Amend_0003.pdf

PDF 68 KB Posted

Attached to
FOC at Keesler Marina Federal contract opportunity
Solicitation number
FA301017R0022
Issued by
Department of the Air Force Air Education and Training Command

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to FOC at Keesler Marina, newest first.
File Type Posted
Amendment.pdf PDF
Attachment_2_-_Wage_Determination.pdf PDF
Attachment_8,_Addendum__2.pdf PDF
Amend_2.pdf PDF
Attachment_7,_Addendum__1.pdf PDF
Site_Visit_Sign_in.pdf PDF
FA301017R00220001_-_Change_Block_13b.pdf PDF
Attachment_5_-_SF_1444.pdf PDF
Attachment_4_-_Reference_List.docx DOCX document
FA301017R0022_-_Marina_Fiber_Optic_Cable.pdf PDF
Attachment_6_-__Notice_of_Compliance.pdf PDF
Attachment_1_-_Statement_of_Work_and_Drawings.pdf PDF
Attachment_2_-_Wage_Determination.pdf PDF
Attachment_3_-_PPQ.doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2J3SF7159AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to include Addendum #2 of the SOW and to revise Section L, paragraph A of the solicitation. The deadline for receipt of proposals has been extended.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA301017R0022

X 9B. DATED (SEE ITEM 11)

14-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2017

CODE

81ST CONTRACTING SQUADRON

TSGT THOMAS HUTCHINS

310 M STREET, RM 102

KEESLER AFB MS 39534-2701

FA3010 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA301017R0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 14-Aug-2017 02:00 PM to 16-Aug-2017 02:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

Document Name Pages Date Attachment 1 - Statement of Work + Drawings 26 25-Apr-17 Attachment 2 - Wage Determination MS119 5 3-Mar-17 Attachment 3 - PPQ 3 Attachment 4 - Reference List 1 Attachment 5 - SF 1444 3 Attachment 6 - Notice of Compliance 3 Attachment 7 - Addendum #1 1 2-Aug-17 Attachment 8 - Addendum #2 1 8-Aug-17

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

PROPOSAL PREPARATION

SECTION L

Section L - PROPOSAL PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and other technical requirements. Offerors compliance with solicitation requirements will be the basis for a Technical rating of either “Acceptable” or “Unacceptable.” Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of two (2) separately bound parts, Part I - Price Proposal, and Part II - Past Performance Information. (AMENDMENT 0003 ADDITION) - All proposals shall also include the following information: Proof of current Building Industry Consulting Service International (BICSI) certificates, reference Statement of Work (Dated 15 April 2017), para 2.1.6.2 -On site General Personnel Requirements; Notional time-lines (Schedule); and Engineer, Furnish, Installation and Test (EFIT) - Install Plan.

B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness of the price.

C. Specific Instructions:

1. PART I – PRICE PROPOSAL - Submit original and one (1) copy.

D. Complete blocks 14, 15, 16, 17, 19 (if any amendments are issued), and 20A, 20B, 20C of the RFP Section A, SF1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

E. Insert proposed unit prices in Section B for Contract Line Item Number (CLIN) 0001.

F. Complete the necessary fill-ins and certifications in Sections H through K. Section K shall be returned in its entirety.

2. PART II – PAST PERFORMANCE INFORMATION

(a) Reference List. Provide a list of no more than three (3), of the most relevant contracts performed for Federal agencies or commercial customers within the last three (3) years. For the purpose of this solicitation, recent contracts are defined as those on which some portion of performance occurred during the last three (3) years from date of receipt of proposal. Relevant performance includes present/past performance effort involving similar scope, magnitude of effort and complexities of this solicitation. The offeror shall submit references by completing Solicitation Attachment 4, PAST PERFORMANCE LIST OF REFERENCES, for contracts that you consider relevant in demonstrating your ability to perform the requirements in this solicitation. Offerors must ensure the descriptions of the efforts submitted include enough detail to demonstrate similarities in scope, magnitude and complexities of this solicitation. The completed PAST PERFORMANCE LIST OF REFERENCES must be submitted with your offer and received by the RFP closing date and time.

