ReadyCombinedSA15.doc

DOC document 435 KB Posted

Attached to
Maxwell-Gunter AFB BOS FA3002-06-R-0004 Federal contract opportunity
Solicitation number
FA3002-06-R-0004
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

PWS Service Area 15

View the file

Other files for this federal contract opportunity

Other files attached to Maxwell-Gunter AFB BOS FA3002-06-R-0004, newest first.
File Type Posted
Service Delivery Summary w val method for Bidders V2 amendment 0013.xls XLS spreadsheet
10 05 MAX Housing Workload Appendix 10 B amendment 0013.doc DOC document
10-1 Housing Turnover Efficiency amendment 0013.doc DOC document
ATTACH7MaxwellCostModel-25Mar08Amend0013.xls XLS spreadsheet
Conformance Letter.pdf PDF
FA3002-06-R-0004Conformed copy Amend 0013 26Mar08.pdf PDF
BWS-SAG SDS Metric amend 0013.doc DOC document
19 06 MAX Custodial Maps Appendix 19C amendment 0013.doc DOC document
Amendment 0013 SF 30 26Mar08.pdf PDF
ATTACH6ManpowerMatrix-6AUG08Amend0016.xls XLS spreadsheet
ATTACH7MaxwellCostModel-6Aug08Amend0016.xls XLS spreadsheet
ATTACH6ManpowerMatrix-21AUG08Amend0017.xls XLS spreadsheet
FA3002-06-R-0004Conformed copy Amend 0017.doc DOC document
02 05 MAX All-Services Workload Appendix 2B(Amendment 14).doc DOC document
Amendment 0014 SF 30 5May08.pdf PDF
FA3002-06-R-0004Conformed copy Amend 0014 5May08.pdf PDF
PostingENQuestionResponseAmend12_26Mar08.pdf PDF
PostingResponsetoQuestionsdated14Mar08.pdf PDF
Amend0011.zip ZIP file
Amend0009.zip ZIP file
Amend0006.zip ZIP file
PostingQuestions04June.xls XLS spreadsheet
PostingQuestions29May.xls XLS spreadsheet
MaxwellSiteVisit.doc DOC document
FA3002-06-R-0004Amendment0003SF30.doc DOC document
Amendment0001.zip ZIP file
ATTACH16PART1DRAFTPP.zip ZIP file
ATTACH2-3WAGEDETERMINATIONSANDCONFORMED.zip ZIP file
FA3002-06-R-0004.pdf PDF
ATTACH15CommentQuestionform.doc DOC document
ATTACH4FederalHireEquivalents.rtf RTF text file
ATTACH8-13PASTPERFORMANCE.zip ZIP file
ATTACH7MaxwellCostModel-26Mar07.xls XLS spreadsheet
ATTACH14SubktrPlanPlusQPIWorksheetV3.xls XLS spreadsheet
Section7-Consolidated.doc DOC document
QuestionFormDraftPWSSection7.doc DOC document
ReadyCombinedSA07.doc DOC document
6_QuestionFormDraftPWS.doc DOC document
RFIDraftPWS5.doc DOC document
RFIDraftPWS12and25.doc DOC document
ReadyCombinedSA24.doc DOC document
ReadyCombinedSA23.zip ZIP file
RFIDraftPWS1.doc DOC document
NEWTABLEOFCONTENTS1.doc DOC document
ReadyCombinedSA13.doc DOC document
ReadyCombinedSA26.doc DOC document
RFIDraftPWS22 26 and32.doc DOC document
ReadyCombinedSA9.doc DOC document
ReadyCombinedSA20.doc DOC document
RFIDraftPWS3 9 and20.doc DOC document
Show all 50

Maxwell-Gunter AFB BOS FA3002-06-R-0004 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA3002-06-R-0004

APPENDIX LISTING

Appendix 15A – Applicable Publications A-1 Appendix 15B – Workload Data B-1

Appendix 15C – Maps and Work Areas C-1

Appendix 15D – Required Reports D-1

Appendix 15E – Collateral Tasks E-1

Appendix 15F – Government Furnished Property and Services

Supplies, Materials, and Leased Equipment F-1

Appendix 15FA – Government Furnished Property and Services

Facilities

FA-1

Appendix 15FB – Government Furnished Property and Services

Equipment Authorized In-use Detail (EAID)

FB-1

Appendix 15FC – Government Furnished Property and Services

Non-EAID

FC-1

Appendix 15FD – Government Furnished Property and Services

Common Hand Tools

FD-1

Appendix 15FE – Government Furnished Property and Services

Automated Data Processing Equipment

FE-1

Appendix 15FF – Government Furnished Property and Services

Vehicles

FF-1

Appendix 15FG – Government Furnished Property and Services

Training

FG-1

Appendix 15G – Definitions and Acronyms G-1

Appendix 15H – Operations Plans (OPLANS) and Support Agreements H-1

Appendix 15I – Special Training, Certification and License Requirements I-1

SECTION 15-1

15.1. ENGINEERING SERVICES

15.1.1. DESCRIPTION OF SERVICES: Provide efficient, effective, and timely engineering services for Maxwell-Gunter AFB, including comprehensive planning, project programming, project management, design and construction management, technical assistance and evaluations, engineering support, warranty service management, and GEOBASE management. Ensure optimal functional use of land areas and facilities while maintaining harmony with the architectural character of existing facilities, the environment, the General Plan, and established base standards. Develop, maintain, and assertively support a Facilities Project program and a Facilities Master Plan for facility and infrastructure improvement, modernization, and major repair. Provide comprehensive design for all projects, except (1) MILCON and (2) those projects designed by other agencies in accordance with base support agreements. Apply effective construction management to ensure that all construction activities comply with all codes, regulations and standards. Maintain project documentation that ensures a complete and thorough representation of the submission, approval, prioritization, development and satisfaction of requirements as outlined in the publications listed in Appendix 15A. Provide all procurement activities for projects less than $750,000. For projects less than $250,000, include the costs in your annual operating target. Operate, maintain and update all data files in the Interim Work Information Management System (IWIMS), Automated Civil Engineering System (ACES), and all other AF-mandated data systems and Geographic Information Systems (GIS). Provide updates, responses, reports, briefings, and written or verbal status updates of all engineering projects and programs. Utilize various applications, including renderings, computer-generated graphics, Computer Aided Design and Drafting (CADD), slides, and overhead projection, to convey layouts, elevations, exterior appearances, and schedules. Provide all engineering services in accordance with all applicable directives as listed in Appendix 15A.

15.1.2. SERVICES TO BE PROVIDED:

15.1.2.1. COMPREHENSIVE PLANNING:

15.1.2.1.1. Develop, maintain, and implement appropriate comprehensive planning documents to optimize facility investments in support of Maxwell-Gunter’s mission requirements.

