This is a Statement of Work for static display refinishing services for the Air National Guard Readiness Center (ANGRC) located at Joint Base Andrews, Maryland. The project number is ANGR 26 3123, dated 22 May 2026, and is issued by the Air National Guard Readiness Center under the National Guard Bureau.

The contract scope includes restoration of two historical military aircraft—an F-4 Phantom II (base requirement) and an F-100 Super Sabre (option line item)—along with their respective display stands. The contractor must provide all labor, materials, tools, and equipment to restore the aircraft to museum-level standards. Specific tasks include structural inspection authorization, surface preparation and corrosion control (sanding and scuffing without removing all paint layers), drainage maintenance (ensuring all water drain holes remain clear), high-quality aerospace polyurethane coating application with historically accurate markings and stencils, display stand restoration, and site protection and restoration using ground mats and tarps with subsequent turf restoration. Environmental coordination with Joint Base Andrews Environmental Management Office and Bioenvironmental Engineering Flight is required prior to polyurethane application. The contractor must submit a Site-Specific Safety Plan, AF Form 66 Material Submittals, and provide a minimum one-year workmanship warranty covering peeling, flaking, and coating failures. Work shall be performed outdoors at Joint Base Andrews, Maryland, during business hours (0630–1630, Monday–Friday, excluding federal holidays), with compliance required for AFI 84-103, NFPA 101, EPA/OSHA standards, and base environmental regulations. The Government will provide site access, electrical power, and structural inspection services but will not furnish tools, materials, or equipment. Period of performance will be determined at award and is contingent on suitable weather conditions for outdoor polyurethane application.

View the file

Other files

File Type Posted
IMG_3622.jpeg JPEG file
IMG_3623.jpeg JPEG file
IMG_3621.jpeg JPEG file
IMG_3627.jpeg JPEG file
IMG_3624.jpeg JPEG file
IMG_3625.jpeg JPEG file
FA286026QA004 AMENDMENT 1_ANGRC Static Display Refinishing_20260923.pdf PDF
IMG_3619.jpeg JPEG file
IMG_3618.jpeg JPEG file
IMG_3612.jpeg JPEG file
IMG_3616.jpeg JPEG file
Attachment 2 - Wage Determination 15-4281.txt TXT text file
IMG_3614.jpeg JPEG file
IMG_3620.jpeg JPEG file
IMG_3630.jpeg JPEG file
IMG_3626.jpeg JPEG file
IMG_3629.jpeg JPEG file
IMG_3615.jpeg JPEG file
IMG_3613.jpeg JPEG file
IMG_3628.jpeg JPEG file
IMG_3617.jpeg JPEG file
FA286026QA004_ANGRC Static Display Refinishing_20260911.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Static Display Refinishing (F-4 Phantom II & F-100 Super Sabre), ANGRC

PROJECT No: ANGR 26 3123 22 May 2026

AIR NATIONAL GUARD READINESS CENTER

NATIONAL GUARD BUREAU

1. Background

The Air National Guard Readiness Center (ANGRC) campus on Joint Base Andrews maintains two historical military aircraft, an F-4 Phantom II and an F-100 Super Sabre, as outdoor static displays. These heritage assets serve to honor military history, foster esprit de corps, and enhance the visual aesthetic of the campus. Due to prolonged exposure to environmental elements, both aircraft have experienced significant exterior degradation, including coating failure, active corrosion, and deterioration of structural seals.

2. Objective

The objective of this contract is to provide all labor, materials, tools, and equipment necessary to prepare, repair, and refinish the static display heritage aircraft and their respective display stands. The Contractor shall restore the visual quality of the static displays to a museum-level standard.

3. Scope

To accommodate fiscal parameters, the requirement is structured with a Base Line Item for the F-4 Phantom II and an Option Line Item for the F-100 Super Sabre.

• Base Requirement: Refinishing of the F-4 Phantom II and its display stand.

• Option 1: Refinishing of the F-100 Super Sabre and its display stand.

For each awarded aircraft, the Contractor shall perform surface preparation, localized corrosion control, drainage maintenance, coating application, display stand restoration, and site restoration.

4. Specific Tasks

4.1 Structural Inspection & Authorization to Proceed

The aircraft mounts have not been structurally assessed in approximately 10 years.

Prior to the Contractor commencing any work, a Government-appointed Subject Matter Expert (SME) from the Civil Engineering Squadron (CES) and/or Maintenance Squadron (MXS) will inspect the supports. The Contractor shall not commence physical work on the aircraft until written approval to proceed is provided by the Contracting Officer’s Representative (COR).

4.2 Surface Preparation & Corrosion Control

The Contractor shall sand and scuff the exterior surfaces to prepare them for coating.

The Contractor shall not remove all existing layers of paint down to bare metal. The Contractor shall smooth the surface, remove flaking paint, and reveal areas of significant active corrosion. Original coatings shall be maintained and seamlessly feathered. The Contractor shall address, neutralize, and repair localized active corrosion prior to applying primer or topcoats.

