Text version
Descriptions
| CONTRACT ITEM DESCRIPTIONS | ||||
| Item | Unit | Specification Section | Drawing Reference | Description |
| A - DEMOLITION | ||||
| Cold planing | SY | 32 01 16.17 | 1 / C-301 | 1. Grinding of specified pavement to the depth indicated. |
| Curbing removal | LF | 02 41 00 | 1. Excavating sufficient soil to facilitate removal. | |
| 2. Removal and disposal of curbing. | ||||
| 3. Removal and disposal of any existing concrete footings. | ||||
| Remove bituminous concrete | TN | 02 41 00 | 1. Removal and disposal of bituminous concrete pavements. | |
| Note: Sawcutting, if required is issued under CLINs 11AE and 11AF | ||||
| Bituminous concrete reclamation | SY | 32 01 17 | 1 / C-302 | 1. Milling of pavement in place by milling machine or Bomag type equipment. |
| Sawcutting, bituminous | LF | 02 41 00 | 1. Sawcutting of bituminous concrete pavements, any depth. | |
| Sawcutting, concrete | LF | 02 41 00 | 1. Sawcutting of concrete, any depth. | |
| Pavement marking, removal | SF | 02 41 00 | 1. Removal of pavement markings. | |
| 2. Cleaning area of debris. | ||||
| Remove tree and stump, up to 7” diameter | EA | 02 41 00 | 1. Removal and disposal of tree. | |
| 2. Removal and disposal of root system. | ||||
| 3. Backfilling of hole with satisfactory material. | ||||
| Remove tree and stump, 8” to 11” diameter | EA | 02 41 00 | See above | |
| Remove tree and stump, 12” to 23” diameter | EA | 02 41 00 | See above | |
| Remove tree and stump, 24” to 36” diameter | EA | 02 41 00 | See above | |
| Remove tree and stump, 37” to 60” diameter | EA | 02 41 00 | See above | |
| Clear and grub | AC | 31 11 00 | 1. Clearing areas of trees (averaging 18 inches in diameter or less) by cutting flush with ground level. | |
| 2. Trimming of trees to be left standing. | ||||
| 3. Clearing areas of other obtrusions/structures. | ||||
| 4. Grubbing of materials. | ||||
| 6. Disposal of all materials. | ||||
| Remove chain link fence, up to 6’ height | LF | 02 41 00 | 1. Disassembly of fence, fabric and accessories. | |
| 2. Removal and disposal of fence fabric, fence posts and concrete footings. | ||||
| 3. Backfilling of holes with satisfactory material | ||||
| Remove chain link fence, over 6’ height | LF | 02 41 00 | See above. | |
| Remove wooden fence, up to 6’ height | LF | 02 41 00 | 1. Disassembly of fence, hardware and accessories. | |
| 2. Removal and disposal of fence, fence posts and concrete footings. | ||||
| 3. Backfilling of holes with satisfactory material | ||||
| Remove wooden fence, over 6’ height | LF | 02 41 00 | See above. | |
| Remove concrete steps | CY | 02 41 00 | 1. Demolition of concrete steps. | |
| 2. Removal and disposal of any handrails or other permanent hardware. | ||||
| 3. Disposal of all concrete and debris. | ||||
| 4. Backfilling and compaction of area with satisfactory material. | ||||
| Remove concrete slab, 4” thick | SF | 02 41 00 | 1. Demolition of concrete slab. | |
| 2. Removal and disposal of all concrete and debris. | ||||
| Note: Backfilling and compaction of area with satisfactory material. Covered under separate CLIN | ||||
| Remove concrete slab, 6” thick | SF | 02 41 00 | See above. | |
| Remove concrete slab, 8” thick | SF | 02 41 00 | See above. | |
| Remove concrete foundation wall | CY | 02 41 00 | 1. Demolition of concrete foundation wall. | |
| 2. Removal and disposal of all concrete and debris. | ||||
| Note: Assume foundation walls are reinforced | ||||
| Remove concrete strip footing | CY | 02 41 00 | 1. Demolition of concrete strip footing. | |
| 2. Removal and disposal of all concrete and debris. | ||||
| Note: Assume foundation walls are reinforced | ||||
| Concrete coring, less than 6” diameter | IN | 02 41 00 | 1. Coring through a concrete foundation wall or slab to facilitate the installation of utility stubs. | |
| 2. Grouting around pipe or sleeve after utility installation. | ||||
| NOTE: Measurement is based on the depth of the coring in whole inches. | ||||
| Concrete coring, greater than 6” | IN | 02 41 00 | See above. | |
| Dispose Government generated waste | CY | 01 52 40 | 1. Loading, hauling and disposing of government generated waste materials. | |
| Note: Government generated waste materials may consist of non-structural soils, reinforced concrete debris, bituminous pavement waste and debris and the like. | ||||
| Remove and dispose Asbestos water Pipe | LF | 02 82 14 | 1. Processing of all permits. | |
| 2. Setup/breakdown of any containment or protection required. | ||||
| 3. Removal of asbestos pipe to include any cutting required. | ||||
| 4. Packaging, transportation, and disposal of asbestos pipe. | ||||
| Remove and dispose Asbestos Sewer Pipe | LF | 02 82 14 | See above | |
| B - EARTHWORK | ||||
| Excavation, 0’ - 10’ | CY | 31 00 00 | 1. Excavation of soil material not defined as ledge or boulder by heavy machinery. | |
| 2. Excavation of soil material not defined as ledge or boulder by hand. | ||||
| 3. Removal and disposal of unsatisfactory material. | ||||
| 4. Backfill of excavation with satisfactory material. | ||||
| 5. Dewatering, shoring and bracing if necessary. | ||||
| Note: Initial backfills to include utility pipe bedding and base materials are issued under separate line items. | ||||
| Excavation, 10’ and deeper | CY | 31 00 00 | See above. | |
| Note: Shoring and bracing left in place is issued as a separate line item. Depth is measured from existing grade. | ||||
| Ledge or boulder removal | CY | 31 00 00 | 1. Excavation of ledge or boulder by blasting or heavy machinery. | |
| 2. Removal and disposal of unsatisfactory material. | ||||
| 3. Final backfill of excavation with satisfactory material. | ||||
| Note: Utility pipe bedding and base materials are issued under separate line items | ||||
| Fine grading and compaction | SY | 32 11 16 | 1. Fine grading of pavement bases. | |
| 32 11 23 | 2. Compaction of graded areas. | |||
| 32 12 16 | Note: 02AD is issued for each layer of different base material. | |||
| Subbase | CY | 32 11 16 | 1. Supplying and placing material as defined in the specification. | |
| Sand, utility bedding | CY | 33 11 00 | Multiple | See above. |
| 33 40 00 | ||||
| 33 51 15 | ||||
| 33 70 02.00 | ||||
| Sand, screened | CY | 31 00 00 | See above. | |
| Graded, crushed aggregate base course | CY | 32 11 23 | See above. | |
| Gravel, pea sized | CY | 31 00 00 | See above. | |
| Gravel, 3/4 inch crushed | CY | 31 00 00 | See above. | |
| Gravel, 3/4 inch round stone | CY | 31 00 00 | See above. | |
| Gravel, 1 1/2 inch stone | CY | 31 00 00 | See above. | |
| Erosion stone, 6 inch | CY | 31 00 00 | See above. | |
| Common fill | CY | 31 00 00 | See above. | |
| C - PAVING | ||||
| Bituminous concrete binder | TN | 32 12 16 | 1 / C-301 | 1. Placement of bituminous concrete as defined in the specification, by paver. |
| 2 / C-301 | 2. Rolling, back-rolling, proof-rolling and finishing as required. | |||
| 1 / C-302 | ||||
| Bituminous concrete top course | TN | 32 12 16 | 1 / C-301 | See above. |
| 2 / C-301 | ||||
| 1 / C-302 | ||||
| Asphalt tack coat | SY | 32 12 16 | 1 / C-301 | 1. Placing asphaltic tack coat to an existing asphalt or Portland cement surface. |
