Amendment_3.pdf

PDF 25 KB Posted

Attached to
Repair Street & Parking Lot Striping
Solicitation number
FA301017R0017
Issued by

About this file

Amendment 3 Q&A 1

View the file

Other files

File Type Posted
MAHG151099_Q&A__1.pdf PDF
Amendment_2.pdf PDF
Site_Visit_Sign_In_Redacted.pdf PDF
Attachment_4_-_Reference_List.docx DOCX document
Attachment_7_-_Wage_Det_MS170237.pdf PDF
Attachment_2_-_Drawing.pdf PDF
Attachment_6_-_Notice_of_Compliance.pdf PDF
17-R-0017_Sol.pdf PDF
Attachment_5_-_SF_1444.pdf PDF
Attachment_3_-_PPQ.doc DOC document
Attachment_8_-_SOW.pdf PDF
SF_30.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2J31D7143AW03

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to notify offerors of the Questions & Answ ers issued on 19 July 201 on FBO.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA301017R0017

X 9B. DATED (SEE ITEM 11)

29-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jul-2017

CODE

81ST CONTRACTING SQUADRON

SSGT MAXWELL WATANGA

310 M STREET, RM 102

KEESLER AFB MS 39534-2701

FA3010 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA301017R0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003: Q&A 1

MAHG151099 REPAIR STREET & PARKING LOT STRIPING

QUESTIONS & ANSWERS 1

1.Please specify the type of markings required. The specs list multiple types of application, but nothing states which spec is applicable to this project.

Answer: Paint markings with reflector beads as called for in the SOW and drawings and specified. Disregard specification sections on thermoplastics.

2.If thermoplastic is required, please be sure to state if hot or cold application is required. There's is substantial price difference between the two.

Answer: Thermoplastic markings are not required.

3.Are pavement reflectors part of this project?

Answer: Pavement reflectors are part of this project at existing roadways with reflectors.

4.Will multiple mobilizations be required to complete the work or can all work be completed with one mobilization and one demobilization priced into the proposal?

Answer: Multiple mobilization are the contractor’s option and will depend on their Scheduling and Coordination with Keesler AFB. Parking lot striping is to be done on the weekends which may include 'Down Fridays' and Holidays at Contractor’s option. Contractor shall provide and post 18”x24” warning signage at each parking lot entrance 1 week in advance of striping each parking lot.

5.If thermoplastic is to be applied will the existing thermoplastic need to be removed prior to application?

Answer: NA

6.If thermoplastic is required, please be sure to state if hot or cold application is required. There’s is substantial price difference between the two.

Answer: NA

7.We are requesting the pay items per sheet 3 of 3 of the project drawings under general note 2:Edge stripe shall be same material as lane-line stripe (paint or plastic as indicated in payitems). We believe having these pay items will provide quantities for paint and plastic(thermo) to be installed per the scope of work.

Answer: See approximate quantities in the Scope of Work.

8.Please let us know if all parking parallel to streets are included in new striping. Currently,some adjacent parking areas are greyed out and some are not. Will parking areas that are adjacent to the streets that are to be striped be striped also?

FA301017R0017

Answer: Yes

9.After the Contractor provides 3 days notice prior to striping parking lots, will the Air Force close the lot or will the Contractor be responsible for coning it off?

Answer: Contractor shall cone off at 1800 the evening before striping.

SECTION A - SOLICITATION/CONTRACT FORM

The Issued By organization has changed from

81ST CONTRACTING SQUADRON

DONALD KINSMAN

500 FISHER ST, BLDG 0701, RM 202G

KEESLER AFB MS 39534

to

81ST CONTRACTING SQUADRON

310 M STREET RM 102

KEESLER AFB MS 39534-2701

(End of Summary of Changes)

File details come from the government source that posted it. Updated .