Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Dust._Collrction_Syst._Picture.pdf | ||
| Q_&_A.pdf | ||
| Dust_Collection_Syst..pdf | ||
| DBA_8-18_-17.pdf | ||
| FA2835-17-R-0028_SOL..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
REPAIR DUST COLLECTION SYSTEM
Location Building: 1725
By: Gary L. Coleman
WORK ORDER NUMBER: 66890
DATED: 24 July 2017
GENERAL INFORMATION:
This project is intended to Repair Bullet Trap Dust Collection System in Building 1725 in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts
General Law requirements, Unified Facilities Criteria (UFC), state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. Effective immediately: Due to safety concerns the use of manhole fixed ladders on Hanscom AFB for the purpose of entry or egress is prohibited. The use of an alternative means of entry/egress (i.e. appropriate portable ladder/personnel lowering device) is authorized.
SCOPE: Repair Bullet Trap Dust Collection System
Disconnect Bullet Trap Dust Collection System.
HEPA vacuum all areas.
Load all collected dust waste from vacuuming into DOT fire rated containers.
Replace all filters and belts.
Diagnose and repair broken Bullet Trap Dust Collection System.
Provide routine maintenance of dust collector including lubrication to ensure proper operation.
Reconnect Bullet Trap Dust Collection System.
Conduct an operational test of repaired Bullet Trap Dust Collection System.
Dispose of all waste at the Base Hazardous Waste Storage Area at the end of each workday.
GENERAL REQUIREMENTS:
Work includes, but is not limited to the following:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. The Contractor is solely responsible for compliance with the Occupational Safety and
Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.
e. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form.
f. Provide three (3) copies of O & M manuals and warranty letter.
g. Period of Performance 60 days after award of contract.
ADMINISTRATION:
Points of Contact (POC):
POC: Gary L. Coleman Phone Number. (781) 225-2962
Alternate POC: Bill Niece Phone Number. (781) 225-6157