Attachment_3_-_Price_List.xlsx

XLSX spreadsheet 82 KB Posted

Attached to
Protective Coating IDIQ-11CONS Federal contract opportunity
Solicitation number
FA2860-15-R-0022
Issued by
Department of the Air Force Headquarters District Washington

About this file

Section J referenced Attachment 3.

View the file

Other files for this federal contract opportunity

Other files attached to Protective Coating IDIQ-11CONS, newest first.
File Type Posted
FA2860-15-R-0022-_Government_Response_to_Clarifications_Final.docx DOCX document
FA2860-15-R-0022-P01.doc DOC document
Attachment_1_-_SOW_Airfield_ _Pavement_Markings _Rubber_Removal _Protective_Coatings_ _Signs.doc DOC document
Attachment_3_-_Price_List.xlsx XLSX spreadsheet
ETL__97_17_Paint_and_Rubber_Removal.pdf PDF
Attachment_1_-_SOW_Airfield_ _Pavement_Markings _Rubber_Removal _Protective_Coatings_ _Signs.doc DOC document
Attachment_2_-_MD150035_ _MD_150100.docx DOCX document
FA2860-15-R-0022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

BLANK PRICING SCHEDULE
Base YearQtyGovernment Estimated Qty; Info ONLYUnitUnit PriceExtended PriceTOTAL PRICE
CLINDescription
0001INTERIOR PAINT$
GYP. BOARD, PRIMER1200,000SF$$
GYP. BOARD, ONE COAT1200,000SF$$
GYP. BOARD,TWO COAT1150,000SF$$
GYP.BOARD,STAIN SEAL COAT13,000SF$$
CMU,CONC.PRIME125,000SF$$
CMU,CONC.ONE COAT150,000SF$$
CMU, CONC. TWO COAT115,000SF$$
PLASTER, PRIME12,500SF$$
PLASTER, ONE COAT12,500SF$$
PLASTER, TWO COAT15,000SF$$
WOOD, PRIME15,000SF$$
WOOD, ONE COAT17,000SF$$
WOOD. STAIN (3 coats, sand after first)17,000SF$$
METAL, PRIME16,000SF$$
METAL,ONE COAT15,000SF$$
METAL, HIGH TEMPERATURE11,000SF$$
BASEBOARD, ONE COAT15,000SF$$
0002EXTERIOR PAINT$
ABS CEM. PRIME14000SF$$
ABS CEM.,ONE COAT18,000SF$$
ABS CEM.,TWO COAT19,000SF$$
CONC, STUCCO MASONRY, FILLER1100SY$$
CONC, STUCCO ONE COAT11,000SF$$
CONC,STUCCO TWO COAT11,000SF$$
CONC,STUCCO MURATIC ACID WASH11,000SF$$
FERROUS,PRIME15,000SF$$
FERROUS,ONE COAT15,000SF$$
FERROUS, TWO COATS11,000SF$$
ASPHALT COATED STEEL,PRIME15,000SF$$
ASPHALT COATED STEEL, ONE COAT17,500SF$$
ASPHALT COATED STEEL,TWO COAT11,000SF$$
GALV./NON FERROUS, PRIME12,000SF$$
GALV./NON FERROUS, ONE COAT16,000SF$$
GALV./ NON FERROUS, TWO COAT15,000SF$$
ALUMINUM (HANGARS) PRIME130,000SF$$
ALUMINUM (HANGARS) ONE COAT145,000SF$$
ALUMINUM (HANGARS) TWO COAT15,000SF$$
WOOD, PRIME11,500SF$$
WOOD, ONE COAT12,500SF$$
WOOD, TWO COAT12,500SF$$
0003DOORS REFINISH$
DOORS, PRIME1450EA$$
DOORS,ONE COAT1450EA$$
DOORS, TWO COATS1200EA$$
DOORS, THREE COATS1100EA$$
DOORS,STAIN1300EA$$
DOORS, SHELLAC1300EA$$
DOORS,VARNISH 3 COAT SAND AFTER 11300EA$$
0004WINDOWS$
Windows up to 3'x5' include trim&frame
WINDOWS,PRIME1800EA$$
WINDOWS, ONE COAT1300EA$$
WINDOWS, TWO COAT1200EA$$
WINDOWS, THREE COAT1200EA$$
Windows larger than 3'x5' incl. fame&trim
WINDOWS, PRIME1325EA$$
WINDOWS ONE COAT1350EA$$
WINDOWS TWO COAT1200EA$$
WINDOWS THREE COAT1100EA$$
0005TRIM$
TRIM,WOOD UP TO 6" WIDE
TRIM, PRIME18,000LF$$
TRIM ONE COAT12,000LF$$
TRIM, TWO COAT112,000LF$$
TRIM, THREE COAT15,000LF$$
TRIM, WOOD OVER 6" WIDE
TRIM, PRIME1200LF$$
TRIM ONE COAT1200LF$$
TRIM, TWO COAT1200LF$$
TRIM, THREE COAT1200LF$$
0006MISC FLOOR FINISH$
SANDING11,000SF$$
STRIPE FLOORS WOOD/ CONC11,000LF$$
SEAL COAT11,000SF$$
WOOD/PAINT1500SF$$
FINISH1500SF$$
0007CONCRETE FLOORS$
URETHANE15,000SF$$
EPOXY15,000SF$$
ENAMEL15,000SF$$
NON-SKID(ADDITIVE)12,500SF$$