4.3 Drainage Maintenance

The Contractor shall inspect and clean all engineered water drain holes on the underside of the airframe. All aircraft drain holes shall remain completely clear and unblocked by new paint, sealant, or protective coatings to ensure proper internal water drainage.

4.4 Coating Application

The Contractor shall apply high-quality aerospace polyurethane topcoats to restore the visual quality of the static display. Paint schemes, markings, and stencils shall exactly match the historically accurate configuration currently on the aircraft.

4.5 Display Stand Restoration

The Contractor shall sand, prep, and refinish the aircraft display stands to restore them to a durable, weather-resistant, glossy appearance matching their original aesthetic.

4.6 Site Protection & Restoration

In accordance with AFI 84-103, the Contractor shall utilize heavy-duty ground protection mats for heavy equipment to prevent rutting. The Contractor shall utilize ground tarps to catch all paint scrapings, dust, and overspray. Upon completion, the Contractor shall remove all equipment and restore the surrounding turf to its original or better condition (including, but not limited to, filling ruts and applying seed/straw or sod).

4.7 Environmental & Outdoor Polyurethane Exemption

The application of polyurethane coatings will be performed outdoors. The Contractor shall coordinate with the Joint Base Andrews Environmental Management Office (EMO) and Bioenvironmental Engineering Flight (BEF) prior to spraying to secure final approval under the Special Projects clause for infrequent maintenance. The Contractor shall establish appropriate environmental containment (e.g., drop cloths, wind screens).

5. Submittals & Deliverables

The Contractor shall submit the following deliverables to the KO and COR:

Deliverable Description / Requirement Schedule

Site-Specific Safety Plan (SSSP)

Comprehensive safety plan outlining hazard mitigation, PPE, and containment procedures.

10 days post-award, prior to start of work.

AF Form 66 (Material Submittals)

AF Form 66 Schedule of Material Submittals for all coatings, primers, and chemicals.

10 days post-award, prior to start of work.

Workmanship Warranty

A minimum 1-year workmanship warranty covering peeling, flaking, and coating failures.

At final inspection/project closeout.

6. Government-Furnished Property & Services

The Government will provide access to the static display sites, access to electrical power, and will conduct the structural inspection of the aircraft mounts. The Government will not provide tools, materials, or equipment.

7. Applicable Publications & Standards

The Contractor shall comply with all applicable regulations, including but not limited to:

• AFI 84-103, DAF Heritage Program

• NFPA 101, Life Safety Code

• EPA and OSHA Standards for Hazardous Material Handling

• Joint Base Andrews Base Environmental Management Regulations

8. Period of Performance

The Period of Performance shall be determined at the time of award, heavily contingent upon weather conditions suitable for outdoor polyurethane application.

9. Place of Performance

Work shall be performed outdoors at the Air National Guard Readiness Center (ANGRC) campus on Joint Base Andrews, MD.

10. Security & Work Hours

Work Hours: The Contractor shall perform all work between the hours of 0630 - 1630, Monday through Friday, excluding federal holidays.

Security: The Contractor shall comply with all Joint Base Andrews security and access requirements. Personnel shall obtain required base passes and adhere to all force protection conditions.

11. Quality Assurance, Life-Safety, and Acceptance Criteria

11.1 Life Safety & Egress: The Contractor shall mandate compliance with NFPA 101 (Life Safety Code). The Contractor shall maintain clear emergency egress routes for all adjacent facilities during the entirety of the work.

11.2 Fire Alarm Coordination: The Contractor shall coordinate with the facility manager and Fire Department to bypass adjacent building fire alarms/smoke detectors prior to initiating any dust-producing work (e.g., sanding).

11.3 Hazmat & IAQ Stop-Work Clause: The Contractor shall immediately stop work and notify the KO and COR if suspected Asbestos Containing Material (ACM), Lead-based paint, or Polychlorinated Biphenyls (PCBs) are discovered during surface preparation.

Work shall not resume until cleared by the KO.

11.4 Acceptance Criteria: The Government COR and/or Historian will conduct a final visual inspection. Acceptance will be granted when the aircraft finishes are restored, stencils are historically accurate, drain holes are clear, and the surrounding site/turf is fully restored.

STATEMENT OF WORK
Static Display Refinishing (F-4 Phantom II & F-100 Super Sabre), ANGRC
2. Objective
3. Scope
4. Specific Tasks
4.2 Surface Preparation & Corrosion Control
4.3 Drainage Maintenance
4.4 Coating Application
4.5 Display Stand Restoration
4.6 Site Protection & Restoration
4.7 Environmental & Outdoor Polyurethane Exemption
5. Submittals & Deliverables
6. Government-Furnished Property & Services
7. Applicable Publications & Standards
8. Period of Performance
9. Place of Performance
10. Security & Work Hours
11. Quality Assurance, Life-Safety, and Acceptance Criteria