| Bituminous concrete sidewalk | SF | 2551 | 9 / C-503 | 1. Placement of bituminous concrete as defined in the specification. |
| 2. Compaction and finishing. | ||||
| Bituminous concrete handicap access ramp | SF | 32 12 16 | 1 / C-503 | See above. |
| Crack repair, type A | LF | 32 01 17.16 | 3 / C-509 | 1. Removal of existing sealant. |
| 2. Sawcutting or routing as required. | ||||
| 3. Sandblasting, waterblasting or otherwise cleaning of crack. | ||||
| 4. Placing backup material as required. | ||||
| 5. Placing sealant. | ||||
| Crack repair, type B | LF | 32 01 17.16 | 4 / C-509 | See above. |
| Install bituminous concrete by handwork | TN | 2551 | 1 / C-503 | 1. Placement of bituminous concrete as defined in the specification, by hand. |
| 9 / C-503 | 2. Rolling, back-rolling, proof-rolling and finishing as required. | |||
| D - CONCRETE | ||||
| Slab on grade, 4” thick | SF | 03 15 00.00 10 | 1. Placing a 6 mil polyethylene vapor barrier | |
| 03 30 00 | 2. All formwork, preparation, reinforcement and concrete required to construct slab in accordance with details shown on drawings. | |||
| 3. Supplying and placing 1/2 inch diameter J-shaped anchors as required. | ||||
| 4. Finishing of surface as required. | ||||
| Slab on grade, 6” thick | SF | 03 15 00.00 10 | See above. | |
| 03 30 00 | ||||
| Strip footing | CY | 03 15 00.00 10 | 1. All formwork, preparation, reinforcement and concrete required to construct strip footing in accordance with details shown on drawings. | |
| 03 30 00 | 2. Forming of a keyway as shown on details. | |||
| Note: Nominal footing sizes will be 12 inches thick by 24 inches, 36 inches or 48 inches. | ||||
| Foundation bearing wall | CY | 03 15 00.00 10 | 1. All formwork, preparation, reinforcement and concrete required to construct foundation wall in accordance with details shown on drawings. | |
| 03 30 00 | Note: Nominal widths of walls will be 8 inches, 10 inches or 12 inches. | |||
| Crack Sealing Concrete | LF | 32 01 17.16 | 3 / C-509 | 1. Routing and cleaning of cracks as required. |
| 4 / C-509 | 2. Placement of suitable crack filler material | |||
| 3. Application of asphalt or elastomeric sealant. | ||||
| Damp-proofing, bituminous, 2 coats | SF | 1. Applying cold-applied bituminous emulsion to exterior surfaces of foundation walls in areas shown. Two coats required. | ||
| Polystyrene perimeter insulation, 2” thick | SF | 03 30 00 | 1. Installing 2 inch thick rigid polystyrene exterior insulation. | |
| Spall repair | SF | 32 01 29.61, | 1. Repairing spalled areas of Portland cement concrete pavements. | |
| 03 01 30.71 | ||||
| Popout repair | EA | 32 01 29.61, | 1. Repairing popouts in Portland cement concrete pavements. | |
| 03 01 30.71 | ||||
| Concrete sidewalk | SF | 32 16 13 | 8 / C-503 | 1. All formwork, preparation, reinforcement, and concrete required to construct a 4 inch thick concrete sidewalk as shown on drawings. |
| 2. Broom finishing. | ||||
| Concrete handicap access ramp | CY | 2511 | 6 / C-503 | See above. |
| Cast-in-place concrete, 2500 psi | CY | 03 30 00, | 1. All formwork, preparation, reinforcement, and concrete required to construct a concrete structure not defined specifically elsewhere in this bid schedule. | |
| 03 45 00, | Note: Example of applications of CLINs 04AK, 04AL, and 04AM are to construct concrete stairs or a concrete headwall. | |||
| 03 15 00.00 10 | ||||
| Cast-in-place concrete, 3000 psi | CY | 03 30 00, | See above. | |
| 03 45 00, | ||||
| 03 15 00.00 10 | ||||
| Cast-in-place concrete, 4000 psi | CY | 03 30 00, | See above. | |
| 03 45 00, | ||||
| 03 15 00.00 10 | ||||
| E - CURBING | ||||
| Concrete curb, straight | LF | 32 16 14 | 7 / C-503 | 1. Excavation. |
| 10 / C-503 | 2. Subgrade preparation and compaction. | |||
| 3. Placement of a 6 inch thick compacted stone base. | ||||
| 4. Installation of curb unit | ||||
| 5. Placement of supporting concrete. | ||||
| 6. Backfilling with satisfactory material. | ||||
| Concrete curb, radius | LF | 32 16 14 | 7 / C-503 | See above. |
| Concrete curb, storm drain inlet | LF | 32 16 14 | 4 / C-505 | See above. |
| Granite curb, straight | LF | 32 16 14 | 6 / C-503 | See above. |
| 7 / C-503 | ||||
| Granite curb, radius | LF | 32 16 14 | 6 / C-503 | See above. |
| 7 / C-503 | ||||
| Granite curb, storm drain inlet | LF | 32 16 14 | 4 / C-505 | See above. |
| Granite curb, special | LF | 32 16 14 | 7 / C-503 | See above. |
| Note: Special granite curb is defined as a granite curb stone which requires special cutting to facilitate fitting curb around unmovable appurtenances. Special granite curb will not be issued for diving curb at sidewalk or handicap access ramp intersections or other areas where special cutting is common. | ||||
| Granite curb, sloped | LF | 32 16 14 | 2 / C-503 | See above. |
| 3 / C-503 | Note: Curb shall be installed at a 45 degree slope away from the road. | |||
| Remove and reset curbing | LF | 32 16 14 | 2 / C-503 | 1. Excavation. |
| 3 / C-503 | 2. Removal and stockpiling of curb stones, granite or concrete. | |||
| 7 / C-503 | 3. Cleaning of curb stones. | |||
| 10 / C-503 | 4. Subgrade preparation and compaction. | |||
| 5. Placement or replacement of 6 inch thick compacted stone base. | ||||
| 6. Installation of salvaged curb unit. | ||||
| 7. Placement of supporting concrete. | ||||
| 8. Backfilling with satisfactory material. | ||||
| Parking bumper | EA | 4 / C-503 | 1. Installation of 6 foot by 10 inch by 6 inch precast reinforced concrete parking bumper. | |
| 2. Securing parking bumper with #4 rebar driven through predrilled holes. | ||||
| Bollards, 8” concrete-filled pipe | EA | 5 / C-509 | 1. Excavation of 16 inch diameter by 3 foot deep hole. | |
| 2. Placement of 8 inch steel pipe. | ||||
| 3. Placement of concrete to a depth of 2 feet in hole around pipe. | ||||
| 4. Filling of pipe with concrete. | ||||
| 5. Backfilling hole with satisfactory material. | ||||
| Repoint granite curbs | LF | 32 16 14 | 1. Removal of loose mortar and or debris from existing joints. | |
| 2. Re-point joints using mortar or other acceptable joint material | ||||
| Install Security Bollard System | EA | 1. Purchase yellow powder coated steel Smith & Wesson Security Solutions (Franklin, TN) removable bollard system or approved equal to include bollard handles, embedment sleeve, flip top cover, lock and other product features shown on S&W installation detail, to include shipping. | ||
| 2. Necessary coordination and traffic control during installation | ||||
| 3. Cut/excavate pavement surface | ||||
| 4. Excavate hole per attached installation drawing. | ||||
| 5. Install bollard system per detail to include compacted gravel base, reinforced concrete, flap surface plate and locking mechanism. | ||||
| 6. Backfill hole with satisfactory compacted material | ||||
| 7. Repair surface per road surface repair detail | ||||
| F - WATER | ||||
| Copper pipe, 1/2” diameter | LF | 33 11 00 | 3 / C-506 | 1. Placement of copper pipe, associated fittings to include compression joints where required, bolts, tie rods, and all require accessories. |
| 2. Includes pipe bedding | ||||