15.1.2.1.2. Develop and maintain the Base General Plan and Component Plans (consisting of the Composite Constraints and Opportunities Plan, Infrastructure Plan, Land Use and Transportation Plan, and Capital Improvements Program (CIP) Plan). Ensure the plans are reviewed annually (at a minimum) and updated as changes occur. Ensure coordination and approval of new and revised plans by all affected organizations.

15.1.2.1.3. Identify, maintain, coordinate, and obtain approval for facility sitings in accordance with the Base General Plan. Ensure that explosive safety, airfield safety, environmental siting constraints, and security requirements are met.

15.1.2.1.4. Develop and maintain an installation Housing Community Plan (HCP). If/when housing is privatized, review and coordinate on all plans developed by the housing privatization project owner (PO).

15.1.2.1.5. Manage and update permanent and temporary airfield and airspace criteria waivers in accordance with governing publications. Prepare, submit, and obtain timely approval of annual airfield and airspace criteria waiver packages. Ensure temporary criteria waivers are obtained before the start of construction or special projects. Phase airfield construction projects in accordance with governing publication.

15.1.2.1.6. Participate with Wing Safety, Terminal Instrument Procedures (TERPS), Air Traffic Control and Landing Systems (ATCALS) maintenance, and the Airfield Manager in the annual airfield and airspace criteria waiver review and airfield certification inspection.

15.1.2.1.7. Manage the Air Installation Compatibility Use Zone (AICUZ) program. Working with Safety, Bioenvironmental Engineering, Airfield Operations, Airfield Management, and flying units, evaluate the AICUZ study and update when required. Conduct formal evaluations every two years, sooner if changes require. Oversee the public notification requirements in coordination with the Command Judge Advocate and Public Affairs.

15.1.2.1.8. Manage the interagency and intergovernmental coordination program for environmental planning (IICEP), including development and maintenance of the Memorandum of Understanding (MOU) with the appropriate planning agency. Coordinate activities with the local community.

15.1.2.1.9. Coordinate, analyze, and prepare reports to base senior leadership and other organizations concerning all off-base actions that could affect the Maxwell-Gunter mission, real property, or other related activities. Attend scheduled City of Montgomery Planning Commission and City Council meetings and Montgomery County Commission meetings where items which may impact Maxwell-Gunter AFB are discussed or presented.

15.1.2.1.10. Provide short-notice briefings to command personnel on all or selected parts of projects, programs and the general plan. Maintain a database of historical and current facts and photos for computer or hard-copy briefings.

15.1.2.1.11. Utilize electronic data and systems to manage, manipulate, and maintain comprehensive planning information. Examples include Geographic Information Systems (GIS), Computer Aided Design and Drafting (CADD), Automated Facility Mapping (AF/M), multimedia, spreadsheets, databases, the Internet and the World Wide Web.

15.1.2.2. PROJECT PROGRAMMING:

15.1.2.2.1. Compile project requirements and appropriate programs.

15.1.2.2.2. Develop recommended facilities project programs and determine facility requirements in accordance with the Base General Plan, the Housing Community Plan, work requests, and the Facility Investment Metric (FIM). Submit programs through the wing corporate structure to develop final approved programs.

15.1.2.2.3. Develop an integrated design priority list of all program types submitted to and approved by the Wing corporate structure.

15.1.2.2.4. Compile, develop, and maintain comprehensive, complete requirements documents and cost estimates that facilitate the planning, programming, design, and construction of facility projects. Obtain all required coordination and approval.

15.1.2.2.5. Manage and maintain current, accurate data in IWIMS, ACES, and all other AF-mandated data systems for all facility programs.

15.1.2.2.6. Ensure project scopes identify and validate all project requirements.

15.1.2.2.7. Develop programming estimates and maintain documentation with each project.

15.1.2.2.8. Manage the facilities investment metric (FIM) in accordance with Air Force policy and MAJCOM guidance. Maintain and update the FIM program and make all required submittals to MAJCOM.

15.1.2.2.9. Develop and annually update a five-year Operations and Maintenance (O&M) facilities project program and a long-range facility master plan.

15.1.2.2.10. Submit wing-approved programs and project data as requested to MAJCOM.

15.1.2.2.11. Advocate for approved programs.

15.1.2.2.12. Provide planning, programming, and engineering support to higher headquarters site surveys, process action teams, and site activation task forces engaged in the bed-down of new missions or the realignment of existing missions.

15.1.2.3. PROJECT MANAGEMENT:

15.1.2.3.1. Execute facility project program in accordance with the wing corporate structure’s integrated facility program list.

15.1.2.3.2. Prepare comprehensive and complete requirements documents and cost estimates that facilitate programming and design of facility projects. Further refine project requirements and criteria identified during project programming with all project team members, associated groups, and external organizations to ensure a completed end product.

15.1.2.3.3. Establish production schedules that meet expected and required completion deadlines for all affected organizations.

15.1.2.3.4. Provide coordination and liaison support to facilitate projects executed by the Army Corps of Engineers or the Naval Facility Command. Examples of liaison duties include scheduling outages, processing turnover documents and parts at end of projects, scheduling training and testing for base personnel, providing data on existing utilities/facilities, providing recommendations on accepting facilities, processing closeout documentation, representing user for warranty issues, etc.

15.1.2.3.5. Maintain current records of project costs including original awards, current amounts, and settlement costs.

15.1.2.3.6. Provide project status updates to higher headquarters primarily through the use of WIMS, ACES and other AF-mandated data systems.

15.1.2.3.7. Keep all local organizations affected by assigned projects up to date on status of design and construction or planning as it pertains to the accomplishment of the project.

15.1.2.3.8. Represent the government as expert witness or in defense of claims by preparing all technical documentation relating to design, cost, and construction, and present the information, as required by the government

15.1.2.3.9. Provide assistance in the preparation of documents, slides, briefing folders, and inspection documentation to support miscellaneous audits, inspections, and distinguished visitor visits.

15.1.2.4. PROJECT DESIGN:

15.1.2.4.1. Maintain full responsibility for design requirements of all projects, except (1) MILCON and (2) projects designed by other agencies IAW with base support agreements. Provide functional and technical design reviews, coordination, and support for MILCON and projects designed and executed by others.

15.1.2.4.2. Provide registered professional architect(s) and registered professional civil, electrical, and mechanical engineer(s) that provide direct oversight of designs and design reviews.

15.1.2.4.3. Prepare designs to account for all known conditions and constraints, to allow for maximum flexibility, and to ensure adherence to all building codes, regulatory laws, and safety standards indicated in Appendix 15A.

15.1.2.4.4. Identify and validate project design requirements with all project team members, using agencies, associated groups, and external organizations to further refine and coordinate project requirements and criteria identified during project programming. Coordinate complete design process with, and obtain approval from, the customer and all other applicable organizations.