0008 GYP. BOARD REFINISH 1 5,000 SF $ $ $

0009SEALANT/CAULKING$
INTERIOR15,000LF$$
EXTERIOR15,000LF$$

0010 FIRE HYDRANT 1 200 EA $ $ $

0011FENCES$
CHAIN LINK12000SF$$
WOOD PAINT12000SF$$
WOOD STAIN13000SF$$

0012 POOLS, WALLS AND BOTTOM(SSPC 18) 1 6,000 SF $ $ $

0013 WOOD HANDRAILS 1 50 LF $ $ $

0014METAL UTILITY POLES 2 COATS$
< 30' HEIGHT1300LF$$
30'TO 110' HEIGHT1300LF$$
0015WALL COVERING$
INSTALL WALL COVERINGS LIGHTWEIGHT1500SF$$
INSTALL WALL COVERINGS MEDIUMWEIGHT1500SF$$
INSTALL WALL COVERINGS HEAVYWEIGHT1500SF$$
REMOVE WALLCOVERINGS14,000SF$$
0016SANDBLASTING$
NEAR WHITE METAL1200SF$$
COMMERCIAL METAL1200SF$$
CONCRETE1700SF$$
0017MISCELLANEOUS PAVEMENT MARKINGS$
TAPE ARROW1100SF$$
PAINT ARROW1500SF$$
TAPE 12" STOP LINES1100SF$$
PAINT 12" STOP LINES1500SF$$
TAPE 12" X WALKS12,400LF$$
PAINTED LETTERS UP TO 8"1225LF$$
HANDICAP SYMBOLS UP TO 36"1225LF$$
PARKING LOT LINES 6"160,000LF$$
TAPE SYMBOLS STOP/SCHOOL 36"11,000LF$$
LAYOUT PARKING LOT 3"130,000LF$$
LAYOUT X WALK11,000LF$$
LAYOUT LETTERS UP TO 8"120,000LF$$
0018AIRFIELD MARKINGS$
WHITE REFLECTIVE,TYPE 11310,000LF$$
YELLOW REFLECTIVE TYPE 11225,000LF$$
YELLOW NON-REFLECTIVE135,000LF$$
RED RELECTIVE,TYPE 1150,000LF$$
RED, NON REFLECTIVE150,000LF$$
WHITE REFLECTIVE,TYPE 311,000LF$$
YELLOW REFLECTIVE TYPE 311,000LF$$
RED RELECTIVE,TYPE 311,000LF$$

0019 RUBBER REMOVAL 1 180,000 SF $ $ $

0020 WATERBLASTING (COMMERCIAL) 1 10,500 SF $ $ $

0021ROAD/STREET MARKINGS$
WHITE REFLECTIVE TYPE 11140,000SF$$
YELLOW REFLECTIVE TYPE 1114,000SF$$
0022SIGNAGE$
FABRICATE SIGNS1400,000SI$$
INSTALL SIGNAGE(Poles,Bldgs, Curbs, etc)1500EA$$
INSTALL FRAMES AND SIGNS135EA$$
FABRICATE FRAMES(2" Alum Tubing)1430LF$$
FABRICATE FRAMES(3" Alum Tubing)1630LF$$
SIGN MAINTENANCE1200EA$$
PAINT SIGNS,BANNERS, LOGOS ETC14000SF$$
FABRICATE INSTALL POLES AND CAPS(3"X3"ALUM)135EA$$
FABRICATE INSTALL POLESAND CAPS(2"X2"ALUM)135EA$$
FABRICATE/INSTALL TEMP STANCTION160EA$$
TOTAL$
*Unit prices shall be inclusive of all costs (mobilization, overhead, profit, bond cost, etc) associated with the items of work shown.

Option Year 1

BLANK PRICING SCHEDULE
Option Yr 1QtyGovernment Estimated Qty; Info ONLYUnit PriceExtended PriceTOTAL PRICE
CLINDescription
1001INTERIOR PAINT$
GYP. BOARD, PRIMER1200,000$$
GYP. BOARD, ONE COAT1200,000$$
GYP. BOARD,TWO COAT1150,000$$
GYP.BOARD,STAIN SEAL COAT13,000$$
CMU,CONC.PRIME125,000$$
CMU,CONC.ONE COAT150,000$$
CMU, CONC. TWO COAT115,000$$
PLASTER, PRIME12,500$$
PLASTER, ONE COAT12,500$$
PLASTER, TWO COAT15,000$$
WOOD, PRIME15,000$$
WOOD, ONE COAT17,000$$
WOOD. STAIN (3 coats, sand after first)17,000$$
METAL, PRIME16,000$$
METAL,ONE COAT15,000$$
METAL, HIGH TEMPERATURE11,000$$
BASEBOARD, ONE COAT15,000$$
1002EXTERIOR PAINT$
ABS CEM. PRIME14000$$
ABS CEM.,ONE COAT18,000$$
ABS CEM.,TWO COAT19,000$$
CONC, STUCCO MASONRY, FILLER1100$$
CONC, STUCCO ONE COAT11,000$$
CONC,STUCCO TWO COAT11,000$$
CONC,STUCCO MURATIC ACID WASH11,000$$
FERROUS,PRIME15,000$$
FERROUS,ONE COAT15,000$$
FERROUS, TWO COATS11,000$$
ASPHALT COATED STEEL,PRIME15,000$$
ASPHALT COATED STEEL, ONE COAT17,500$$
ASPHALT COATED STEEL,TWO COAT11,000$$
GALV./NON FERROUS, PRIME12,000$$
GALV./NON FERROUS, ONE COAT16,000$$
GALV./ NON FERROUS, TWO COAT15,000$$
ALUMINUM (HANGARS) PRIME130,000$$
ALUMINUM (HANGARS) ONE COAT145,000$$
ALUMINUM (HANGARS) TWO COAT15,000$$
WOOD, PRIME11,500$$
WOOD, ONE COAT12,500$$
WOOD, TWO COAT12,500$$
1003DOORS REFINISH$
DOORS, PRIME1450$$
DOORS,ONE COAT1450$$
DOORS, TWO COATS1200$$
DOORS, THREE COATS1100$$
DOORS,STAIN1300$$
DOORS, SHELLAC1300$$
DOORS,VARNISH 3 COAT SAND AFTER 11300$$
1004WINDOWS$
Windows up to 3'x5' include trim&frame
WINDOWS,PRIME1800$$
WINDOWS, ONE COAT1300$$
WINDOWS, TWO COAT1200$$
WINDOWS, THREE COAT1200$$
Windows larger than 3'x5' incl. fame&trim
WINDOWS, PRIME1325$$
WINDOWS ONE COAT1350$$
WINDOWS TWO COAT1200$$
WINDOWS THREE COAT1100$$
1005TRIM$
TRIM,WOOD UP TO 6" WIDE
TRIM, PRIME18,000$$
TRIM ONE COAT12,000$$
TRIM, TWO COAT112,000$$
TRIM, THREE COAT1500$$
TRIM, WOOD OVER 6" WIDE
TRIM, PRIME1200$$
TRIM ONE COAT1200$$
TRIM, TWO COAT1200$$
TRIM, THREE COAT1200$$
1006MISC FLOOR FINISH$
SANDING11,000$$
STRIPE FLOORS WOOD/ CONC11,000$$
SEAL COAT11,000$$
WOOD/PAINT1500$$
FINISH1500$$
1007CONCRETE FLOORS$
URETHANE15,000$$
EPOXY15,000$$
ENAMEL15,000$$
NON-SKID(ADDITIVE)12,500$$