| 3. Connection to other lines as specified. | ||||
| 4. Installation of plastic marking tape. | ||||
| Note: Excavation, backfill with suitable material will be covered under separate line items. | ||||
| Copper pipe, 3/4” diameter | LF | 33 11 00 | 3 / C-506 | See above. |
| Copper pipe, 1” diameter | LF | 33 11 00 | 3 / C-506 | See above. |
| Copper pipe, 1 1/2” diameter | LF | 33 11 00 | 3 / C-506 | See above. |
| Copper pipe, 2” diameter | LF | 33 11 00 | 3 / C-506 | See above. |
| Service connection, Size<=11/2” | EA | 33 11 00 | 7 / C-506 | 1. Supplying and installing a saddle, corporation, compression joint and gooseneck as required for the purpose of connecting service lines to water mains. |
| 2. Tapping into the water main. | ||||
| Note: Pipe installation to include all bolts, tie rods, etc. | ||||
| Service connection, 1-1/2" > Size <= 2 1/2" | EA | 033 11 00 | 7 / C-506 | See above |
| Service connection, Size > 2 1/2" | EA | 33 11 00 | 7 / C-506 | See above |
| Ductile iron pipe, 4” diameter | LF | 33 11 00 | 1 / C-506 | 1. Placement of ductile iron pipe including pipe bedding, anchor blocks, including bolts, tie rods, and all required accessories. |
| 3 / C-506 | 2. Installation of plastic marking tape. | |||
| Note: Excavation, backfill with suitable material will be covered under separate line items. | ||||
| Ductile iron pipe, 6” diameter | LF | 33 11 00 | 1 / C-506 | See above. |
| 3 / C-506 | ||||
| Ductile iron pipe, 8” diameter | LF | 33 11 00 | 1 / C-506 | See above. |
| 3 / C-506 | ||||
| Ductile iron pipe, 10” diameter | LF | 33 11 00 | 1 / C-506 | See above. |
| 3 / C-506 | ||||
| Ductile iron pipe, 12” diameter | LF | 33 11 00 | 1 / C-506 | See above. |
| 3 / C-506 | ||||
| Ductile iron pipe, 16” diameter | LF | 33 11 00 | 1 / C-506 | See above. |
| 3 / C-506 | ||||
| Hose bib, up to 1 1/2” dia | EA | 33 11 00 | 1. Installation of riser, stem and hydrant valve. | |
| Ball valve, 1/2” to 1” diameter | EA | 33 11 00 | 4 / C-506 | 1. Installation of ball valve. |
| Ball valve, 1 1/2” to 2” dia | EA | 33 11 00 | 4 / C-506 | See above |
| Curb stop valve, 3/4” diameter | EA | 33 11 00 | 4 / C-506 | 1. Installation of curb stop valve. |
| 2. Installation of casting and cover. | ||||
| Note: Does not include excavation and backfill | ||||
| Curb stop valve, 1” diameter | EA | 33 11 00 | 4 / C-506 | See above. |
| Curb stop valve, 1 1/2” diameter | EA | 33 11 00 | 4 / C-506 | See above. |
| Curb stop valve, 2” diameter | EA | 33 11 00 | 4 / C-506 | See above. |
| Water gate valve, 2” diameter | EA | 33 11 00 | 4 / C-506 | 1. Installation of iron body water gate valve. |
| Note: Does not include excavation and backfill | ||||
| Water gate valve, 3” diameter | EA | 33 11 00 | 4 / C-506 | See above. |
| Water gate valve, 4” diameter | EA | 33 11 00 | 4 / C-506 | See above. |
| Water gate valve, 6” diameter | EA | 33 11 00 | 4 / C-506 | See above. |
| Water gate valve, 8” diameter | EA | 33 11 00 | 4 / C-506 | See above. |
| Water gate valve, 10” dia | EA | 33 11 00 | 4 / C-506 | See above. |
| Water gate valve, 12” dia | EA | 33 11 00 | 4 / C-506 | See above. |
| Water gate valve, 16” dia | EA | 33 11 00 | 4 / C-506 | See above. |
| Post indicator valve, 6” dia | EA | 33 11 00 | 6 / C-506 | 1. Installation of post indicator valve. |
| Note: Does not include excavation and backfill | ||||
| Post indicator valve, 8” dia | EA | 33 11 00 | 6 / C-506 | See above. |
| Water gate casting and cover | VF | 33 11 00 | 7 / C-506 | 1. Installation of properly sized iron water gate casting, all sizes. |
| 2. Installation of cover with the word “WATER” marked. | ||||
| Ductile iron fitting, 4” dia | EA | 33 11 00 | 1. Installation of ductile iron fitting with the excluded angle and diameter noted. | |
| Ductile iron fitting, 6” dia | EA | 33 11 00 | See above. | |
| Ductile iron fitting, 8” dia | EA | 33 11 00 | See above. | |
| Ductile iron fitting, 10” dia | EA | 33 11 00 | See above. | |
| Ductile iron fitting, 12” dia | EA | 33 11 00 | See above. | |
| Ductile iron fitting, 16” dia | EA | 33 11 00 | See above. | |
| Pipe coupling, 3” diameter | EA | 33 11 00 | 1. Installation of pipe coupling for the purpose of connecting dissimilar pipe materials. | |
| Pipe coupling, 4” diameter | EA | 33 11 00 | See above. | |
| Pipe coupling, 6” diameter | EA | 33 11 00 | See above. | |
| Pipe coupling, 8” diameter | EA | 33 11 00 | See above. | |
| Pipe coupling, 10” diameter | EA | 33 11 00 | See above. | |
| Pipe coupling, 12” diameter | EA | 33 11 00 | See above. | |
| Pipe coupling, 16” diameter | EA | 33 11 00 | See above. | |
| Drill and tap unpressurized main (“dry tap”) <=8” | EA | 1. Connecting a new main to an existing main. | ||
| Note: One “dry tap” will be issued when the contractor is required to connect new or repaired water lines to an existing main (up to 16” diameter) when the flow of water in the existing main is temporarily isolated by nearby gate valves. Contractor shall provide all tools and equipment necessary to execute this connection. | ||||
| Drill and tap unpressurized main (“dry tap”) >8” | EA | See Above | ||
| Drill and tap pressurized main (“wet tap”) <=8” | EA | 1. Connecting a new main to an existing main. | ||
| Note: One “wet tap” will be issued when the contractor is required to connect new or repaired water lines to an existing main (up to 16” diameter) without interrupting or isolating the flow of water. Contractor shall provide all necessary tools and equipment. | ||||
| Drill and tap pressurized main (“wet tap”) >8” | EA | See above | ||
| Pressure testing, sanitizing and lab analysis | EA | 33 11 00 | 1. Pressure testing of water main connections and fittings. | |
| 2. Sanitizing of repaired or new lengths of pipe. | ||||
| 3. Laboratory analysis of water. | ||||
| Fire hydrant | EA | 33 11 00 | 2 / C-506 | 1. Installation of fire hydrant. |
| Relocate fire hydrant | EA | 33 11 00 | 2 / C-506 | 1. Removal of existing fire hydrant. |
| 2. Replacement of fire hydrant. | ||||
| 3. Backfilling of hole with satisfactory materials. | ||||
| 6" Fire Hydrant Extension Kit | EA | 1. Excavation as required | ||
| 2. Isolation of hydrant | ||||
| 3. Installation of the Hydrant Extension Kit | ||||
| 12” Fire Hydrant Extension Kit | EA | See above | ||
| 18” Fire Hydrant Extension Kit | EA | See above | ||
| 24” Fire Hydrant Extension Kit | EA | See above | ||
| Temporary By-Pass Piping | LF | 33 11 00 | 1. Complete setup and removal of all piping, valves, fittings and connections. | |
| 2. Any trenching and patching as required by the specifications. | ||||
| Note: Pressure testing, sanitizing and lab analysis will be accomplished under a separate CLIN. | ||||
| G - GAS | ||||
| Install 1 inch Gas line | LF | 33 51 15 | 8 / C-508 | 1. Include all pipe, pipe connections, bedding, and marking tape with metal wire, |
| Note: Excavation, backfill with suitable material will be covered under separate line items. | ||||
| Install 2 inch Gas line | LF | 33 51 15 | 8 / C-508 | See Above |
| Install 3 inch Gas line | LF | 33 51 15 | 8 / C-508 | See Above |
| Install 4 inch Gas line | LF | 33 51 15 | 8 / C-508 | See Above |
| Install 6 inch Gas Line | LF | 33 51 15 | 8 / C-508 | See Above |