(b) Questionnaires. Offerors shall send Past Performance Questionnaires to each of the Points of Contact (POCs) identified on Attachment 4, Past performance List of References. Completed questionnaires shall be submitted directly to the Contracting Office. The questionnaire to be submitted to each POC is included as Solicitation Attachment 3, Past Performance Questionnaire. Each of the Offeror’s POCs shall e-mail the completed questionnaire to SSgt Thomas Hutchins at thomas.hutchins@us.af.mil, with a courtesy copy to SSgt Maxwell Watanga at maxwell.watanga.1@us.af.mil. Respondents may also fax the completed Past Performance Questionnaire directly to (228)377-3298. Mailing the questionnaire(s) to the address listed below is an acceptable alternative method of transmission. If mailing, the outside envelope must be marked as follows:

NOTE: TO BE OPENED BY ADDRESSEE ONLY

81 CONS/LGCA, Attn: Thomas Hutchins 310 M Street Keesler AFB MS 39534-2147

THIS OFFICE STRONGLY RECOMMENDS ALL OFFERORS REQUEST THEIR REFERENCES TO SUBMIT

THEIR PAST PERFORMANCE QUESTIONNAIRES IMMEDIATELY. RECIEPT IS DESIRED BY THE

OFFER DUE DATE.

(c) The evaluation of PPI will take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this solicitation. The type of past performance information (PPI) identified under Attachment 4 will determine which of the remaining paragraphs apply.

(1) For PPI where the offeror (including Joint Ventures (JV)) was a prime contractor; comply with paragraph (d)

(2) For PPI where the offeror was a subcontractor; comply with paragraphs (d) & (e)

(3) For PPI where the offeror is using a subcontractor’s PPI; comply with paragraph (d) & (f) mailto:maxwell.watanga.1@us.af.mil

(4) For PPI where the offeror(s) are part of a teaming arrangement or JV; comply with paragraph

(d) & (g)

(5) For PPI where the offeror key personnel; comply with paragraph (h)

(d) Furnish the following information for each contract listed:

(i) Company/Division name

(ii) Product/Service

(iii) Contracting Agency/Customer

(iv) Contract Number

(v) Total Contract Dollar Value and Annual Contract Values

(vi) Period of Performance

(vii) Verified, up-to-date name, address, FAX & telephone number and e-mail address of the contracting officer

(vii) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.

(e) If offeror is using PPI from work they performed as a subcontractor listed in Attachment 4, in addition to information requested in paragraph (c) above, furnish the following information:

(i) What function(s)/task(s) did the subcontractor perform on the Atch 4 contract?

(ii) What percentage of the total contract value/annual value did the offeror perform on the Attachment 5 contract?

(iii) What was the value of the subcontract (if applicable) for each year and total amount on the Attachment 5 contract?

(f) If using PPI from subcontractors as part of list in Attachment 4, in addition to information requested in paragraph

(c) above, furnish the following information:

(i) What function(s)/task(s) did the subcontractor perform on the Attachment 4 contract?

(ii) What function(s)/task(s) will the subcontractor perform on this contract?

(iii) What percentage of the total contract value/annual value did the subcontractor perform on the Attachment 5 contract?

(iv) What percentage of the total contract value/annual value will the subcontractor perform on this contract?

(g) If a teaming arrangement or JV is proposed, the offerors shall provide complete information as to the arrangement, including any relevant and recent past/present performance information on previous teaming or JVs with same partner. In addition to information requested in paragraph (c) above for each team/JV member, furnish the following information:

(i) What function(s)/task(s) will each team or JV member perform on this contract?

(ii) What approximate percentage of the total contract value/annual value will each team or JV member perform on this contract?

(h) If using PPI from key personnel as part of list in Attachment 4, in addition to information requested in paragraph

(c) above, furnish the following information:

(i) What function(s)/task(s) did the key personnel perform on the Atch 4 contract?

(ii) What function(s)/task(s) would the key personnel perform on this contract?

(iii) What percentage of the total contract value/annual value did the key personnel perform on the Atch 4 contract?

(iv) What percentage of the total contract value/annual value will the key personnel perform on this contract?

(End of Summary of Changes)

File details come from the government source that posted it. Updated .