1008 GYP. BOARD REFINISH 1 5,000 $ $ $

1009SEALANT/CAULKING$
INTERIOR15,000$$
EXTERIOR15,000$$

1010 FIRE HYDRANT 1 200 $ $ $

1011FENCES$
CHAIN LINK12000$$
WOOD PAINT12000$$
WOOD STAIN13000$$

1012 POOLS, WALLS AND BOTTOM(SSPC 18) 1 6,000 $ $ $

1013 WOOD HANDRAILS 1 50 $ $ $

1014METAL UTILITY POLES 2 COATS$
< 30' HEIGHT1300$$
30'TO 110' HEIGHT1300$$
1015WALL COVERING$
INSTALL WALL COVERINGS LIGHTWEIGHT1500$$
INSTALL WALL COVERINGS MEDIUMWEIGHT1500$$
INSTALL WALL COVERINGS HEAVYWEIGHT1500$$
REMOVE WALLCOVERINGS14,000$$
1016SANDBLASTING$
NEAR WHITE METAL1200$$
COMMERCIAL METAL1200$$
CONCRETE1700$$
1017MISCELLANEOUS PAVEMENT MARKINGS$
TAPE ARROW1100$$
PAINT ARROW1500$$
TAPE 12" STOP LINES1100$$
PAINT 12" STOP LINES1500$$
TAPE 12" X WALKS12,400$$
PAINTED LETTERS UP TO 8"1225$$
HANDICAP SYMBOLS UP TO 36"1225$$
PARKING LOT LINES 6"160,000$$
TAPE SYMBOLS STOP/SCHOOL 36"11,000$$
LAYOUT PARKING LOT 3"130,000$$
LAYOUT X WALK11,000$$
LAYOUT LETTERS UP TO 8"120,000$$
1018AIRFIELD MARKINGS$
WHITE REFLECTIVE,TYPE 11310,000$$
YELLOW REFLECTIVE TYPE 11225,000$$
YELLOW NON-REFLECTIVE135,000$$
RED RELECTIVE,TYPE 1150,000$$
RED, NON REFLECTIVE150,000$$
WHITE REFLECTIVE,TYPE 311,000$$
YELLOW REFLECTIVE TYPE 311,000$$
RED RELECTIVE,TYPE 311,000$$

1019 RUBBER REMOVAL 1 180,000 $ $ $

1020 WATERBLASTING (COMMERCIAL) 1 10,500 $ $ $

1021ROAD/STREET MARKINGS$
WHITE REFLECTIVE TYPE 11140,000$$
YELLOW REFLECTIVE TYPE 1114,000$$
1022SIGNAGE$
FABRICATE SIGNS1400,000$$
INSTALL SIGNAGE(Poles,Bldgs, Curbs, etc)1500$$
INSTALL FRAMES AND SIGNS135$$
FABRICATE FRAMES(2" Alum Tubing)1430$$
FABRICATE FRAMES(3" Alum Tubing)1630$$
SIGN MAINTENANCE1200$$
PAINT SIGNS,BANNERS, LOGOS ETC14000$$
FABRICATE INSTALL POLES AND CAPS(3"X3"ALUM)135$$
FABRICATE INSTALL POLESAND CAPS(2"X2"ALUM)135$$
FABRICATE/INSTALL TEMP STANCTION160$$
TOTAL$
*Unit prices shall be inclusive of all costs (mobilization, overhead, profit, bond cost, etc) associated with the items of work shown.