15.1.2.4.5. Complete a thorough design analysis for all elements of the project including: electrical, mechanical, civil, structural, lighting, communication, architectural, life safety, fire protection, environmental, historical preservation, acoustical, interior design, and landscape architecture. Provide comprehensive conceptual design, schematic design and design development addressing all known aspects of the work affecting functional requirements, material performance, and system selections.

15.1.2.4.6. Perform site visits and collect/analyze data to validate customer requirements, site conditions, and site layouts.

15.1.2.4.7. Accomplish cost estimates for planning, design, and construction that reflect all work to be accomplished and are appropriate for the current level of design. Comply with all known budgetary and time constraints. Support and assist in price negotiations and in defense of claims as required by the procurement activity.

15.1.2.4.8. Prepare and maintain project design documentation that accurately track design sequence and rationale of design decisions, parametric cost estimates for various design phases, decisions on building materials and other pertinent project information.

15.1.2.4.9. Provide necessary construction documents (drawings, specifications, cost estimates, and other required documents) using applications (CADD, word processing, spreadsheet) compatible with current base systems. For projects procured by Base Contracting or other government procurement agency (i.e. projects over $750,000.00) ensure construction document packages meet procurement official’s requirements and standards.

15.1.2.4.10. Provide hard copies and/or electronic media copies of design and construction documents to base organizations and HQ during design, design review, procurement, and construction.

15.1.2.4.11. Provide technical support for, and coordination on, project amendments and project clarifications as required by the procurement activity.

15.1.2.4.12. Provide comprehensive briefings including graphic presentations of current and future projects using renderings, computer-generated graphics, slides, and overhead projection to convey layouts, elevations, exterior appearances, schedules, and phasing to management staff.

15.1.2.5. TECHNICAL ASSISTANCE AND EVALUATIONS:

15.1.2.5.1. Provide planning, design, and construction estimates to support base organizations in their planning and budgeting cycle preparations and management presentations.

15.1.2.5.2. Conduct feasibility studies on requested work resulting in schematic designs and statements of work to assist base organizations in project programming.

15.1.2.5.3. Provide review and approval of work orders, project requests, design drawings and specifications, and construction documents prepared by base or other organizations for compliance with codes, standards, and requirements. Documents may consist of construction documents generated by the supplier’s staff members or may be provided from outside the supplier’s direct control.

15.1.2.5.4. Provide assistance to all base organizations that need technical evaluations (to support their facility project planning and development), safety evaluations, hazard report assessments, and on-site engineering assistance.

15.1.2.5.5. Provide technical evaluations of Energy Savings Performance Contract (ESPC) proposals and make recommendations to Base Contracting. Validate savings of executed ESPC contracts based on review of Annual Verification Reports from the ESPC contractor.

15.1.2.6. ENGINEERING SUPPORT:

15.1.2.6.1. Ensure accurate and timely updates of master facility drawings and infrastructure maps. Solicit, collect, and provide on-going updates of as-built drawings of base real property facilities and infrastructure regardless of method of modification.

15.1.2.6.2. Maintain all reproduction and survey equipment necessary to support survey tasking, design production, and procurement packages.

15.1.2.6.3. Maintain and provide centralized storage of as-built drawings, construction drawings, and specifications for Base projects as well as a search and inventory catalog file system for all CADD and GIS files.

15.1.2.6.4. Provide accurate field surveys and CADD support for all activities and projects on Maxwell-Gunter using equipment and systems compatible with current base systems.

15.1.2.6.5. Provide support in performing damage assessment for exercises and natural and man made disasters. Provide emergency survey support. Examples include aircraft crash sites and environmental contamination areas.

15.1.2.6.6. Maintain technical library, keeping all references up to date, ordering new technical publications, and keeping all associated information systems operational.

15.1.2.6.7. Provide briefing slides and maps on an as-needed basis with minimal notification, using computer software compatible with base systems.

15.1.2.6.8. Provide planning, design, and engineering support to higher headquarters when required.

15.1.2.6.9. Coordinate, interface, and provide technical assistance to the utility providers, the base electrical distribution system owner/operator, and the Energy Savings Performance Contractor (ESPC) to ensure all records are maintained and updated.

15.1.2.6.10. Provide technical expertise and maintain/manage engineering plans, for example Heating Ventilating Air/Conditioning (HVAC) Plan, Pavements Plan, Roofing Plan, Electrical Plan, Storm Water Drainage Plan, Warranty program, and Airfield Pavements Program.

15.1.2.7. CONSTRUCTION MANAGEMENT:

15.1.2.7.1. Support all preconstruction and project coordination meetings, including those led by base contracting, Army Corps of Engineers, DECA, and AAFES, by providing appropriate data and information in both written form and oral brief.

15.1.2.7.2. Provide thorough review and approval of contract submittals, including construction material submittal data and samples, for compliance with contract requirements. Fully document these review and approval actions.

15.1.2.7.3. Inspect all construction activities for compliance with contract documents and approved submittals. Determine frequency of inspections based on length, scope and complexity of project, and as required to ensure all requirements are met. Take appropriate action to correct all deficiencies.

15.1.2.7.4. Ensure building codes, regulatory laws, and safety standards are met.

15.1.2.7.5. Review and report contract progress according to the project schedule. Validate contractor invoices for progress payment and recommend approval/disapproval.

15.1.2.7.6. Provide, maintain and store all construction management documentation, including comprehensive daily entries, construction inspection records, and coordinated digging permits.

15.1.2.7.7. Input accurate and timely data into IWIMS, ACES, or other AF-mandated data systems at project contract award. Track required contract data.

15.1.2.7.8. Coordinate and schedule all utility outages, road closures, and facility disruptions to minimize impact to customers and other base organizations and report to base populous through all available resources. Coordinate same for Corps of Engineers, DECA, AAFES, and any other construction projects on base.

15.1.2.7.9 For construction services over $750,000 and other miscellaneous construction services procured through a government procurement agency, provide technical and management support to the applicable contracting agency.

15.1.2.7.10. Process and/or review all requests for contract clarifications or modifications, recommend approval/disapproval, and submit documentation to procurement activity in a timely manner.

15.1.2.7.11. Support and assist in modification price negotiations; prepare technical documentation and funding documentation as required by procurement activity.

15.1.2.7.12. Provide and coordinate closeout documentation and acceptance forms to all appropriate offices, including Base Contracts, real property office, and O&M functions.

15.1.2.7.13. Receive, review, and distribute required O&M manuals on installed equipment. Coordinate and schedule building system training and O&M training with all responsible organizations.

15.1.2.7.14. Receive, review, and ensure coordination of all “as-built” documentation.

15.1.2.7.15. Provide required coordination, support, project management, construction management, and construction inspection for projects executed by/for tenant organizations.

