MAHG151099_Q&A__1.pdf

PDF 125 KB Posted

Attached to
Repair Street & Parking Lot Striping
Solicitation number
FA301017R0017
Issued by

View the file

Other files

File Type Posted
Amendment_3.pdf PDF
Amendment_2.pdf PDF
Site_Visit_Sign_In_Redacted.pdf PDF
Attachment_4_-_Reference_List.docx DOCX document
Attachment_7_-_Wage_Det_MS170237.pdf PDF
Attachment_2_-_Drawing.pdf PDF
Attachment_6_-_Notice_of_Compliance.pdf PDF
17-R-0017_Sol.pdf PDF
Attachment_5_-_SF_1444.pdf PDF
Attachment_3_-_PPQ.doc DOC document
Attachment_8_-_SOW.pdf PDF
SF_30.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR EDUCATION AND TRAINING COMMAND

19 July, 2017

MAHG151099 REPAIR STREET & PARKING LOT STRIPING

QUESTIONS & ANSWERS 1

1. Please specify the type of markings required. The specs list multiple types of application, but nothing states which spec is applicable to this project.

Answer: Paint markings with reflector beads as called for and specified

2. If thermoplastic is required, please be sure to state if hot or cold application is required.

There's is substantial price difference between the two.

Answer: Thermoplastic markings are not required.

3. Are pavement reflectors part of this project?

Answer: Pavement reflectors are part of this project at existing roadways with reflectors.

4. Will multiple mobilizations be required to complete the work or can all work be completed with one mobilization and one demobilization priced into the proposal?

Answer: Multiple mobilization are the contractor’s option and will depend on their Scheduling and Coordination with Keesler AFB. Parking lot striping is to be done on the weekends which may include 'Down Fridays' and Holidays at Contractor’s option. Contractor shall provide and post 18”x24” warning signage at each parking lot entrance 1 week in advance of striping each parking lot.

5. If thermoplastic is to be applied will the existing thermoplastic need to be removed prior to application?

Answer: NA

6. If thermoplastic is required, please be sure to state if hot or cold application is required.

There’s is substantial price difference between the two Answer: NA

7. We are requesting the pay items per sheet 3 of 3 of the project drawings under general note 2:

Edge stripe shall be same material as lane-line stripe (paint or plastic as indicated in pay items). We believe having these pay items will provide quantities for paint and plastic (thermo) to be installed per the scope of work.

Answer: See approximate quantities in the Scope of Work.

8. Please let us know if all parking parallel to streets are included in new striping. Currently, some adjacent parking areas are greyed out and some are not. -Will parking areas that are adjacent to the streets that are to me striped be striped also?

Answer: Yes

9. After the Contractor provides 3 days notice prior to striping parking lots, will the Air Force close the lot or will the Contractor be responsible for coning it off?

Answer: See Question #4. Contractor shall cone off at 1800 the evening before striping.

NOTE: Thermoplastic was mentioned a lot times in the Specifications attachment. Please disregard these references.