Option Year 2

BLANK PRICING SCHEDULE
Option Yr 2QtyGovernment Estimated Qty; Info ONLYUnit PriceExtended PriceTOTAL PRICE
CLINDescription
2001INTERIOR PAINT$
GYP. BOARD, PRIMER1200,000$$
GYP. BOARD, ONE COAT1200,000$$
GYP. BOARD,TWO COAT1150,000$$
GYP.BOARD,STAIN SEAL COAT13,000$$
CMU,CONC.PRIME125,000$$
CMU,CONC.ONE COAT150,000$$
CMU, CONC. TWO COAT115,000$$
PLASTER, PRIME12,500$$
PLASTER, ONE COAT12,500$$
PLASTER, TWO COAT15,000$$
WOOD, PRIME15,000$$
WOOD, ONE COAT17,000$$
WOOD. STAIN (3 coats, sand after first)17,000$$
METAL, PRIME16,000$$
METAL,ONE COAT15,000$$
METAL, HIGH TEMPERATURE11,000$$
BASEBOARD, ONE COAT15,000$$
2002EXTERIOR PAINT$
ABS CEM. PRIME14000$$
ABS CEM.,ONE COAT18,000$$
ABS CEM.,TWO COAT19,000$$
CONC, STUCCO MASONRY, FILLER1100$$
CONC, STUCCO ONE COAT11,000$$
CONC,STUCCO TWO COAT11,000$$
CONC,STUCCO MURATIC ACID WASH11,000$$
FERROUS,PRIME15,000$$
FERROUS,ONE COAT15,000$$
FERROUS, TWO COATS11,000$$
ASPHALT COATED STEEL,PRIME15,000$$
ASPHALT COATED STEEL, ONE COAT17,500$$
ASPHALT COATED STEEL,TWO COAT11,000$$
GALV./NON FERROUS, PRIME12,000$$
GALV./NON FERROUS, ONE COAT16,000$$
GALV./ NON FERROUS, TWO COAT15,000$$
ALUMINUM (HANGARS) PRIME130,000$$
ALUMINUM (HANGARS) ONE COAT145,000$$
ALUMINUM (HANGARS) TWO COAT15,000$$
WOOD, PRIME11,500$$
WOOD, ONE COAT12,500$$
WOOD, TWO COAT12,500$$
2003DOORS REFINISH$
DOORS, PRIME1450$$
DOORS,ONE COAT1450$$
DOORS, TWO COATS1200$$
DOORS, THREE COATS1100$$
DOORS,STAIN1300$$
DOORS, SHELLAC1300$$
DOORS,VARNISH 3 COAT SAND AFTER 11300$$
2004WINDOWS$
Windows up to 3'x5' include trim&frame
WINDOWS,PRIME1800$$
WINDOWS, ONE COAT1300$$
WINDOWS, TWO COAT1200$$
WINDOWS, THREE COAT1200$$
Windows larger than 3'x5' incl. fame&trim
WINDOWS, PRIME1325$$
WINDOWS ONE COAT1350$$
WINDOWS TWO COAT1200$$
WINDOWS THREE COAT1100$$
2005TRIM$
TRIM,WOOD UP TO 6" WIDE
TRIM, PRIME18,000$$
TRIM ONE COAT12,000$$
TRIM, TWO COAT112,000$$
TRIM, THREE COAT15,000$$
TRIM, WOOD OVER 6" WIDE
TRIM, PRIME1200$$
TRIM ONE COAT1200$$
TRIM, TWO COAT1200$$
TRIM, THREE COAT1200$$
2006MISC FLOOR FINISH$
SANDING11,000$$
STRIPE FLOORS WOOD/ CONC11,000$$
SEAL COAT11,000$$
WOOD/PAINT1500$$
FINISH1500$$
2007CONCRETE FLOORS$
URETHANE15,000$$
EPOXY15,000$$
ENAMEL15,000$$
NON-SKID(ADDITIVE)12,500$$

2008 GYP. BOARD REFINISH 1 5,000 $ $ $

2009SEALANT/CAULKING$
INTERIOR15,000$$
EXTERIOR15,000$$

2010 FIRE HYDRANT 1 200 $ $ $

2011FENCES$
CHAIN LINK12000$$
WOOD PAINT12000$$
WOOD STAIN13000$$

2012 POOLS, WALLS AND BOTTOM(SSPC 18) 1 6,000 $ $ $

2013 WOOD HANDRAILS 1 50 $ $ $

2014METAL UTILITY POLES 2 COATS$
< 30' HEIGHT1300$$
30'TO 110' HEIGHT1300$$
2015WALL COVERING$
INSTALL WALL COVERINGS LIGHTWEIGHT1500$$
INSTALL WALL COVERINGS MEDIUMWEIGHT1500$$
INSTALL WALL COVERINGS HEAVYWEIGHT1500$$
REMOVE WALLCOVERINGS14,000$$
2016SANDBLASTING$
NEAR WHITE METAL1200$$
COMMERCIAL METAL1200$$
CONCRETE1700$$
2017MISCELLANEOUS PAVEMENT MARKINGS$
TAPE ARROW1100$$
PAINT ARROW1500$$
TAPE 12" STOP LINES1100$$
PAINT 12" STOP LINES1500$$
TAPE 12" X WALKS12,400$$
PAINTED LETTERS UP TO 8"1225$$
HANDICAP SYMBOLS UP TO 36"1225$$
PARKING LOT LINES 6"160,000$$
TAPE SYMBOLS STOP/SCHOOL 36"11,000$$
LAYOUT PARKING LOT 3"130,000$$
LAYOUT X WALK11,000$$
LAYOUT LETTERS UP TO 8"120,000$$
2018AIRFIELD MARKINGS$
WHITE REFLECTIVE,TYPE 11310,000$$
YELLOW REFLECTIVE TYPE 11225,000$$
YELLOW NON-REFLECTIVE135,000$$
RED RELECTIVE,TYPE 1150,000$$
RED, NON REFLECTIVE150,000$$
WHITE REFLECTIVE,TYPE 311,000$$
YELLOW REFLECTIVE TYPE 311,000$$
RED RELECTIVE,TYPE 311,000$$