15.1.2.7.16. Research, compile, and answer all post-contract completion information requirements and requests.

15.1.2.8. WARRANTY SERVICES:

15.1.2.8.1. Implement a warranty program to ensure proper execution of all warranties.

15.1.2.8.2. Receive, review, and distribute required warranties to all appropriate personnel.

15.1.2.8.3. Update IWIMS, ACES, or other AF-mandated replacement systems with all warranty information.

15.1.2.8.4. Coordinate and accomplish pre-warranty expiration inspections.

15.1.2.8.5. Schedule warranty repairs and verify repairs are completed IAW warranty.

15.1.2.9. GEOBASE MANAGEMENT:

15.1.2.9.1. Manage and keep current GeoBase program and data bases.

15.1.2.9.2. Maintain/update the “MAFB Strategic Plan” that provides direction for future GeoBase actions (see AF Strategic Plan). Identify the steps, timelines, and goals necessary to maintain and update the system.

15.1.2.9.3. Manage and maintain the Maxwell GeoBase program including the Maxwell Common Installation Picture (CIP) for Maxwell AFB as specified in the MAFB Strategic Plan.

15.1.2.9.4. Attend government furnished classes, seminars, and conferences to keep GeoBase knowledge and skills current.

15.1.2.9.5. Act as base POC for all GeoBase related issues.

15.1.2.9.6. Ensure the information contained in the CIP provided by AETC is maintained in accordance with AETC guidance.

15.1.2.9.7. Provide GeoBase/GIS technical support to include GIS technical products, GeoBase maps and surveys to base organizations and customers.

15.1.3. PRIORITY SERVICE LEVELS:

Priority
Service Receiver
Services Provided
1
Funded Storm Damage Projects (Mission Impact)
Quicker response

Legal Claims

Congressional Inquiries Quicker response

Travel

Expert Witness

FOIA Requests
Quicker response

Research

Crash Response
Quicker response

Overtime

HQ Tasking
Quicker Response

Travel

Additional Documents

42 ABW/CC & MSG/CC requests
Quicker Response

Reports

Additional briefings

Contract Modifications

Audits, VIP Visits, Inspections,
Quicker Response

Additional Briefings/Status Reports

Visitor’s Agenda and Escort Duties

Funded End-of-Year Projects
Quicker response
Special Interest Projects
Quicker Response

Additional briefings

Increased inspections/Status reports

SECTION 15-2

15.2. SERVICE DELIVERY SUMMARY

Performance Objective
PRD Para
Performance Threshold
15.2.1. Current Base General Plan and Component Plans
15.1.2.1.1.-15.1.2.1.2.

15.1.2.1.4.

99% of the Base General Plan and Component Plans information is current and accurate. 100% of plans are reviewed annually and updated as changes occur

15.2.2. Well managed facility siting process
15.1.2.1.3.
95% of all new facility sitings are correctly identified, properly coordinated and approved. 100% of new sitings are processed within 90 days.
15.2.3. Well managed airfield and airspace waiver process and Air Installation Compatible Use Zone (AICUZ) program
15.1.2.1.5.-15.1.2.1.7.
100% of all waivers, evaluations, and updates are processed within applicable timelines and IAW governing publications
15.2.4. Well managed facilities project program
15.1.2.2
98% of all projects are programmed in accordance with the base plans and the base design priority list, and are accurately documented
15.2.5. Complete and accurate project programming
15.1.2.2
PA is +/- 20% (average per FY) of actual award amount, indicating properly refined, identified, and validated project scopes and accurate programming cost estimates
15.2.6. Effective project management program
15.1.2.3.2.

98% of all programmed projects have comprehensive and complete requirements documents, accurate cost estimates, proper coordination, and meet all programming timelines

15.2.7. Well managed project design program
15.1.2.4.3., 15.1.2.4.5., 15.1.2.4.8., 15.1.2.4.11.
98% of all project designs comply with all applicable code, regulations and safety standards; are complete, thorough, well documented, and at the appropriate level of detail; correctly modified with full documentation of all changes; and documentation maintained for the required period of time
15.2.8. Effective technical assistance and evaluations for base customers
15.1.2.5.1.-15.1.2.5.4.
Customer satisfaction rating of 3 (out of 5) or higher indicating appropriate assistance to base customers through studies, cost estimates, and technical evaluations
15.2.9. Properly developed and maintained Air Force mandated databases (IWIMS, ACES, GEOBASE etc…)
15.1.1., 15.1.2.1.11., 15.1.2.3.6., 15.1.2.7.7., 15.1.2.8.3., 15.1.2.9.1.
99% of data is accurate and current
15.2.10. Informed and satisfied project customers
15.1.2.3.7., 15.1.2.4.6.
Customer satisfaction survey rating of 3 (on a scale of 1 – 5) or greater over six month period indicating customer’s needs are met and that all parties are kept abreast of project status.
15.2.11. Properly maintained final project products
15.1.2.4
100% of final project products are kept in electronic and hard copy format; drawings/maps maintained indefinitely; documentation maintained for five years minimum, then archived.
15.2.12. Updated master facilities plans and infrastructure maps
15.1.2.6.
98% of facility drawings and infrastructure maps reviewed are accurately updated, based on proper receipt, review, distribution and recording of “as-built” construction drawings within 90 days after the construction.
15.2.13. Thoroughly inspected construction activities
15.1.2.7.2.-15.1.2.7.5. 15.1.2.7.10.15.1.2.7.15.
98 % of projects reviewed indicate compliance with all design and contract requirements, building codes, regulatory laws, and safety standards, with appropriate action taken to correct identified deficiencies
15.2.14. Fully documented inspections of construction activities
15.1.2.7.6.

15.1.2.7.7. 15.1.2.7.15.

95 % of projects reviewed indicate comprehensive entries in the required construction inspection record, and documentation of each visit kept with each project folder

15.2.15. Complete project close-out
15.1.2.7.12., 15.1.2.7.13., 15.1.2.7.16.
100% of close-out documentation and acceptance forms completed and provided to all appropriate offices, including: all O&M manuals (received, reviewed, and distributed), all required documentation provided to base contracting, and all close-out documentation kept with each project folder.
15.2.16. Comprehensive warranty program
15.1.2.8.1.-15.1.2.8.5.
100% of required warranties are distributed to appropriate personnel and properly recorded to ensure none are voided and each is properly executed if necessary.
15.2.17. Properly managed and maintained Maxwell GeoBase and GIS programs
15.1.2.9.1-15.1.2.9.7.
98% of data is accurate and IAW the MAFB Strategic Plan. Technical support on GeoBase/GIS, including GeoBase maps and surveys, is provided to base organizations and customers.