| Install 1 inch Gas Valve | EA | 33 51 15 | 4 / C-506 | See Above |
| Install 2 inch Gas Valve | EA | 33 51 15 | 4 / C-506 | See Above |
| Install 3 inch Gas Valve | EA | 33 51 15 | 4 / C-506 | See Above |
| Install 4 inch Gas Valve | EA | 33 51 15 | 4 / C-506 | See Above |
| Install 6 inch Gas Valve | EA | 33 51 15 | 4 / C-506 | See Above |
| Install Valve Box | EA | 33 51 15 | 4 / C-506 | Valve box with adjustable stem installed at appropriate length |
| H - SEWER | ||||
| Clean and inspect sewer lines 12” and under | LF | 33 30 00 | 1. Cleaning sewer lines of all debris and sediments. | |
| 2. Inspect sewer lines by camera. | ||||
| Clean and inspect sewer lines over 12” | LF | 33 30 00 | See above. | |
| PVC sewer pipe, 4” | LF | 33 30 00 | 7 / C-505 | 1. Installation of sewer line including pipe bedding. |
| 2. Placement of plastic marking tape. | ||||
| Note: Excavation, backfill with suitable material will be covered under separate line items. | ||||
| PVC sewer pipe, 6” | LF | 33 30 00 | 7 / C-505 | See above. |
| PVC sewer pipe, 8” | LF | 33 30 00 | 7 / C-505 | See above. |
| PVC sewer pipe, 10” | LF | 33 30 00 | 7 / C-505 | See above. |
| PVC sewer pipe, 12” | LF | 33 30 00 | 7 / C-505 | See above. |
| PVC sewer pipe, 15” | LF | 33 30 00 | 7 / C-505 | See above. |
| PVC sewer pipe, 18” | LF | 33 30 00 | 7 / C-505 | See above. |
| PVC service connection, 4” | LF | 33 30 00 | 8 / C-504 | 1. Furnishing PVC sewer lines from buildings to mains. |
| 2. Connection to building discharge lines and mains. | ||||
| PVC service connection, 6” | LF | 33 30 00 | 8 / C-504 | See above |
| PVC service connection, 8” | LF | 33 30 00 | 8 / C-504 | See above |
| PVC wye/tee connection, 4” | EA | 33 30 00 | 7 / C-504 | 1. Furnishing and installing PVC wye or tee-shaped fitting. |
| PVC wye/tee connection, 6” | EA | 33 30 00 | 7 / C-504 | See above |
| PVC wye/tee connection, 8” | EA | 33 30 00 | 7 / C-504 | See above |
| PVC wye/tee connection, 10” | EA | 33 30 00 | 7 / C-504 | See above |
| PVC wye/tee connection, 12” | EA | 33 30 00 | 7 / C-504 | See above |
| PVC wye/tee connection, 15” | EA | 33 30 00 | 7 / C-504 | See above |
| PVC wye/tee connection, 18” | EA | 33 30 00 | 7 / C-504 | See above |
| PVC chimney, 4” | VF | 33 30 00 | 6 / C-504 | 1. Installation of vertical piping for chimneys. |
| PVC chimney, 5” | VF | 33 30 00 | 6 / C-504 | See above |
| PVC chimney, 6” | VF | 33 30 00 | 6 / C-504 | See above |
| Resinous liner, 6” | LF | 1. Installation of thermosetting resinous lining inside sewer lines without excavation. | ||
| 2. Installation should be per manufacturers instructions. | ||||
| Resinous liner, 8” | LF | See above. | ||
| Resinous liner, 10” | LF | See above. | ||
| Resinous liner, 12” | LF | See above. | ||
| Resinous liner, 15” | LF | See above. | ||
| Resinous liner, 18” | LF | See above. | ||
| Pipe Bursting, 6” | LF | 1. Replacement of existing sewer lines by pipebursting | ||
| Pipe Bursting, 8” | LF | See above | ||
| Pipe Bursting, 10” | LF | See above | ||
| Pipe Bursting, 12” | LF | See above | ||
| Pipe Bursting, 15” | LF | See above | ||
| Pipe Bursting, 18” | LF | See above | ||
| Drop connection, any size | LF | 33 30 00 | 7 / C-504 | 1. Construction of a manhole drop connection; Type A, Type B or Type C. |
| Tree Root Removal | LF | 33 30 00 | 1. Removal and disposal of tree roots | |
| Clean sewer manhole | EA | 33 30 00 | 1. Clean, remove, and dispose of all debris | |
| Repair structure – Trough | EA | 33 30 00 | 10 / C-504 | 1. Reconstruct troughs within sewer manholes |
| Sewer Manhole, 4’ diameter | VF | 33 30 00 | 9 / C-504 | 1. Excavate and prepare the existing subgrade |
| 2. Installation of prefabricated, cylindrical, reinforced concrete manhole structure. | ||||
| 3. Installation of vinyl ladder, with reflectorized treads | ||||
| 4. Includes casting and cover | ||||
| 5. Includes backfill and compaction as necessary | ||||
| Note: Payment for stone base will be issued under a separate line item | ||||
| Sewer Manhole, 5’ diameter | VF | 33 30 00 | 9 / C-504 | See above |
| Sewer Manhole, 6’ diameter | VF | 33 30 00 | 9 / C-504 | See above |
| J - STORM DRAINAGE | ||||
| Catchbasin/manhole, 4’ dia | VF | 33 40 00 | 5 / C-505 | 1. Installation of prefabricated, cylindrical, reinforced concrete manhole or catchbasin structure. |
| 6 / C-505 | 2. Installation of vinyl ladder, with reflectorized treads. | |||
| 3. Forming of invert if required. | ||||
| Note: Payment for stone base will be issued under a separate line item. | ||||
| Catchbasin/manhole, 5’ dia | VF | 33 40 00 | 5 / C-505 | See above |
| 6 / C-505 |
| Catchbasin/manhole, 6’ dia | VF | 33 40 00 | 5 / C-505 | See above |
| 6 / C-505 |
| Catchbasin casting and cover | EA | 33 40 00 | 1 / C-505 | 1. Installation of iron casting on prepared brick or mortar bed. |
| 2 / C-505 | 2. Installation of iron grated cover. | |||
| 3 / C-505 | ||||
| 7 / C-505 | ||||
| 8 / C-505 | ||||
| Manhole casting and cover | EA | 33 40 00 | See above | 1. Installation of iron casting on prepared brick or mortar bed. |
| 2. Provide iron cover marked with the appropriate utility designation.. | ||||
| Clean and adjust structure | EA | 33 40 00 | 1 / C-505 | 1. Removal of existing casting and cover. |
| 2 / C-505 | 2. Demolition of existing mortar or brick bed. | |||
| 3 / C-505 | 3. Cleaning of hardware. | |||
| 7 / C-505 | 4. Replacement of mortar or brick bed. | |||
| 8 / C-505 | 5. Replacement of casting and cover to new elevation. | |||
| Deepen structure | VF | 33 40 00 | 5 / C-505 | 1. Deepening of precast concrete drainage, sewer or comm/elec manholes and catchbasins. |
| 6 / C-505 | ||||
| Repair structure | VF | 33 40 00 | 5 / C-505 | 1. Rebuilding and/or repairing damaged precast concrete or brick drainage, sewer or comm/elec manholes and catchbasins. |
| 6 / C-505 | 2. Removing and resetting iron casting and cover. | |||
| Reinforced concrete pipe, 12” diameter | LF | 33 40 00 | 7 / C-505 | 1. Placing reinforced concrete pipe including pipe bedding. |
| 2. Connection to catchbasins or manholes where required. | ||||
| 3. Installation of plastic marking tape. | ||||
| Note: Excavation, backfill with suitable material will be covered under separate line items. | ||||
| Reinforced concrete pipe, 18” | LF | 33 40 00 | 7 / C-505 | See above. |
| Reinforced concrete pipe, 24” | LF | 33 40 00 | 7 / C-505 | See above. |
| PVC drain pipe, 6” diameter | LF | 33 40 00 | 7 / C-505 | 1. Work includes, placing PVC pipe, pipe bedding, and any fittings required. |
| 2. Connecting to catchbasins or manholes where required. | ||||
| 3. Installation of plastic marking tape. | ||||
| Note: Excavation, backfill with suitable material will be covered under separate line items. | ||||
| PVC drain pipe, 8” diameter | LF | 33 40 00 | 7 / C-505 | See above. |
| PVC drain pipe, 12” diameter | LF | 33 40 00 | 7 / C-505 | See above. |
| PVC drain pipe, 15” diameter | LF | 33 40 00 | 7 / C-505 | See above. |
| PVC drain pipe, 18” diameter | LF | 33 40 00 | 7 / C-505 | See above. |
| PVC drain pipe, 21” diameter | LF | 33 40 00 | 7 / C-505 | See above. |
| PVC drain pipe, 24” diameter | LF | 33 40 00 | 7 / C-505 | See above. |