2019 RUBBER REMOVAL 1 180,000 $ $ $

2020 WATERBLASTING (COMMERCIAL) 1 10,500 $ $ $

2021ROAD/STREET MARKINGS$
WHITE REFLECTIVE TYPE 11140,000$$
YELLOW REFLECTIVE TYPE 1114,000$$
2022SIGNAGE$
FABRICATE SIGNS1400,000$$
INSTALL SIGNAGE(Poles,Bldgs, Curbs, etc)1500$$
INSTALL FRAMES AND SIGNS135$$
FABRICATE FRAMES(2" Alum Tubing)1430$$
FABRICATE FRAMES(3" Alum Tubing)1630$$
SIGN MAINTENANCE1200$$
PAINT SIGNS,BANNERS, LOGOS ETC14000$$
FABRICATE INSTALL POLES AND CAPS(3"X3"ALUM)135$$
FABRICATE INSTALL POLESAND CAPS(2"X2"ALUM)135$$
FABRICATE/INSTALL TEMP STANCTION160$$
TOTAL$
*Unit prices shall be inclusive of all costs (mobilization, overhead, profit, bond cost, etc) associated with the items of work shown.

Option Year 3

BLANK PRICING SCHEDULE
Option Yr 3QtyGovernment Estimated Qty; Info ONLYUnit PriceExtended PriceTOTAL PRICE
CLINDescription
3001INTERIOR PAINT$
GYP. BOARD, PRIMER1200,000$$
GYP. BOARD, ONE COAT1200,000$$
GYP. BOARD,TWO COAT1150,000$$
GYP.BOARD,STAIN SEAL COAT13,000$$
CMU,CONC.PRIME125,000$$
CMU,CONC.ONE COAT150,000$$
CMU, CONC. TWO COAT115,000$$
PLASTER, PRIME12,500$$
PLASTER, ONE COAT12,500$$
PLASTER, TWO COAT15,000$$
WOOD, PRIME15,000$$
WOOD, ONE COAT17,000$$
WOOD. STAIN (3 coats, sand after first)17,000$$
METAL, PRIME16,000$$
METAL,ONE COAT15,000$$
METAL, HIGH TEMPERATURE11,000$$
BASEBOARD, ONE COAT15,000$$
3002EXTERIOR PAINT$
ABS CEM. PRIME14000$$
ABS CEM.,ONE COAT18,000$$
ABS CEM.,TWO COAT19,000$$
CONC, STUCCO MASONRY, FILLER1100$$
CONC, STUCCO ONE COAT11,000$$
CONC,STUCCO TWO COAT11,000$$
CONC,STUCCO MURATIC ACID WASH11,000$$
FERROUS,PRIME15,000$$
FERROUS,ONE COAT15,000$$
FERROUS, TWO COATS11,000$$
ASPHALT COATED STEEL,PRIME15,000$$
ASPHALT COATED STEEL, ONE COAT17,500$$
ASPHALT COATED STEEL,TWO COAT11,000$$
GALV./NON FERROUS, PRIME12,000$$
GALV./NON FERROUS, ONE COAT16,000$$
GALV./ NON FERROUS, TWO COAT15,000$$
ALUMINUM (HANGARS) PRIME130,000$$
ALUMINUM (HANGARS) ONE COAT145,000$$
ALUMINUM (HANGARS) TWO COAT15,000$$
WOOD, PRIME11,500$$
WOOD, ONE COAT12,500$$
WOOD, TWO COAT12,500$$
3003DOORS REFINISH$
DOORS, PRIME1450$$
DOORS,ONE COAT1450$$
DOORS, TWO COATS1200$$
DOORS, THREE COATS1100$$
DOORS,STAIN1300$$
DOORS, SHELLAC1300$$
DOORS,VARNISH 3 COAT SAND AFTER 11300$$
3004WINDOWS$
Windows up to 3'x5' include trim&frame
WINDOWS,PRIME1800$$
WINDOWS, ONE COAT1300$$
WINDOWS, TWO COAT1200$$
WINDOWS, THREE COAT1200$$
Windows larger than 3'x5' incl. fame&trim
WINDOWS, PRIME1325$$
WINDOWS ONE COAT1350$$
WINDOWS TWO COAT1200$$
WINDOWS THREE COAT1100$$
3005TRIM$
TRIM,WOOD UP TO 6" WIDE
TRIM, PRIME18,000$$
TRIM ONE COAT12,000$$
TRIM, TWO COAT112,000$$
TRIM, THREE COAT15,000$$
TRIM, WOOD OVER 6" WIDE
TRIM, PRIME1200$$
TRIM ONE COAT1200$$
TRIM, TWO COAT1200$$
TRIM, THREE COAT1200$$
3006MISC FLOOR FINISH$
SANDING11,000$$
STRIPE FLOORS WOOD/ CONC11,000$$
SEAL COAT11,000$$
WOOD/PAINT1500$$
FINISH1500$$
3007CONCRETE FLOORS$
URETHANE15,000$$
EPOXY15,000$$
ENAMEL15,000$$
NON-SKID(ADDITIVE)12,500$$