SECTION 15-3

15.3.1. GENERAL INFORMATION

15.3.1.1. GOVERNMENT-FURNISHED PROPERTY (GFP): See PWS, Section 2.3.2. and appendices F through FF.

15.3.1.2. GOVERNMENT PROVIDED SERVICES: See PWS, Section 2.3.3.

APPENDIX 15A

15A.1. PUBLICATIONS

“M” = Mandatory, “A”= Advisory, “E” = Exempt

Number
Date
Title
M or A
Applicable Paragraphs
Maxwell Air Force Base, General Plan
M
All
AETC, Guide to Installation Excellence
M
All
Maxwell Air Force Base, Installation Design Guide
M
All
Air Force Facility Investment Metric, Implementation and Operation Guide
M
All
ADAAG
1 Jan 1998
Americans with Disabilities Act Accessibility Guidelines
M
All.
AFCEE Design Guide
July 1997
Installation Force Protection Guide
AFCEE Project Manager Guide for Design and Construction
26 Oct 1995
Preparation Requirements and Management Plan (RAMP) Packages for Military Construction (MILCON) Program Projects
A
AFCEE Temporary Lodging Facility Design Guide
4 Jun 1986
Lodging Facility Design Guide
A
AFCESA Technical Data Bulletin
November 1996
AFCESA Technical Data Bulletin, Photovoltaic Concept, Design, and Application
A
AF Form 3000
Sep 1991
Material Approval Submittal
M
All
AF Form 3065
1 Apr 1996
Contract Progress Report
M
All
AF Form 813
1 Sep 1999
Request for Environmental Impact Analysis
M
All
AFH 32-1084
1 Sept 1996
Facility Requirements
M
All
AFI 32-1021
24 Jan 2003
Planning And Programming Military Construction (MILCON) Projects
M
All paragraphs are applicable in conducting installation and facilities activities according to applicable laws, regulations, and Federal policies, except for the following: paragraph 1.3.4 and subparagraphs are not applicable because there is not a National Guard on base. Para 1.3.8.4 is not applicable - applies to a foreign country. Para 3.4.1 is not applicable because there are no international treaties or agreements involved.
AFI 32-1022
29 Jun 1994
Planning and Programming Nonappropriated Fund Facility Construction Projects
M
All paragraphs are applicable in conducting installations and facilities activities according to applicable laws, regulations, and Federal policies, except the following: para 1.3.7, and subparagraphs are not applicable because Maxwell is an active Air Force facility.
AFI 32-1023
19 Jul 1994
Design and Construction Standards and Execution of Facility Construction Projects
M
Implements AFPD 32-10, MIL HNBK 1190 and MIL HNBK 1008. Chp 1 para 1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8, 1.9, 1.10, 1.11, 1.12, 1.14; Chp 2 para 2.1.1, 2.1.2, 2.2.1, 2.2.2; Chp 4 para 4.1.1, 4.2.1, 4.2.2, 4.2.3; Chp 5 para 5.2, 5.3, 5.4, 5.6.4, 5.8.1, 5.8.2, 5.9.1.1, 5.9.1.3, 5.9.1.4, 5.9.1.5, 5.9.1.6, 5.10, 5.11, 5.14.1, 5.15, 5.16, 5.22; Chp 6 para 6.13, Chp 7 para 7.1, 7.2, 7.4, 7.10
AFI 32-1024
31 May 1994
Standard Facility Requirements
A
Para 3, 5, and 6, attachment 1 para A1.2, A1.6, A1.7, A1.8, A1.9, and attachment 2
AFI 32-1026
24 Aug 1998
Planning and Design of Airfields
M
Para 1,2,3,4,5.4,6
AFI 32-1032
15 Oct 2003
Planning And Programming Appropriated Funded Maintenance, Repair, And Construction Projects
M
All paragraphs are applicable in conducting installations and facilities activities according to applicable laws, regulations, and Federal policies, except the following: Para 1.2 outlines responsibilities of Installation commander. Para 4.3 and subparagraphs are not applicable because there is no National Guard activity on base. All other paragraphs are applicable in conducting installation and facilities activities according to applicable laws, regulations, and Federal policies.
AFI 32-1043
4 Apr 2003
Planning Guide for Installation of Ultra-High-Molecular-Weight (UHMW) Polyethylene Panels Under Aircraft Arresting System Cables (CONUS Installations)
M
Para 4, 5
AFI 32-1064
17 May 2005
Electrical Safe Practices
M
All
AFI 32-1068
1 Oct 1998
Heating Systems And Unfired Pressure Vessels
A
AFI 32-6001
23 Jan 2002
Family Housing Management
A
AFI 32-6002
27 May 1997
Family Housing Planning, Programming, Design, and Construction
A
AFI 32-6003
17 Aug 2004
General Officer Quarters
AFI 32-7060
25 Mar 1994
Interagency and Intergovernmental Coordination for Environmental Planning
M
All. Guidance on Executive Order implementation
AFI 32-7061
12 Mar 2003
The Environmental Impact Analysis Process
M
All
AFI 32-7062
1 Oct 1997
Air Force Comprehensive Planning
M
All
AFI 32-7063
13 Sep 2005
Air Installation Compatible Use Zone Program
M
All
AFI 32-9005
30 Sep 1994
Real Property Accountability And Reporting
M
All
AFJMAN 32-1058
30 Oct 1992
Masonry Structural Design for Buildings
A
AFJMAN 32-1071, Vol. 1
1 May 1994
Security Engineering Project Development
A
AFJMAN 32-1071, Vol. 2
1 May 1994
Security Engineering Concept Design
A
AFJMAN 32-1071, Vol. 3
1 May 1994
Security Engineering Final Design
A
AFJMAN 32-1089
1 Aug 1996
Air Force Military Construction and Family Housing Economic Analysis Guide
A
AFJMAN 32-10110
1 Dec 1991
Structural Design Criteria for Structures Other Than Buildings
A
All

AFJMAN 32-1013 Vol. 1

Airfield and Heliport Planning Criteria
A

AFJMAN 32-10116

Raised Floor Systems
A
AFJMAN 32-8008, Volume 1
1 Mar 1994
General Provisions for Airfield/Heliport Pavement Design
M
All
AFM 32-10138
1 Jan 1998
Military Construction Planning and Programming Manual
A
AFM 32-1123
1 May 1999
Airfield and Heliport Planning and Design
M
All
AFMAN 32-1013 Vol. 2
1 Nov 1997
Planning Criteria and Wavers for Air Field Support Facilities
A
AFMAN 32-1094
1 Nov 1998
Criteria for Air Force Precision Measurement Equipment Laboratory Design and Construction
A
AFPAM 32-1005
1 Oct 1999
Working In The Engineering Flight
M
All
AFPD 32-10
27 Mar 1995
Installations and Facilities
M
All
AFPD 32-60
16 Sep 2005

