor to review the documents and to include any revised or additional information in their bid.

A. Changes to Scope of Work:

1. SOW dated 15 April 17 – para. 2.1.1.2, pg. 2, Confined Space

Current: OSHA CFR 29 Part 1910-268

New: OSHA CFR 29 Part 1910-146

2. SOW dated 15 April 17 – para. 2.2.1, pg. 5, 2.2.1- Outside Plant Requirements

Current: Transition from the underground infrastructure at HB-Marina with 2 ea. 2-inch schedule 80 conduit on the West side marina dock to each location indicated on sketch.

New: Transition from the underground infrastructure at HB-Marina with 2 ea. 2-inch schedule 80 conduit on the West side marina dock to each location indicated on sketch. The conduits should follow alone side the existing electrical conduit underneath the pier.

B. Addition to Scope of Work:

1. SOW dated 15 April 17 – para. 2.2.1.11.2.1, pg. 11-12, Fiber Optic Distribution Panel

(FODP).

Note: The NEMA boxes should be installed as to not impede with the customers and the daily duties of the

Marina staff. Check with 81 CS/SCXP for details.

C. Changes to Drawings:

1. No change required

End of Addendum #1