3008 GYP. BOARD REFINISH 1 5,000 $ $ $

3009SEALANT/CAULKING$
INTERIOR15,000$$
EXTERIOR15,000$$

3010 FIRE HYDRANT 1 200 $ $ $

3011FENCES$
CHAIN LINK12000$$
WOOD PAINT12000$$
WOOD STAIN13000$$

3012 POOLS, WALLS AND BOTTOM(SSPC 18) 1 6,000 $ $ $

3013 WOOD HANDRAILS 1 50 $ $ $

3014METAL UTILITY POLES 2 COATS$
< 30' HEIGHT1300$$
30'TO 110' HEIGHT1300$$
3015WALL COVERING$
INSTALL WALL COVERINGS LIGHTWEIGHT1500$$
INSTALL WALL COVERINGS MEDIUMWEIGHT1500$$
INSTALL WALL COVERINGS HEAVYWEIGHT1500$$
REMOVE WALLCOVERINGS14,000$$
3016SANDBLASTING$
NEAR WHITE METAL1200$$
COMMERCIAL METAL1200$$
CONCRETE1700$$
3017MISCELLANEOUS PAVEMENT MARKINGS$
TAPE ARROW1100$$
PAINT ARROW1500$$
TAPE 12" STOP LINES1100$$
PAINT 12" STOP LINES1500$$
TAPE 12" X WALKS12,400$$
PAINTED LETTERS UP TO 8"1225$$
HANDICAP SYMBOLS UP TO 36"1225$$
PARKING LOT LINES 6"160,000$$
TAPE SYMBOLS STOP/SCHOOL 36"11,000$$
LAYOUT PARKING LOT 3"130,000$$
LAYOUT X WALK11,000$$
LAYOUT LETTERS UP TO 8"120,000$$
3018AIRFIELD MARKINGS$
WHITE REFLECTIVE,TYPE 11310,000$$
YELLOW REFLECTIVE TYPE 11225,000$$
YELLOW NON-REFLECTIVE135,000$$
RED RELECTIVE,TYPE 1150,000$$
RED, NON REFLECTIVE150,000$$
WHITE REFLECTIVE,TYPE 311,000$$
YELLOW REFLECTIVE TYPE 311,000$$
RED RELECTIVE,TYPE 311,000$$

3019 RUBBER REMOVAL 1 180,000 $ $ $

3020 WATERBLASTING (COMMERCIAL) 1 10,500 $ $ $

3021ROAD/STREET MARKINGS$
WHITE REFLECTIVE TYPE 11140,000$$
YELLOW REFLECTIVE TYPE 1114,000$$
3022SIGNAGE$
FABRICATE SIGNS1400,000$$
INSTALL SIGNAGE(Poles,Bldgs, Curbs, etc)1500$$
INSTALL FRAMES AND SIGNS135$$
FABRICATE FRAMES(2" Alum Tubing)1430$$
FABRICATE FRAMES(3" Alum Tubing)1630$$
SIGN MAINTENANCE1200$$
PAINT SIGNS,BANNERS, LOGOS ETC14000$$
FABRICATE INSTALL POLES AND CAPS(3"X3"ALUM)135$$
FABRICATE INSTALL POLESAND CAPS(2"X2"ALUM)135$$
FABRICATE/INSTALL TEMP STANCTION160$$
TOTAL$
*Unit prices shall be inclusive of all costs (mobilization, overhead, profit, bond cost, etc) associated with the items of work shown.

Option Year 4

BLANK PRICING SCHEDULE
Option Yr 4QtyGovernment Estimated Qty; Info ONLYUnit PriceExtended PriceTOTAL PRICE
CLINDescription
4001INTERIOR PAINT$
GYP. BOARD, PRIMER1200,000$$
GYP. BOARD, ONE COAT1200,000$$
GYP. BOARD,TWO COAT1150,000$$
GYP.BOARD,STAIN SEAL COAT13,000$$
CMU,CONC.PRIME125,000$$
CMU,CONC.ONE COAT150,000$$
CMU, CONC. TWO COAT115,000$$
PLASTER, PRIME12,500$$
PLASTER, ONE COAT12,500$$
PLASTER, TWO COAT15,000$$
WOOD, PRIME15,000$$
WOOD, ONE COAT17,000$$
WOOD. STAIN (3 coats, sand after first)17,000$$
METAL, PRIME16,000$$
METAL,ONE COAT15,000$$
METAL, HIGH TEMPERATURE11,000$$
BASEBOARD, ONE COAT15,000$$
4002EXTERIOR PAINT$
ABS CEM. PRIME14000$$
ABS CEM.,ONE COAT18,000$$
ABS CEM.,TWO COAT19,000$$
CONC, STUCCO MASONRY, FILLER1100$$
CONC, STUCCO ONE COAT11,000$$
CONC,STUCCO TWO COAT11,000$$
CONC,STUCCO MURATIC ACID WASH11,000$$
FERROUS,PRIME15,000$$
FERROUS,ONE COAT15,000$$
FERROUS, TWO COATS11,000$$
ASPHALT COATED STEEL,PRIME15,000$$
ASPHALT COATED STEEL, ONE COAT17,500$$
ASPHALT COATED STEEL,TWO COAT11,000$$
GALV./NON FERROUS, PRIME12,000$$
GALV./NON FERROUS, ONE COAT16,000$$
GALV./ NON FERROUS, TWO COAT15,000$$
ALUMINUM (HANGARS) PRIME130,000$$
ALUMINUM (HANGARS) ONE COAT145,000$$
ALUMINUM (HANGARS) TWO COAT15,000$$
WOOD, PRIME11,500$$
WOOD, ONE COAT12,500$$
WOOD, TWO COAT12,500$$
4003DOORS REFINISH$
DOORS, PRIME1450$$
DOORS,ONE COAT1450$$
DOORS, TWO COATS1200$$
DOORS, THREE COATS1100$$
DOORS,STAIN1300$$
DOORS, SHELLAC1300$$
DOORS,VARNISH 3 COAT SAND AFTER 11300$$
4004WINDOWS$
Windows up to 3'x5' include trim&frame
WINDOWS,PRIME1800$$
WINDOWS, ONE COAT1300$$
WINDOWS, TWO COAT1200$$
WINDOWS, THREE COAT1200$$
Windows larger than 3'x5' incl. fame&trim
WINDOWS, PRIME1325$$
WINDOWS ONE COAT1350$$
WINDOWS TWO COAT1200$$
WINDOWS THREE COAT1100$$
4005TRIM$
TRIM,WOOD UP TO 6" WIDE
TRIM, PRIME18,000$$
TRIM ONE COAT12,000$$
TRIM, TWO COAT112,000$$
TRIM, THREE COAT15,000$$
TRIM, WOOD OVER 6" WIDE
TRIM, PRIME1200$$
TRIM ONE COAT1200$$
TRIM, TWO COAT1200$$
TRIM, THREE COAT1200$$
4006MISC FLOOR FINISH$
SANDING11,000$$
STRIPE FLOORS WOOD/ CONC11,000$$
SEAL COAT11,000$$
WOOD/PAINT1500$$
FINISH1500$$
4007CONCRETE FLOORS$
URETHANE15,000$$
EPOXY15,000$$
ENAMEL15,000$$
NON-SKID(ADDITIVE)12,500$$