| Foundation drain, 4” diameter | LF | 33 40 00 | 8 / C-506 | 1. Placing perforated PVC or PE foundation drain pipe and any fittings required. |
| Foundation drain, 6” diameter | LF | 33 40 00 | 8 / C-506 | See above. |
| Foundation drain, 8” diameter | LF | 33 40 00 | 8 / C-506 | See above. |
| Existing storm drain pipe cleaning | LF | 33 40 00 | 1. Removal and disposal of all sediments and debris in drainage ditches, swales, and storm pipes indicated on drawings. | |
| Existing storm structure cleaning | EA | 33 40 00 | 1. Removal and disposal of all sediments and debris in storm structures indicated. | |
| 09 ELECTRIC/COMM | ||||
| Utility conduit, 4” diameter | LF | 33 70 02.00 10 | 1 / C-508 | 1. Installation of Schedule 40 PVC conduit in locations shown. |
| 2 / C-508 | 2. Connection to manholes where indicated. | |||
| 3 / C-508 | 3. Installation of a 1/2 inch diameter pull rope. | |||
| 4. Installation of plastic detector tape. | ||||
| Note: For Duct Banks the total LF of conduit will be multiplied by the number of conduits in the duct bank. The number of conduits in the duct bank will be specified in the plans. | ||||
| Conduit stub, 4” diameter | LF | 33 70 02.00 10 | 1. Installation of Schedule 40 PVC conduit stub in a building mechanical room or at the base of an existing utility pole or transformer pad as described below | |
| 2. Installation of a horizontal stub extending 40 inches from the building foundation wall or utility pole. | ||||
| 3. Installation of a vertical stub extending 2 inches above finished floor elevation in a building or 40 inches at a utility pole. | ||||
| 4. Installation of a 90 degree sweep with a minimum radius as specified (up to 150 inches.) | ||||
| 5. Installation of a 1/2 inch diameter pull rope. | ||||
| Note: Coring through concrete if required is issued under a separate line item. | ||||
| Conduit radius sweep, 4” diameter | LF | 33 70 02.00 10 | 1. Installation of bends or sweeps in a conduit run. | |
| 2. Connection to straight runs. | ||||
| 3. Installation of a 1/2 inch diameter pull rope. | ||||
| Note: Where straight conduit runs are not geometrically possible, the contractor will be required to install bends or sweeps in the conduit run. | ||||
| 4”-22 degree bends | EA | 33 70 02.00 10 | 1. Installation of pre-formed bends in a conduit run. | |
| 2. Connection to straight runs. | ||||
| 3. Installation of a lightweight pull line | ||||
| 4. Installation of plastic detector tape. | ||||
| Note: Where straight conduit runs are not geometrically possible, the contractor will be required to install bends or sweeps in the conduit run. | ||||
| 4”-45 degree bends | EA | 33 70 02.00 10 | See above | |
| 4”-90 degree bends | EA | 33 70 02.00 10 | See above | |
| Utility Conduit, 2” dia | LF | 33 70 02.00 10 | 1 / C-508 | 1. Installation of Schedule 40 PVC conduit in locations shown. |
| 2 / C-508 | 2. Connection to manholes or handholes where indicated. | |||
| 3 / C-508 | 3. Installation of a lightweight pull string. | |||
| 4. Installation of plastic detector tape. | ||||
| Note: For Duct Banks the total LF of conduit will be multiplied by the number of conduits in the duct bank. The number of conduits in the duct bank will be specified in the plans. | ||||
| Conduit radius sweep, 2” diameter | LF | 33 70 02.00 10 | 1. Installation of bends or sweeps in a conduit run. | |
| 2. Connection to straight runs. | ||||
| 3. Installation of a 1/2 inch diameter pull rope. | ||||
| Note: Where straight conduit runs are not geometrically possible, the contractor will be required to install bends or sweeps in the conduit run. | ||||
| 2”-22 degree bends | EA | 33 70 02.00 10 | 1. Installation of pre-formed bends in a conduit run. | |
| 2. Connection to straight runs. | ||||
| 3. Installation of a lightweight pull line. | ||||
| 4. Installation of plastic detector tape. | ||||
| Note: Where straight conduit runs are not geometrically possible, the contractor will be required to install bends or sweeps in the conduit run. | ||||
| 2”-45 degree bends | EA | 33 70 02.00 10 | See above | |
| 2”-90 degree bends | EA | 33 70 02.00 10 | See above | |
| 4” Conduit Connectors | EA | 33 70 02.00 10 | 1. Preparation of conduit for installation of connectors. | |
| 2. Installation of connectors. | ||||
| 2” Conduit Connectors | EA | 33 70 02.00 10 | See above | |
| Telephone Manhole | EA | 33 70 02.00 10 | 4 / C-507 | 1. Installation, grading and compaction of base material. |
| 2. Installation of a two-piece, prefabricated, reinforced concrete vault type, telephone manhole measuring 5’ by 7’ by 10’ (inside dimensions) complete with frame and cover. | ||||
| Note: Excavation is issued under separate line items. | ||||
| Electric Switch Vault | EA | 33 70 02.00 10 | 1 / C-507 | 1. Installation, grading and compaction of base material. |
| 2. Installation of a two-piece, prefabricated, reinforced concrete vault type, telephone manhole measuring 5’ by 7’ by 10’ (inside dimensions) complete with frame and cover. | ||||
| Note: Excavation is issued under separate line items. | ||||
| Electric Manhole | EA | 33 70 02.00 10 | 3 / C-507 | 1. Installation, grading and compaction of base material. |
| 1 / E-501 | 2. Installation of a two-piece, prefabricated, reinforced concrete vault type, telephone manhole measuring 5’ by 7’ by 10’ (inside dimensions) complete with frame and cover. | |||
| Note: Excavation is issued under separate line items. | ||||
| Conduit Spacers | EA | 33 70 02.00 10 | 5 / C-508 | 1. Installation of spacers as defined in the specifications. |
| 4” PVC Access Fitting, Type LB | EA | 33 70 02.00 10 | 1. Installation of 4” Access Fitting as defined in the specifications. | |
| 2” PVC Access Fitting, Type LB | EA | 33 70 02.00 10 | 1. Installation of 2” Access Fitting as defined in the specifications. | |
| Internal conduit divider, flexible | LF | 33 70 02.00 10 | 1. Installation of flexible (“innerduct”) conduit dividers. | |
| 2. Installation of a lightweight pull line (fish line). | ||||
| Fiberglass Handhole | EA | 33 70 02.00 10 | 1. Installation, grading and compaction of base material. | |
| 2. Installation of fiberglass handhole. | ||||
| Note: Excavation is issued under separate line items. | ||||
| Handhole, 4’ x 4’ x 4’ | EA | 33 70 02.00 10 | 6 / C-508 | 1. Excavation |
| 2. Installation, grading and compaction of base material. | ||||
| 3. Installation of a 4 feet cubical precast concrete handhole. | ||||
| Concrete encasement | CY | 33 70 02.00 10 | 2 / C-508 | 1. Encasing conduit or conduit banks in lightly reinforced, 2500 psi concrete. |
| 2. Providing conduit supports and conduit spacers as required. | ||||
| Light Pole Base, Raised | EA | 26 56 00 | 4 / E-501 | 1. Remove existing light pole and light fixture. |
| 2. Remove existing light pole base. | ||||
| 3. Install new light pole base. | ||||
| 4. Re-install light pole and light fixture. | ||||
| Light Pole Base, Flush | EA | 26 56 00 | 5 / E-501 | See above |
| Lighting Fixture, Direct Arm | EA | 26 56 00 | 1 / E-502 | 1. Remove existing light fixture |
| 2. Install replacement light fixture | ||||
| Lighting Fixture, Adjustable Arm | EA | 26 56 00 | 2 / E-502 | See above |
