SOW.pdf
PDF 99 KB Posted
- Attached to
- REPLACE FLOORING, SAGAMORE HILL BLDG 5 Federal contract opportunity
- Solicitation number
- FA2835-17-R-0033
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q__A_Sagamore_Hill_Bldg_5.pdf | ||
| FA2835-17-R-0033.pdf | ||
| DBA_9-1-17.pdf | ||
| Bldg_5_Drawing.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
REPLACE FLOORING, SAGAMORE HILL BLDG 5
Location Building: 5
By: Gary L. Coleman
WORK ORDER NUMBER: 66872
DATED: 19 July 2017
GENERAL INFORMATION:
This project is intended to Replace Flooring on Sagamore Hill’s Bldg. 5 in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the
Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, Unified Facilities Criteria (UFC), state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. Effective immediately: Due to safety concerns the use of manhole fixed ladders on Hanscom AFB for the purpose of entry or egress is prohibited. The use of an alternative means of entry/egress (i.e. appropriate portable ladder/personnel lowering device) is authorized.
SCOPE: Remove the existing carpet in Bldg. 5 Operations and Maintenance area.
Replace the carpet with non-conductive tile.
Remove two desks and associated cabinetry, one computer workstation, one workbench, three toolboxes and one Refrigerator in the Maintenance area in way of carpet removal. (8 Inergen
Gas Bottles shall remain).
Two desks and associated cabinetry and one computer workstation in the Operations area in way of carpet removal.
Remove and dispose of approximately 1240 square feet of carpet in the Operations and
Maintenance area of Building 5. (Flooring under Equipment Racks, Inergen Gas Bottles and in UPS room shall remain).
Scrape floor smooth of all particles remaining from carpet removal.
Provide submittals for floor adhesive and flooring polish.
Apply S-202 or equal static dissipative adhesive.
Install .003” thk, copper grounding strips, approximately 2 foot long and attach to wall electrical sockets. (At least one grounding strip is required for every 500 square foot of tile, approximately 2 grounding strips in Operations area and 2 grounding strips in Maintenance area).
Install new non-conductive floor tile similar or equal to Armstrong ESD-Static Control 12” x
12” x 1/8” Vinyl Tile Flooring, Fossil Gray, Part Number 51956 or equal.
Apply touch-up painting where required.
Install new Gray Cove Base in areas of new flooring.
Apply S-392 or equal static dissipative polish.
Reinstall all office furniture in way of new flooring installation.
GENERAL REQUIREMENTS:
Work includes, but is not limited to the following:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. The Contractor is solely responsible for compliance with the Occupational Safety and
Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.
e. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form.
f. Provide three (3) copies of O & M manuals and warranty letter.
g. Period of Performance 60 days after award of contract.
ADMINISTRATION:
Points of Contact (POC):
POC: Gary L. Coleman Phone Number. (781) 225-2962
Alternate POC: Bill Niece Phone Number. (781) 225-6157
File details come from the government source that posted it. Updated .