4008 GYP. BOARD REFINISH 1 5,000 $ $ $

4009SEALANT/CAULKING$
INTERIOR15,000$$
EXTERIOR15,000$$

4010 FIRE HYDRANT 1 200 $ $ $

4011FENCES$
CHAIN LINK12000$$
WOOD PAINT12000$$
WOOD STAIN13000$$

4012 POOLS, WALLS AND BOTTOM(SSPC 18) 1 6,000 $ $ $

4013 WOOD HANDRAILS 1 50 $ $ $

4014METAL UTILITY POLES 2 COATS$
< 30' HEIGHT1300$$
30'TO 110' HEIGHT1300$$
4015WALL COVERING$
INSTALL WALL COVERINGS LIGHTWEIGHT1500$$
INSTALL WALL COVERINGS MEDIUMWEIGHT1500$$
INSTALL WALL COVERINGS HEAVYWEIGHT1500$$
REMOVE WALLCOVERINGS14,000$$
4016SANDBLASTING$
NEAR WHITE METAL1200$$
COMMERCIAL METAL1200$$
CONCRETE1700$$
4017MISCELLANEOUS PAVEMENT MARKINGS$
TAPE ARROW1100$$
PAINT ARROW1500$$
TAPE 12" STOP LINES1100$$
PAINT 12" STOP LINES1500$$
TAPE 12" X WALKS12,400$$
PAINTED LETTERS UP TO 8"1225$$
HANDICAP SYMBOLS UP TO 36"1225$$
PARKING LOT LINES 6"160,000$$
TAPE SYMBOLS STOP/SCHOOL 36"11,000$$
LAYOUT PARKING LOT 3"130,000$$
LAYOUT X WALK11,000$$
LAYOUT LETTERS UP TO 8"120,000$$
4018AIRFIELD MARKINGS$
WHITE REFLECTIVE,TYPE 11310,000$$
YELLOW REFLECTIVE TYPE 11225,000$$
YELLOW NON-REFLECTIVE135,000$$
RED RELECTIVE,TYPE 1150,000$$
RED, NON REFLECTIVE150,000$$
WHITE REFLECTIVE,TYPE 311,000$$
YELLOW REFLECTIVE TYPE 311,000$$
RED RELECTIVE,TYPE 311,000$$

4019 RUBBER REMOVAL 1 180,000 $ $ $

4020 WATERBLASTING (COMMERCIAL) 1 10,500 $ $ $

4021ROAD/STREET MARKINGS$
WHITE REFLECTIVE TYPE 11140,000$$
YELLOW REFLECTIVE TYPE 1114,000$$
4022SIGNAGE$
FABRICATE SIGNS1400,000$$
INSTALL SIGNAGE(Poles,Bldgs, Curbs, etc)1500$$
INSTALL FRAMES AND SIGNS135$$
FABRICATE FRAMES(2" Alum Tubing)1430$$
FABRICATE FRAMES(3" Alum Tubing)1630$$
SIGN MAINTENANCE1200$$
PAINT SIGNS,BANNERS, LOGOS ETC14000$$
FABRICATE INSTALL POLES AND CAPS(3"X3"ALUM)135$$
FABRICATE INSTALL POLESAND CAPS(2"X2"ALUM)135$$
FABRICATE/INSTALL TEMP STANCTION160$$
TOTAL$
*Unit prices shall be inclusive of all costs (mobilization, overhead, profit, bond cost, etc) associated with the items of work shown.