| Lighting Fixture, Cobrahead | EA | 26 56 00 | 3 / E-502 | See above |
| Lighting Fixture, Post Top | EA | 26 56 00 | 4 / E-502 | See above |
| Light pole, 30’ | EA | 26 56 00 | 1. Remove existing light fixture | |
| 2. Remove and dispose of existing light pole | ||||
| 3. Install new light pole. | ||||
| 4. Work includes all additional work required for electrical connections and anchoring to existing foundation. | ||||
| Light Pole, 20’ | EA | 26 56 00 | N/A | See above |
| Primary Electrical Conduit | LF | 33 70 02.00 10 | 3 / C-508 | 1. Installation of Schedule 40 PVC conduit in locations shown. |
| 2. Concrete encasement | ||||
| 3. Connection to manholes where indicated. | ||||
| 4. Installation of a 1/2 inch diameter pull rope. | ||||
| 5. Installation of plastic detector tape. | ||||
| Note: For Duct Banks the total LF of conduit will be multiplied by the number of conduits in the duct bank. The number of conduits in the duct bank will be specified in the plans. | ||||
| L - LANDSCAPING | ||||
| Loam | CY | 32 92 19 | 1. Placement loam (topsoil) in areas and in thicknesses shown on plans. | |
| Seeding, by hand | SF | 32 92 19 | 1. Preparation of existing topsoil for seed by tilling, grading, raking, compacting and watering where necessary. | |
| 2. Broadcasting seed. | ||||
| 3. Rolling if required. | ||||
| 4. Providing erosion control measures where necessary. | ||||
| 5. Watering and care until full establishment. | ||||
| Seeding, by hydroseed | SF | 32 92 19 | See above. | |
| Note: Spreading will be by hydroseeding | ||||
| Red Hemlock mulch | CY | 32 92 19 | 1. Spreading Red Hemlock mulch in thicknesses and in areas indicated on drawings. | |
| 32 93 00 | ||||
| Weed check mat | SY | 32 92 19 | 1. Placement of weed check mat. | |
| 32 93 00 | ||||
| Filter fabric | SY | 32 92 19 | 1 / C-501 | 1. Placement of filter fabric. |
| 32 93 00 | ||||
| Move shrub, 12” root ball | EA | 32 93 00 | 1. Excavation and removal of planting and surrounding mulch, and backfilling hole with suitable material. | |
| 2. Excavation at new location. | ||||
| 3. Replacement of planting in new location. | ||||
| 4. Guying and staking if necessary. | ||||
| 5. Watering and care until full establishment. | ||||
| Move shrub, 24” root ball | EA | 32 93 00 | See above. | |
| Move tree, 36” root ball | EA | 32 93 00 | See above | |
| Move tree, 60” root ball | EA | 32 93 00 | See above. | |
| M - FENCING | ||||
| Chain link fence, vinyl coated, 4’ height | LF | 32 31 13 | C-502 | 1. Excavation. |
| 2. Installation of posts set in concrete. | ||||
| 3. Installation of rails, tie rods and all accessories required. | ||||
| 4. Backfilling holes with satisfactory material. | ||||
| Chain link fence, vinyl coated, 6’ height | LF | 32 31 13 | C-502 | See above. |
| Chain link fence, vinyl coated, 8’ height | LF | 32 31 13 | C-502 | See above. |
| Personnel gate, vinyl coated, 4’ height | EA | 32 31 13 | 1. Installation of chain link fence gate for personnel access. | |
| 2. Installation of locking hasp if required | ||||
| Personnel gate, vinyl coated, 6’ height | EA | 32 31 13 | See above. | |
| Personnel gate, vinyl coated, 8’ height | EA | 32 31 13 | See above. | |
| Vehicle gate, vinyl coated, 6’ height | EA | 32 31 13 | 1. Installation of chain link fence gate for vehicle access. | |
| 2. Installation of all hardware to provide swing or travel of gate shown on drawings. | ||||
| 3. Installation of locking hasp if required | ||||
| Vehicle gate, 8’ height | EA | 32 31 13 | See above. | |
| Barbed wire, 3-strand | LF | 32 31 13 | 2 / C-502 | 1. Installation of an extension on every fence post angled 45 degrees from vertical to the outside of the area to be secured. |
| 2. Installation of 3 strands of tensioned barbed wire. | ||||
| Privacy slats | SF | 32 31 13 | 1. Installation of brown flexible plastic privacy slats in an existing chain link fence. | |
| Install Government Furnished Fence, any height | LF | 32 31 13 | C-502 | See CLIN 10AA above. |
| N - MISCELLANEOUS | ||||
| Pavement marking, striping | LF | 32 17 24.00 10 | 1 / C-509 | 1. Painting of a 4 inch wide retro-reflective pavement stripe in the colors and locations shown. |
| Note: For 8 inch and 12 inch stripes, double and triple passes will be issued. | ||||
| Pavement marking, gore | SF | 32 17 24.00 10 | 1 / C-509 | 1. Painting of 4 inch wide retro-reflective stripes centered 24 inches on center angled 45 degrees from the orientation of the pavement or nearby structure, in the color and location shown. |
| 2. Painting of a single 4 inch wide perimeter stripe. | ||||
| Pavement marking, crosswalk | LF | 32 17 24.00 10 | 2 / C-509 | 1. Painting of two parallel 12 inch wide retro-reflective stripes the full length of the crossing. |
| 2. Painting of a single 12 inch wide stripe to serve as a stop line, if required. | ||||
| Note: Measurement and payment is based on the width of the road as an average length of the crosswalk measured at the location of the crossing. | ||||
| Pavement marking, handicap logo | EA | 32 17 24.00 10 | 5 / C-509 | 1. Painting of the standard handicap logo in single 5 inch wide white stripes. |
| 5 / C-509 | 2. Logo must be in accordance with MUTCD | |||
| Note: Handicap logo shall cover an area approximately 4 feet square. | ||||
| Pavement marking, letters | EA | 32 17 24.00 10 | 1. Provide painted letters as shown on the project plans. | |
| 2. Letters must be accordance with MUTCD and the Standard Highway Signs and Markings book. | ||||
| Pavement marking, turn arrow | EA | 32 17 24.00 10 | 1. Provide painted turn arrows as shown on the project plans. | |
| 2. Letters must be accordance with MUTCD and the Standard Highway Signs and Markings book. | ||||
| Install traffic sign | EA | 10 14 53 | 5 / C-501 | 1. Digging 12 inch diameter hole for placement of sign post. |
| 2. Setting sign post in concrete. | ||||
| 3. Installation of sheet metal reflectorized traffic sign with indicated message. | ||||
| 4. All traffic controls signs must comply with the most current version of the MUTCD. | ||||
| Note: Maximum sign size will be 3 feet by 3 feet. | ||||
| Install government-furnished sign | EA | 10 14 53 | 5 / C-501 | 1. Digging 12 inch diameter hole for placement of sign post. |
| 2. Setting sign post in concrete. | ||||
| 3. Installation of government-furnished sheet metal traffic sign. | ||||
| Remove and reset sign | EA | 10 14 53 | 5 / C-501 | 1. Removal of existing sign, post and concrete footing. |
| 2. Backfilling of hole with satisfactory material. | ||||
| 3. Installation of sign as described above in location indicated. | ||||
| Metal guardrail | LF | 32 31 40 | 3 / C-501 | 1. Excavation. |
| 2. Setting posts in concrete. | ||||
| 3. Installation of metal guardrail and accessories. | ||||
| Timber guardrail | LF | 32 31 40 | 2 / C-501 | 1. Excavation. |
| 2. Setting posts in concrete. | ||||
| 3. Installation of wooden guardrail and accessories. | ||||
| Handrails | LF | 1. Installation of handrails as required. | ||
| Staked siltation barrier/fence with hay bales | LF | 31 32 11 | 4 / C-501 | 1. Providing and maintaining a staked plastic siltation/filter fabric barrier. |