Housing

CTL 88-2

DD Form 1354 Checklist
M
All
DD Form 1391
1 Jul 1999
Military Construction Project Data
M
See AFI 32-1021, para 6.8.1, and AFI 32-1021, para 3.8.1 and 32-1032. Atch 2
DD Form 1391C
1 Jul 1999
FY 19__ Military Construction Project - Project Data
M
See AFI 32-1021, para 6.8.1, and AFI 32-1021, para 3.8.1 and 32-1032. Atch 2
42 U.S.C. 4151
1990
Americans with Disabilities Act
M
EO 11593
13 May 1971
Protection and Enhancement of the Cultural Environment
M
All
EO 12088
13 Oct 1978
Federal Compliance with Pollution Control Standards
M
All
EO 12902
8 Mar 1994
Energy Efficiency and Water Conservation at Federal Facilities
M
All
EO 13101
14 Sep 1998
Waste Prevention, Recycling and Federal Acquisition
M
All
ETL 00-1
5 Jan 2000
EPA Guideline Items in Construction and Other Civil Engineering Specifications
M
Para 4
ETL 01-1
11 Apr 2000
Reliability & Maintainability (R&M) Design Checklist
A
ETL 01-18
24 Oct 2001
Fire Protection Engineering Criteria-Electronic Equipment Installations
M
Para 2
ETL 02-9
15 May 2002
Construction Signs
M
All
ETL 02-12
27 Jun 2002
Communications and Information System

Criteria for Air Force Facilities

M

ETL 02-15
3 Dec 2002
Fire Protection Engineering Criteria - New Aircraft Facilities
M
Para 2, 4
ETL 03-2
13 Jul 1993
Dormitory Criteria for Humid Areas
M
Para 3,4
ETL 03-3
16 Apr 2003
Air Force Carpet Standard
M
Para 4
ETL 04-2
19 Jul 04
Standard Airfield Pavement Marking Schemes
M
Para 5
ETL 04-3
6 Apr 2004
Design Criteria for Prevention of Mold in Air Force Facilities
M
All
ETL 04-10
12 May 2004
Determining the Need for Runway Rubber Removal
ETL 04-15
30 Sep 2004
Electrical Safety Guidance
M
ETL 83-1
22 Jul 1987
Design of Control Systems for HVAC Change No. 1 to ETL 83-1, U.S. Air Force Standardized Heating, Ventilating & Air Conditioning (HVAC) Control Systems
A
ETL 86-5
22 May 1986
Fuels Use Criteria for Air Force Construction
A
ETL 86-8
4 Jun 1986
Aqueous Film Forming Foam Waste Discharge Retention and Disposal
M
Para 4
ETL 89-2
23 May 1989
Standard Guidelines for Submission of Facility Operating and Maintenance Manuals
A
ETL 89-7
29 Sep 1989
Design of Air Force Courtrooms
A
ETL 90-1
23 Jan 1990
Built-Up Roof (BUR) Repair/Replacement Guide Specification
M
Para 4
ETL 90-5
26 Jul 1990
Fuel and Lube Oil Bulk Storage Capacity for Emergency Generators
M
Para 4
ETL 90-6
3 Oct 1990
Electrical System Grounding, Static Grounding and Lightning Protection
M
Para 2
ETL 90-8
17 Oct 1990
Guide Specifications for Ethylene Propylene Diene Monomer (EPDM) Roofing
M
Para 4
ETL 90-10
17 Oct 1990
Commissioning of Heating, Ventilating, and Air Conditioning (HVAC) Systems Guide Specification
M
Para 4
ETL 91-1
2 Jan 1991
Fire Protection Engineering Criteria Testing Halon Fire Suppression Systems
M
Para 2,5
ETL 91-2
4 Mar 1991
High Altitude Electromagnetic Pulse (HEMP) Hardening in Facilities
M
Para 2
ETL 91-4
14 Jun 1991
Site Selection Criteria for Fire Protection Training Areas
M
Para 2
ETL 94-6
5 Dec 1994
Fire Protection Engineering Criteria and Technical Guidance-Removal of Halogenated Agent Fire Suppression Systems
M
Para 4
ETL 94-8
14 Dec 1994
Design in Metric
M
Para 4, 5
ETL 95-1
12 May 1995
Halon 1301 Management Planning Guidance
M
Para 4
ETL 96-2
2 May 1996
Elimination of Liquid Polychlorinated Biphenyls (PCBs) Prioritization Guidance
M
Para 4
ETL 96-3
26 Jun 1996
Typical Statement of Work for Airfield Pavement Condition Survey
A
ETL 96-4
9 Jul 1996
Temporary Joint Sealing Details and Procedures for Pavements
A
ETL 96-5
26 Aug 1996
Hangar Concrete Floor Reflective Coating Criteria
M
Para 2,4, 5
ETL 97-2
28 Jul 1997
Maintenance and Repair of Rigid Airfield Pavement Surfaces, Joints and Cracks
M
Para 4
ETL 97-3
25 Mar 1997
Base Course Proof Rolling Requirements
M
Para 4
ETL 97-4
2 Jun 1997
Expedient Trim Pad Anchoring
A
ETL 97-5
25 Apr 1997
Proportioning Concrete Mixtures with Graded Aggregates for Rigid Airfield Pavements
A
ETL 97-16
25 Nov 1997
Pavement Marking System for Low Temperature Applications
M
Para 4
ETL 97-17
1 Dec 1997
Guide Spec - Paint & Rubber Removal from Roadway and Airfield Pavements
M
Para 4
ETL 97-18
5 Dec 1997
Guide Specification for Airfield and Roadway Marking
M
Para 4
ETL 97-22
5 Dec 1997
Competing Facility Keying Systems
M
Para 3
ETL 98-2
31 Jul 98
Clean Air Act Amendments Requirements for Electric Generators and Power Plants
M
Para 4
ETL 98-4
16 Jan 1998
Building Manager Energy Conservation Handbook
A
ETL 98-8
25 Jun 1998
Fire Protection Engineering Criteria - Existing Aircraft Facilities
M
Para 2, 4
ETL 99-4
9 Nov 1999
Fire Protection Engineering Criteria and Technical Guidance-Emergency Lighting and Marking of Exits
M
Para 4, 5
Fed Std 795
01 Apr 1988
Uniform Federal Accessibility Standards
M
Chapters 1 through 9 including Appendix (note para 4.1.4 (2) has been modified by 1 Jul 96 HQ USAF/CE memo to apply to functional areas within facilities which are exclusively used by able-bodied military personnel)