52.217-8 Option

BLANK PRICING SCHEDULE
Extension OptionQtyGovernment Estimated Qty; Info ONLYUnit PriceExtended PriceTOTAL PRICE
CLINDescription
4001INTERIOR PAINT$
GYP. BOARD, PRIMER1100,000$$
GYP. BOARD, ONE COAT1100,000$$
GYP. BOARD,TWO COAT175,000$$
GYP.BOARD,STAIN SEAL COAT11,500$$
CMU,CONC.PRIME112,500$$
CMU,CONC.ONE COAT125,000$$
CMU, CONC. TWO COAT17,500$$
PLASTER, PRIME11,250$$
PLASTER, ONE COAT11,250$$
PLASTER, TWO COAT12,500$$
WOOD, PRIME12,500$$
WOOD, ONE COAT13,500$$
WOOD. STAIN (3 coats, sand after first)13,500$$
METAL, PRIME13,000$$
METAL,ONE COAT12,500$$
METAL, HIGH TEMPERATURE1500$$
BASEBOARD, ONE COAT12,500$$
4002EXTERIOR PAINT$
ABS CEM. PRIME12000$$
ABS CEM.,ONE COAT14,000$$
ABS CEM.,TWO COAT14,500$$
CONC, STUCCO MASONRY, FILLER150$$
CONC, STUCCO ONE COAT1500$$
CONC,STUCCO TWO COAT1500$$
CONC,STUCCO MURATIC ACID WASH1500$$
FERROUS,PRIME12,500$$
FERROUS,ONE COAT12,500$$
FERROUS, TWO COATS1500$$
ASPHALT COATED STEEL,PRIME12,500$$
ASPHALT COATED STEEL, ONE COAT13,750$$
ASPHALT COATED STEEL,TWO COAT1500$$
GALV./NON FERROUS, PRIME11,000$$
GALV./NON FERROUS, ONE COAT13,000$$
GALV./ NON FERROUS, TWO COAT12,500$$
ALUMINUM (HANGARS) PRIME115,000$$
ALUMINUM (HANGARS) ONE COAT122,500$$
ALUMINUM (HANGARS) TWO COAT12,500$$
WOOD, PRIME1750$$
WOOD, ONE COAT11,250$$
WOOD, TWO COAT11,250$$
4003DOORS REFINISH$
DOORS, PRIME1225$$
DOORS,ONE COAT1225$$
DOORS, TWO COATS1100$$
DOORS, THREE COATS150$$
DOORS,STAIN1150$$
DOORS, SHELLAC1150$$
DOORS,VARNISH 3 COAT SAND AFTER 11150$$
4004WINDOWS$
Windows up to 3'x5' include trim&frame
WINDOWS,PRIME1400$$
WINDOWS, ONE COAT1150$$
WINDOWS, TWO COAT1100$$
WINDOWS, THREE COAT1100$$
Windows larger than 3'x5' incl. fame&trim
WINDOWS, PRIME1170$$
WINDOWS ONE COAT1175$$
WINDOWS TWO COAT1100$$
WINDOWS THREE COAT150$$
4005TRIM$
TRIM,WOOD UP TO 6" WIDE
TRIM, PRIME14,000$$
TRIM ONE COAT11,000$$
TRIM, TWO COAT16,000$$
TRIM, THREE COAT12,500$$
TRIM, WOOD OVER 6" WIDE
TRIM, PRIME1100$$
TRIM ONE COAT1100$$
TRIM, TWO COAT1100$$
TRIM, THREE COAT1100$$
4006MISC FLOOR FINISH$
SANDING1500$$
STRIPE FLOORS WOOD/ CONC1500$$
SEAL COAT1500$$
WOOD/PAINT1250$$
FINISH1250$$
4007CONCRETE FLOORS$
URETHANE12,500$$
EPOXY12,500$$
ENAMEL12,500$$
NON-SKID(ADDITIVE)11,250$$

4008 GYP. BOARD REFINISH 1 2,500 $ $ $

4009SEALANT/CAULKING$
INTERIOR12,500$$
EXTERIOR12,500$$

4010 FIRE HYDRANT 1 100 $ $ $

4011FENCES$
CHAIN LINK11000$$
WOOD PAINT11000$$
WOOD STAIN11500$$

4012 POOLS, WALLS AND BOTTOM(SSPC 18) 1 3,000 $ $ $

4013 WOOD HANDRAILS 1 25 $ $ $

4014METAL UTILITY POLES 2 COATS$
< 30' HEIGHT1150$$
30'TO 110' HEIGHT1150$$
4015WALL COVERING$
INSTALL WALL COVERINGS LIGHTWEIGHT1250$$
INSTALL WALL COVERINGS MEDIUMWEIGHT1250$$
INSTALL WALL COVERINGS HEAVYWEIGHT1250$$
REMOVE WALLCOVERINGS12,000$$
4016SANDBLASTING$
NEAR WHITE METAL1100$$
COMMERCIAL METAL1100$$
CONCRETE1350$$
4017MISCELLANEOUS PAVEMENT MARKINGS$
TAPE ARROW150$$
PAINT ARROW1250$$
TAPE 12" STOP LINES150$$
PAINT 12" STOP LINES1250$$
TAPE 12" X WALKS11,200$$
PAINTED LETTERS UP TO 8"1115$$
HANDICAP SYMBOLS UP TO 36"1115$$
PARKING LOT LINES 6"130,000$$
TAPE SYMBOLS STOP/SCHOOL 36"1500$$
LAYOUT PARKING LOT 3"115,000$$
LAYOUT X WALK1500$$
LAYOUT LETTERS UP TO 8"110,000$$
4018AIRFIELD MARKINGS$
WHITE REFLECTIVE,TYPE 11155,000$$
YELLOW REFLECTIVE TYPE 11115,000$$
YELLOW NON-REFLECTIVE117,500$$
RED RELECTIVE,TYPE 1125,000$$
RED, NON REFLECTIVE125,000$$
WHITE REFLECTIVE,TYPE 31500$$
YELLOW REFLECTIVE TYPE 31500$$
RED RELECTIVE,TYPE 31500$$

4019 RUBBER REMOVAL 1 90,000 $ $ $

4020 WATERBLASTING (COMMERCIAL) 1 5,250 $ $ $

4021ROAD/STREET MARKINGS$
WHITE REFLECTIVE TYPE 1170,000$$
YELLOW REFLECTIVE TYPE 117,000$$
4022SIGNAGE$
FABRICATE SIGNS1200,000$$
INSTALL SIGNAGE(Poles,Bldgs, Curbs, etc)1250$$
INSTALL FRAMES AND SIGNS120$$
FABRICATE FRAMES(2" Alum Tubing)1215$$
FABRICATE FRAMES(3" Alum Tubing)1315$$
SIGN MAINTENANCE1100$$
PAINT SIGNS,BANNERS, LOGOS ETC12000$$
FABRICATE INSTALL POLES AND CAPS(3"X3"ALUM)120$$
FABRICATE INSTALL POLESAND CAPS(2"X2"ALUM)120$$
FABRICATE/INSTALL TEMP STANCTION130$$
TOTAL$
*Unit prices shall be inclusive of all costs (mobilization, overhead, profit, bond cost, etc) associated with the items of work shown.

File details come from the government source that posted it. Updated .