| 2. Providing and maintaining staked hay bales. | ||||
| Miscellaneous labor | MH | 1. Performance of miscellaneous job tasks not covered in specific line items, but within the general scope of this contract and in support of specified line items but only as directed by the Contracting Officer. | ||
| Note: Issue is based on the estimated time in MAN-HOURS required to complete the job tasks. | ||||
| Security Escorts | MH | 1. Providing security escorts work within restricted areas. | ||
| Note: This line item only applies to work being performed in specific areas on Cape Cod Air Force Station. | ||||
| Surveying | MH | 1. Surveying to verify existing topography where this information is not otherwise provided by the Government, but only when directed by the Contracting Officer. | ||
| Note: Issue is based on the estimated time in MAN-HOURS required to complete the in-field survey work. | ||||
| Emergency Repairs, 5 Man Crew, Premium Time | CH | 1. Providing labor for emergency repairs during premium time. The crew also consists of 1 Super, 1 operator, 1 truck driver, and 2 laborers. This also includes equipment mobilization. | ||
| Sheeting/shoring left in place | SF | 1. Self explanatory. |
&"Arial,Bold"&14Sitework and Paving IDIQ &D &"Arial,Bold"&14FY2015 Contract (5 Year Ordering Period) Period 01 - 15 Sep 15 - 30 Sep 16
&"Arial,Regular"&12&D, &T &"Arial,Regular"&12&F, &A &"Arial,Regular"&12&P of &N
BID (1)
| Sub Sch | Line No. | Description | Estimated Quantity | U/M | Unit | |
| Price | Total |
| A - DEMOLITION | |||||
| A | A01 | Cold planing | 340 | SY | |
| A | A02 | Curbing removal | 500 | LF | |
| A | A03 | Remove bituminous concrete | 500 | TN | |
| A | A04 | Bituminous concrete reclamation | 3,500 | SY | |
| A | A05 | Sawcutting, bituminous | 16,000 | LF | |
| A | A06 | Sawcutting, includes all reinforcement | 180 | LF | |
| A | A07 | Remove brick pavers | 180 | SF | |
| A | A08 | Pavement marking removal | 5,900 | SF | |
| A | A09 | Remove tree and stump, up to 7" dia | 1 | EA | |
| A | A10 | Remove tree and stump, 8" to 11" dia | 1 | EA | |
| A | A11 | Remove tree and stump, 12" to 23" dia | 1 | EA | |
| A | A12 | Remove tree and stump, 24" to 35" dia | 1 | EA | |
| A | A13 | Remove tree and stump, 37" to 60" dia | 1 | EA | |
| A | A14 | Clear and grub | 1 | AC | |
| A | A15 | Remove chain link fence | 84 | LF | |
| A | A16 | Remove wooden fence | 84 | LF | |
| A | A17 | Remove concrete steps | 8 | CY | |
| A | A18 | Remove concrete slab | 8 | CY | |
| A | A19 | Remove Ducile Iron Pipe | 17 | LF | |
| A | A20 | Remove Copper Pipe | 34 | LF | |
| A | A21 | Remove PVC Pipe | 34 | LF | |
| A | A22 | Remove Cast Iron Pipe | 4,500 | LF | |
| A | A23 | Remove Concrete Pipe | 50 | LF | |
| A | A24 | Remove concrete foundation wall | 17 | CY | |
| A | A25 | Remove concrete strip footing | 17 | CY | |
| A | A26 | Concrete coring | 8 | IN | |
| A | A27 | Dispose Government generated waste | 34 | CY | |
| A | A28 | Remove/Dispose Asbestos Pipe | 800 | LF | |
| B - EARTHWORK | |||||
| B | B01 | Excavation, 0' - 10' | 14,400 | CY | |
| B | B02 | Excavation, 10' and deeper | 170 | CY | |
| B | B03 | Ledge or boulder removal | 250 | CY | |
| B | B04 | Fine grading and compaction | 79,554 | SY | |
| B | B05 | Subbase | 7,900 | CY | |
| B | B06 | Sand, Utility Bedding | 142 | CY | |
| B | B07 | Sand Screened | 50 | CY | |
| B | B08 | Graded crushed aggregate base course | 50 | CY | |
| B | B09 | Gravel, pea sized | 50 | CY | |
| B | B10 | Gravel, 3/4 inch crushed | 906 | CY | |
| B | B11 | Gravel, 3/4 inch round | 50 | CY | |
| B | B12 | Gravel, 1 1/2 inch stone | 50 | CY | |
| B | B13 | Erosion stone, 6 inch | 34 | CY | |
| B | B14 | Common fill | 500 | CY | |
| C - PAVING | |||||
| C | C01 | Bituminous concrete binder | 4,100 | TN | |
| C | C02 | Bituminous concrete top course | 4,100 | TN | |
| C | C03 | Asphalt tack coat | 9,390 | SY | |
| C | C04 | Bituminous concrete sidewalk | 500 | SF | |
| C | C05 | Bituminous concrete handicap access ramp | 84 | SF | |
| C | C06 | Crack repair | 340 | LF | |
| C | C07 | Install bituminous concrete by handwork | 68 | TN | |
| C | C08 | Install Brick Pavers | 100 | SF | |
| C | C09 | ADA Dectable Warning Mat | 7 | EA | |
| D - CONCRETE | |||||
| D | D01 | Slab on grade | 54 | CY | |
| D | D02 | Strip footing | 54 | CY | |
| D | D03 | Foundation bearing wall | 84 | CY | |
| D | D04 | Crack sealing concrete | 84 | LF | |
| D | D05 | Damp-proofing, bitumonous, 2 coasts | 340 | SF | |
| D | D06 | Spall repair | 170 | SF | |
| D | D07 | Popout repair | 2 | EA | |
| D | D08 | Concrete sidewalk | 500 | SF | |
| D | D09 | Concrete handicap access ramp | 2 | CY | |
| D | D10 | Cast-in-place concrete, 2500 psi | 17 | CY | |
| D | D11 | Cast-in-place concrete, 3000 psi | 17 | CY | |
| D | D12 | Cast-in-place concrete, 4000 psi | 17 | CY | |
| E - CURBING | |||||
| E | E01 | Concrete curb, straight | 420 | LF | |
| E | E02 | Concrete curb, radius | 84 | LF | |
| E | E03 | Concrete curb, storm drain inlet | 84 | LF | |
| E | E04 | Granite curb, straight | 1,700 | LF | |
| E | E05 | Granite curb, radius | 250 | LF | |
| E | E06 | Granite curb, storm drain inlet | 84 | LF | |
| E | E07 | Granite curb, special | 420 | LF | |
| E | E08 | Granite curb, sloped | 420 | LF | |
| E | E08 | Remove and reset curbing | 11,840 | LF | |
| E | E09 | Parking Bumper | 3 | EA | |
| E | E10 | Bollard, 8" concrete-filled pipe | 2 | EA | |
| E | E11 | Repoint Granite Curbs | 340 | LF | |
| E | E12 | Installation of Bollard System | 50 | EA | |
| F - WATER | |||||
| F | F01 | Copper pipe, 1/2" diameter | 170 | LF | |
| F | F02 | Copper pipe, 3/4" diameter | 170 | LF | |
| F | F03 | Copper pipe, 1" diameter | 170 | LF | |
| F | F04 | Copper pipe, 1 1/2" diameter | 170 | LF | |
| F | F05 | Copper pipe, 2" diameter | 170 | LF | |
| F | F06 | Service connection, Size <= 1 1/2" | 1 | EA | |
| F | F07 | Service connection, >1-1/2" | 1 | EA | |
| F | F08 | Ductile iron pipe, 4" diameter | 34 | LF | |
| F | F09 | Ductile iron pipe, 6" diameter | 34 | LF | |
| F | F10 | Ductile iron pipe, 8" diameter | 5,340 | LF | |
| F | F11 | Ductile iron pipe, 10" diameter | 84 | LF | |
| F | F12 | Ductile iron pipe, 12" diameter | 50 | LF | |
| F | F13 | Ductile iron pipe, 16" diameter | 36 | LF | |
| F | F14 | Hose bib, up to 1 1/2" diameter | 2 | EA | |
| F | F15 | Ball valve, 1/2" to 1" diameter | 2 | EA | |
| F | F16 | Ball valve, 1 1/2" to 2" diameter | 2 | EA | |
| F | F17 | Curb stop valve, 3/4" diameter | 2 | EA | |
| F | F18 | Curb stop valve, 1" diameter | 2 | EA | |
| F | F19 | Curb stop valve, 1 1/2" diameter | 2 | EA | |
| F | F20 | Curb stop valve, 2" diameter | 2 | EA | |
| F | F21 | Water gate valve, 2" diameter | 2 | EA | |
| F | F22 | Water gate valve, 3" diameter | 2 | EA | |
| F | F23 | Water gate valve, 4" diameter | 2 | EA | |
| F | F24 | Water gate valve, 6" diameter | 2 | EA | |
| F | F25 | Water gate valve, 8" diameter | 2 | EA | |
| F | F26 | Water gate valve, 10" diameter | 2 | EA | |
| F | F27 | Water gate valve, 12" diameter | 2 | EA | |
| F | F28 | Water gate valve, 16" diameter | 2 | EA | |
| F | F29 | Post indicator valve, 6" diameter | 2 | EA | |