MAFBI 32-2003

Fire Prevention And Protection
M
All
MILHDBK 1008C
15 Jan 1994
Fire Protection for Facilities Engineering , Design, and Construction
M
All
MILHDBK 1022A
1 Nov 1999
Petroleum Fuel Facilities
A
All
MILHDBK 1028/8A
1 Nov 1991
Design of Pest Management Facilities
A
MILHDBK 1190
1 Sep 1987
Military Handbook Facility Planning and Design Guide
A
NEC
2005
National Electric Code
M
All
NFPA
2005
National Fire Protection Association Codes
M
All

Public Law 74-292

Historic Sites Act
M
All

Public Law 89-754

Demonstration Cities and Metropolitan Development Act
M
All

Public Law 91-190

National Environmental Policy Act (NEPA)
M
All

Public Law 96-95

Archeological Resource Protection Act
M
All

Public Law 101-106

Native American Graves Protection & Repatriation Act
M
All

SSPC

Southern Standard Plumbing Code
M
All

Title 40 CFR

Protection of Environment
M
1500 - 1508, National Environmental Policy Act (NEPA)

UBC

Uniform Building Code
M
All
UFC 2-600-01
30 Jun 2002
Installation Design
A
UFC 3-120-01
6 Feb 2003
Air Force Sign Standards
A
UFC 3-220-08FA
16 Jan 2004
Engineering Use of Geotextiles
A
UFC 3-230-18FA
16 Jan 2004

Pavement Design for Road, Streets and Open Storage Areas, Elastic Layered Method

UFC 3-250-01
16 Jan 2004
Pavement Design for Road, Streets and Open Storage Areas, Elastic Layered Method
UFC 3-250-03
15 May 2001
Flexible Pavement Design for Airfields
A
UFC 3-250-10FA
16 Jan 2004
Pavement Design for Road, Streets and Open Storage Areas, Elastic Layered Method
UFC 3-250-11
16 Jan 2004
Soil Stabilization for Pavements
A
UFC 3-250-17
1 Jul 2003
Soil Stabilization for Pavements
UFC 3-260-02
30 Jun 2001
Flexible Pavement Design for Airfields
A
UFC 3-260-02
30 Jun 2001
Pavement Design for Road, Streets and Open Storage Areas, Elastic Layered Method
A
UFCS 3-270-05
15 Mar 2001
Procedures for Airfield Pavement Condition Index Surveys
M
UFCS 3-270-06
15 Mar 2001
Procedures for Airfield Pavement Condition Index Surveys
M
UFC 3-570-06
3 Jul 1991
Cathodic Protection
M
UFC 3-570-07
3 Jul 1991
Cathodic Protection
M
UFC 3-400-1
5 Jul 2002
Energy Usage Criteria for Facilities in the Military Construction Program
M
Para 2, 3, 4
UFC 3-400-1
5 Jul 2002
Mandatory Energy/Water Performance Standards for Replaced or Modified Equipment
M
Para 4
UFC 3-400-01
5 Jul 2002
Utility Meters in New and Renovated Facilities
M
Para 3
UFC 3-450-01
15 May 2003
Noise and Vibration Control
A

UMC

Uniform Mechanical Code
M
All

APPENDIX 15B

15B.1. WORKLOAD DATA

Work Orders Processed and Reviewed

Quantity
Man-hours/Work Order
1173/year
4
Consulting and Study Activities
Total Man-hours

3100/Year

42nd ABW/CC and 42nd SPTGP/CC Requests Received

Quantity
Man-hours/Request
250/Year
4

Miscellaneous Items

Activity
Quantity
Total Man-hours
Audits
1/Year
40
VIP Visits
4/Year
80
Inspections
Monthly
200
Congressional Inquiries
2/Year
20

Insert Projects

Quantity
Cost
168
$8,817,439

Funded Storm Damage Projects (Mission Impact)

Quantity
Cost
17 (over 3 years)
$2,724,225

End-of-Year Projects

Quantity
Cost
FY03
134
$16,352,227
FY04
130
$19,378,682
FY05
109
$17,500,198

Legal Claims Processed

Quantity
Man-hours/Claim
0
0

HQ Taskings Processed

Quantity
Man-hours/Tasking
20/Year
55

Freedom of Information Act (FOIA) Requests Processed

Quantity
Man-hours/FIOA

Crash Responses

Quantity
Man-hours/Event
1
10

Drafting/Surveying Support

Man-hours/year

Meeting Attendance and Preparation

Quantity
Man-hours/Meeting
225/Year
8

Suggestions, Hazard Reports, Reports of Surveys, Quality Line Inquiries

Processed and Reviewed

Activity
Quantity
Man-hours/Event
Suggestions
1
20
Hazard Reports
5
4
Report of Surveys
0
Quality Line Requests
0

Complexity Index

Number Of Projects
Total Cost
Minimum

Moderate

Extensive

FY03 Design Projects

< $25 K
139
$1,233,491
108
29
2
$25K - $100K
63
$3,400,026
20
38
5
$100K 0 $500K
39
$9,699,171
4
28
7
>$500K
8
$7,897,681
0
2
6
MILCON
-
-
-
-
-
HOUSING
20
$1,994,124
10
3
7
TOTALS
269
$24,224,493
142
100
27

FY04 Design Projects

< $25 K
130
$945,117
94
34
2
$25K - $100K
59
$3,287,963
12
44
3
$100K - $500K
46
$10,873,150
10
24
12
>$500K
17
$25,390,700
0
3
14
MILCON
-
-
-
-
-
HOUSING
14
$1,405,500
5
5
4
TOTALS
266
$41,902,430
121
110
35

FY05 Design Projects

< $25 K
88
$977,017
49
33
6
$25K - $100K
58
$3,138,367
28
23
7
$100K 0 $500K
50
$13,508,445
17
24
9
>$500K
17
$25,978,029
0
2
15
MILCON
-
-
-
-
-
HOUSING
18
$4,406,389
8
7
3
TOTALS
231
$48,008,247
102
89
40

Complexity Index

Number Of Projects
Total Cost
Minimum

Moderate

Extensive

FY03 Constr. Projects

< $25 K
144
$1,277,995
112
28
4
$25K - $100K
57
$2,853,482
19
34
4
$100K 0 $500K
42
$10,536,466
6
27
9
>$500K
6
$6,461,644
0
1
5
MILCON
-
-
-
-
-
HOUSING
17
$1,622,217
9
2
6
TOTALS
266
$22,751,804
146
92
28

FY04 Constr. Projects

< $25 K
157
$1,100,044
121
35
1
$25K - $100K
53
$3,009,468
7
42
4
$100K 0 $500K
34
$8,473,672
5
19
10
>$500K
6
$10,961,208
0
1
5
MILCON
-
-
-
-
-
HOUSING
15
$1,202,918
4
7
4
TOTALS
265
$24,747,310
137
104
24

FY05 Constr. Projects

< $25 K
87
$856,703
54
29
4
$25K - $100K
56
$2,791,078
23
25
8
$100K 0 $500K
45
$10,162,774
17
19
9
>$500K
8
$9,285,930
0
0
8
MILCON
-
-
-
-
-
HOUSING
16
$875,656
8
5
3
TOTALS
212
$23,972,141
102
78
32

15B.1.1. The future Design and Construction workload is projected to be no greater than the average of the historical workload data provided in this technical exhibit. Other miscellaneous historical data is provided as an annual average.

