Contractor Estimate Form

View the file

Other files

File Type Posted
FA2860-15-R-0024-0003.pdf PDF
15-155200_SOW-Amendment__2.doc DOC document
FA2860-15-R-0024-0002.pdf PDF
15-155200_SOW-Amendment__1.doc DOC document
FA2860-15-R-0024-0001.doc DOC document
15-155200_SOW-Spec_Final.doc DOC document
AJXF_15-1552-00_Bldg_3149_Roof_dwg1.pdf PDF
AJXF_15-1552-00_Bldg_3149_Roof_dwg3.pdf PDF
Copy_of_AJXF_15-155200_Bldg_3149_Roof_AFF66.xlsx XLSX spreadsheet
FA2860-15-R-0024.pdf PDF
AJXF_15-1552-00_Bldg_3149_Roof_dwg5.pdf PDF
AJXF_15-1552-00_Bldg_3149_Roof_dwg6.pdf PDF
AJXF_15-1552-00_Bldg_3149_Roof_report_decosted.docx DOCX document
AJXF_15-1552-00_Bldg_3149_Roof_dwg2.pdf PDF
AJXF_15-1552-00_Bldg_3149_Roof_dwg4.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STND 3052 (FRONT)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
SUGGESTED CONTRACTOR ESTIMATE FORM
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
BLDG 3149 Replace roof$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
AJXF 15-1552-00JOINT BASE ANDREWS
UNITMATERIAL COSTLABOR COSTSOTHER
LineITEMOFQUANTITYMANHOURSAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
DEMOLITONLS$0.00$0.00$0.00
Lift equipmentMO0.00$0.00$0.00$0.00$0.00
DumpsterWeek0.00$0.00$0.00$0.00$0.00
Remove gravelSF0.00$0.00$0.00$0.00$0.00$0.00
Remove roofingSF0.00$0.00$0.00$0.00$0.00$0.00
Remove InsulationSF0.00$0.00$0.00$0.00$0.00$0.00
Remove flashingSF0.00$0.00$0.00$0.00$0.00
Haul debrisCY0.00$0.00$0.00$0.00$0.00$0.00
Dump ChargeTON0.00$0.00$0.00$0.00$0.00
NEW WORK$0.00$0.00$0.00
Install new PVC RoofSQ0$0.00$0.00$0.00$0.00$0.00
Install new cover boardSF0$0.00$0.00$0.00$0.00$0.00
Install new flashings,SF0$0.00$0.00$0.00$0.00$0.00
lift truck/craneMO0$0.00$0.00$0.00$0.00$0.00
ForkliftEa0$0.00$0.00$0.00
walk padsSF0$0.00$0.00$0.00$0.00$0.00
SUBTOTAL$0.00
OVERHEAD AND DELAYS (*Input proposed percentage*)$0.00
PROFIT (*Input proposed percentage*)$0.00
BOND (3%)$0.00

TOTAL $0.00

NOTE THAT THIS FORM IS SUGGESTED FOR CONTRACTOR TO PREPARE THEIR QUOTE. CONTRACTOR IS FREE TO MODIFY THIS FORM AS THEY WISH.

&K000000Page &P of &N

STND 3052 (BACK)

TOTAL MATERAL COSTS$0.00
TOTAL LABOR COSTS$0.00
TOTAL OTHER DIRECT COSTS$0.00
TOTAL DIRECT COSTS$0.00
OVERHEADERROR:#VALUE!
SUBTOTALERROR:#VALUE!
PROFITERROR:#VALUE!
TOTAL PRICEERROR:#VALUE!
DATE: 27 OCTOBER 1995FIRM NAME: US GOVERNMENT
TITLE: PROJECT ENGINEERBY:
(Signature)

&"Helv,Bold"&16FOR OFFICIAL USE ONLY