15B1.2. Legend:

*These projects require simplified statements of work, abbreviated specifications and drawings, and itemized cost estimates. During construction they require minimal inspection and documentation. Work would typically include such projects as; built-up roof repair/replacement, small office renovation, overlay of roadways, etc.

** These projects require expanded statements of work, expanded specifications and drawings, and itemized cost estimates. During construction they require frequent inspection, construction diaries and moderate scheduling attention. Work would typically include significant building additions, large system replacements, moderate interior renovations, etc.

*** These projects require extensive multi-discipline design involving detailed statements of work, specifications, drawings, and itemized cost estimates adequate for advertising and competitive bidding. During construction they require daily inspection, detailed construction diaries, schedule tracking, and extensive coordination. Projects of this type would usually include major renovations involving all systems, and site work.

APPENDIX 15C

15C.1. MAPS AND WORKAREA LAYOUT

Work areas for this service area are all work areas affiliated with those line items (with the exception of Holtville Gwen Radar Site and Halon systems) in the Real Property Records in the Technical Library. This includes one radar site; and Lakes Martin, Jordan and Pippin.

APPENDIX 15D

15D.1. REQUIRED REPORTS

Report Title
Description/Form
Submit To:
Date Due
Directive
Air Force Facility Investment Metric (FIM)
Priority listing of O&M projects based on mission category classification and three-tier priority rating system. Package includes PCMS database report with follow-up hardcopy signed and approved by Installation Commander, and project documentation
HQ AETC
Annually
HQ SAF/ILE Guide Publication, Aug 97
General Plan, Base Map Update, and GOB
Identifies future Base planning requirements
HQ AETC
Every Two Years
HQ AETC "Call Letter"

Sustainment, Restoration, and Modernization (SRM)

HQ AETC
Annually
HQ AETC "Call Letter"
O&M Project Priority List
Priority listing of base O&M projects
HQ AETC
3 times annually
HQ AETC "Call Letter"
Non-Appropriated Funds Projects Call
Priority listing of NAF projects and project documentation
HQ AETC
Annually
HQ AETC "Call Letter"
Military Construction (MILCON) Program Call
Priority listing of MILCON projects and project documentation
HQ AETC
2 times annually
HQ AETC "Call Letter"
Demolition Report
5-year listing by fiscal year of faculties to be demolished
HQ AETC
Quarterly
HQ AETC "Call Letter"
Military Family Housing (MFH) Programs (Three reports)
5-year listing of P-711 New/Replacement, P-713 Improvement/Renovation, and P-722 Exceed Threshold Repair projects
HQ AETC
Annually
HQ AETC "Call Letter"
AF Dormitory Survey Master Planning Report
Time phasing and facility improvement planning for short, intermediate, and long-range dormitory requirements
HQ AETC
Every three years
HQ AETC "Call Letter"

APPENDIX 15E

15E.1. COLLATERAL TASKS (DUTIES)

Duty
Directive

(None Identified)

APPENDIX 15F

15F.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES – SUPPLIES, MATERIALS, AND LEASED EQUIPMENT

No supplies, materials or leased equipment will be provided.

APPENDIX 15FA

15FA.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES – FACILITIES

Function
Building Number
Room Number
Street Address
Total Sq. Ft.
Base Engineering Administration (Engineering Services)
1060-Maxwell

400 Cannon Street

Maxwell AFB 36112 35,324

APPENDIX 15FB

15FB.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES - EAID

See Appendix 2FB.

APPENDIX 15FC

15FC.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES – NON-EAID

See Appendix 2FC.

APPENDIX 15FD

15FD.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES – COMMON HAND TOOLS AND SPECIAL TOOLS

See Appendix 2FD.

APPENDIX 15FE

15FE.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES – ADPE

See Appendix 2FE.

APPENDIX 15FF

15FF.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES – VEHICLES

See Appendix 25FF.

APPENDIX 15FG

15FG.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES – TRAINING

Course
Location
Type of Training
Approximate Length

(None)

No Government Furnished Training (GFT) provided.

SECTION 15G

15G.1. DEFINITIONS AND ACRONYMS

AAFES – Army and air Force Exchange Service

ACES – Automated Civil Engineering System AETC – Air Education and Training Command

AF – Air Force

AFI – Air Force Instruction

AICUZ – Air Installation Compatible Use Zone

ATCALS – Air Traffic Control and Landing System

ATSEP – Air Traffic Systems Evaluation

CADD – Computer Aided Design and Drafting

CE – Civil Engineering

CIP – Capital Improvements Program

DOD – Department of Defense

DECA – Defense Commissary Agency

DV – Distinguished Visitors

END-OF-YEAR PROJECTS – Projects awarded between 01 June and 30 September

ESPC – Energy Savings Performance Contract

FAR – Federal Acquisition Regulation

FIM – Facility Investment Metrics

FOIA – Freedom of Information Act

FUB – Facility Utilization Board

GEOBASE – Geobase program and data bases

GIS – Geographic Information System

HQ AETC – Headquarters Air Education and Training Command

HVAC – Heating Ventilating Air/Conditioning

IAW – In Accordance With

IICEP – Interagency and Intergovernmental Coordination Program

INSERT PROJECTS – Projects not originally included in the facilities project programs at the beginning of the year

IWIMS – Interim Work Information and Management System

MAFB – Maxwell Air Force Base

MAJCOM – Major Command

MFH – Military Family Housing

MILCON – Military Construction Program

MOA – Memorandum of Agreements

MOU – Memorandum of Understanding

NAF – Non-Appropriated Funds

O&M – Operations and Maintenance

PCMS – Project by Contract Management System

PDC – Programming, Design and Construction

PMF – Performance Management Flight

RTA – Ready To Advertise

TERPS – Terminal Instrument Procedures

WORCH – Work Order Request Clearing House

APPENDIX 15H

15H.1. OPERATIONS PLANS AND SUPPORT AGREEMENTS

See Appendix 2H.

APPENDIX 15I

15I.1. SPECIAL TRAINING, CERTIFICATION, OR LICENSING REQUIREMENTS

Special Training, Certification, or Licensing Requirement
At Least
Special Training, Certification, or Licensed by
Required by (Statute or Instruction)

None

MAXWELL-GUNTER AFB

ENGINEERING SERVICES

15-4-8

File details come from the government source that posted it. Updated .