| F | F30 | Post indicator valve, 8" diameter | 2 | EA | |
| F | F31 | Water gate casting and cover | 84 | VF | |
| F | F32 | Ductile iron fitting, 4" diameter | 2 | EA | |
| F | F33 | Ductile iron fitting, 6" diameter | 4 | EA | |
| F | F34 | Ductile iron fitting, 8" diameter | 4 | EA | |
| F | F35 | Ductile iron fitting, 10" diameter | 4 | EA | |
| F | F36 | Ductile iron fitting, 12" diameter | 2 | EA | |
| F | F37 | Ductile iron fitting, 16" diameter | 2 | EA | |
| F | F38 | Pipe coupling, 3" dia | 2 | EA | |
| F | F39 | Pipe coupling, 3" dia | 2 | EA | |
| F | F40 | Pipe coupling, 4" dia | 2 | EA | |
| F | F41 | Pipe coupling, 6" dia | 2 | EA | |
| F | F42 | Pipe coupling, 8" dia | 2 | EA | |
| F | F43 | Pipe coupling, 10" dia | 2 | EA | |
| F | F44 | Pipe coupling, 12" dia | 2 | EA | |
| F | F45 | Pipe coupling, 16" dia | 2 | EA | |
| F | F46 | Drill and tap unpressurized main ("dry tap") | 2 | EA | |
| F | F47 | Drill and tap pressurized main ("wet tap") <=8" | 2 | EA | |
| F | F48 | Drill and tap pressurized main ("wet tap") > 8" | 2 | EA | |
| F | F49 | Pressure testing, sanitizing and lab analysis | 3 | EA | |
| F | F50 | Fire hydrant | 2 | EA | |
| F | F51 | Relocate fire hydrant | 2 | EA | |
| F | F52 | 6" Fire Hydrant Extension Kit | 2 | EA | |
| F | F53 | 12" Fire Hydrant Extension Kit | 2 | EA | |
| F | F54 | 18" Fire Hydrant Extension Kit | 2 | EA | |
| F | F55 | 24" Fire Hydrant Extension Kit | 2 | EA | |
| F | F56 | Temporary By-Pass Piping | 600 | LF | |
| G - GAS | |||||
| G | G01 | Install 1 inch Gas Line | 56 | LF | |
| G | G02 | Install 2 inch Gas Line | 56 | LF | |
| G | G03 | Install 3 inch Gas Line | 56 | LF | |
| G | G04 | Install 4 inch Gas Line | 56 | LF | |
| G | G05 | Install 6 inch Gas Line | 17 | LF | |
| G | G06 | Install 1 inch Gas Valve | 2 | EA | |
| G | G07 | Install 2 inch Gas Valve | 2 | EA | |
| G | G08 | Install 3 inch Gas Valve | 2 | EA | |
| G | G09 | Install 4 inch Gas Valve | 2 | EA | |
| G | G10 | Install 6 inch Gas Valve | 2 | EA | |
| G | G11 | Install Valve Box | 2 | EA | |
| H - SEWER | |||||
| H | H01 | Clean and inspect sewer lines 12" and under | 340 | LF | |
| H | H02 | Clean and inspect sewer lines over 12" | 340 | LF | |
| H | H03 | PVC sewer pipe, 4" | 84 | LF | |
| H | H04 | PVC sewer pipe, 6" | 84 | LF | |
| H | H05 | PVC sewer pipe, 8" | 170 | LF | |
| H | H06 | PVC sewer pipe, 10" | 50 | LF | |
| H | H07 | PVC sewer pipe, 12" | 50 | LF | |
| H | H08 | PVC sewer pipe, 15" | 56 | LF | |
| H | H09 | PVC sewer pipe, 18" | 56 | LF | |
| H | H10 | PVC service connection, 4" | 2 | LF | |
| H | H11 | PVC service connection, 6" | 2 | LF | |
| H | H12 | PVC service connection, 8" | 2 | LF | |
| H | H13 | PVC wye/tee connection, 4" | 2 | EA | |
| H | H14 | PVC wye/tee connection, 6" | 2 | EA | |
| H | H15 | PVC wye/tee connection, 8" | 2 | EA | |
| H | H16 | PVC wye/tee connection, 10" | 2 | EA | |
| H | H17 | PVC wye/tee connection, 12" | 2 | EA | |
| H | H18 | PVC wye/tee connection, 15" | 1 | EA | |
| H | H19 | PVC wye/tee connection, 18" | 1 | EA | |
| H | H20 | PVC Chimney, 4" | 9 | VF | |
| H | H21 | PVC Chimney, 5" | 9 | VF | |
| H | H22 | PVC Chimney, 6" | 9 | VF | |
| H | H23 | Resinous liner, 6" | 84 | LF | |
| H | H24 | Resinous liner, 8" | 84 | LF | |
| H | H25 | Resinous liner, 10" | 84 | LF | |
| H | H26 | Resinous liner, 12" | 84 | LF | |
| H | H27 | Resinous liner, 15" | 50 | LF | |
| H | H28 | Resinous liner, 18" | 50 | LF | |
| H | H29 | Pipe bursting, 6" | 50 | LF | |
| H | H30 | Pipe bursting, 8" | 84 | LF | |
| H | H31 | Pipe bursting, 10" | 84 | LF | |
| H | H32 | Pipe bursting, 12" | 84 | LF | |
| H | H33 | Pipe bursting, 15" | 56 | LF | |
| H | H34 | Pipe bursting, 18" | 17 | LF | |
| H | H35 | Drop connection, any size | 8 | LF | |
| H | H36 | Tree root removal | 170 | LF | |
| H | H37 | Clean sewer manhole | 7 | EA | |
| H | H38 | Repair structure - trough | 7 | EA | |
| H | H39 | Sewer manhole, 4' diameter | 20 | VF | |
| H | H40 | Sewer manhole, 5' diameter | 20 | VF | |
| H | H41 | Sewer manhole, 6' diameter | 20 | VF | |
| H | H42 | Sanitary Sewer Cleanout | 4 | EA | |
| J - STORM DRAINAGE | |||||
| J | J01 | Catchbasin/manhole, 4' diameter | 20 | VF | |
| J | J02 | Catchbasin/manhole, 5' diameter | 20 | VF | |
| J | J03 | Catchbasin/manhole, 6' diameter | 20 | VF | |
| J | J04 | Catchbasin casting and cover | 4 | EA | |
| J | J05 | Manhole casting and cover | 4 | EA | |
| J | J06 | Clean and adjust structure | 4 | EA | |
| J | J07 | Deepen structure | 4 | VF | |
| J | J08 | Repair structure | 4 | VF | |
| J | J09 | Reinforced concrete pipe, 12" dia | 54 | LF | |
| J | J10 | Reinforced concrete pipe, 18" dia | 54 | LF | |
| J | J11 | Reinforced concrete pipe, 24" dia | 54 | LF | |
| J | J12 | PVC drain pipe, 6" dia | 54 | LF | |
| J | J13 | PVC drain pipe, 8" dia | 54 | LF | |
| J | J14 | PVC drain pipe, 12" dia | 54 | LF | |
| J | J15 | PVC drain pipe, 15" dia | 54 | LF | |
| J | J16 | PVC drain pipe, 18" dia | 54 | LF | |
| J | J17 | PVC drain pipe, 21" dia | 54 | LF | |
| J | J18 | PVC drain pipe, 24" dia | 54 | LF | |
| J | J19 | Foundation drain, 4” diameter | 37 | LF | |
| J | J20 | Foundation drain, 6” diameter | 37 | LF | |
| J | J21 | Foundation drain, 8” diameter | 37 | LF | |
| J | J22 | Existing storm drain pipe cleaning | 50 | LF | |
| J | J23 | Existing storm structure cleaning | 2 | EA | |
| J | J24 | Wattles | 524 | LF | |
| K - ELECTRICAL AND COMMUNICATIONS | |||||
| K | K01 | Utility conduit, 4” diameter | 340 | LF | |
| K | K02 | Conduit stub, 4” diameter | 37 | LF | |
| K | K03 | Conduit radius sweep, 4” diameter | 37 | LF | |
| K | K04 | 4"-22 degree bends | 9 | EA | |
| K | K05 | 4"-45 degree bends | 9 | EA | |
| K | K06 | 4"-90 degree bends | 9 | EA | |
| K | K07 | Utility conduit, 2” diameter | 340 | LF | |
| K | K08 | Conduit radius sweep, 2” diameter | 170 | LF | |
| K | K09 | 2" bends | 250 | EA | |
| K | K10 | Conduit Connectors | 250 | EA | |
| K | K11 | Telephone Manhole | 2 | EA | |
| K | K12 | Electric Switch Vault | 2 | EA | |
| K | K13 | Electric Manhole | 2 | EA | |
| K | K14 | Conduit Spacers | 840 | EA | |
| K | K15 | 4" PVC Access Fitting, Type LB | 5 | EA | |
| K | K16 | 2" PVC Access Fitting, Type LB | 4 | EA | |
| K | K17 | Internal conduit divider, flexible | 84 | LF | |
| K | K18 | Fiberglass Handhole | 4 | EA | |
| K | K19 | Handhole, 4’ x 4’ x 4’ | 2 | EA | |
| K | K20 | Concrete encasement | 2 | CY | |
| K | K21 | Light Pole Base | 9 | EA | |
| K | K22 | Lighting Fixture, Direct Arm | 9 | EA | |
| K | K23 | Lighting Fixture, Adjustable Arm | 9 | EA | |
| K | K24 | Lighting Fixture, Cobrahead | 9 | EA | |
| K | K25 | Lighting Fixture, Post Top | 9 | EA | |
| K | K26 | Light pole, 30' | 9 | EA | |
| K | K27 | Light Pole, 20' | 9 | EA | |
| K | K28 | LED type A lighting fixture | 2 | EA | |
| K | K29 | LED type A2 lighting fixture | 2 | EA | |
| K | K30 | LED type B lighting fixture | 2 | EA | |
| K | K31 | LED type B2 lighting fixture | 2 | EA | |
| K | K32 | LED type C lighting fixture | 2 | EA | |
| K | K33 | LED type D lighting fixture | 2 | EA | |
| K | K33 | LED type E lighting fixture | 2 | EA | |
| K | K34 | LED type G lighting fixture | 2 | EA | |
| K | K35 | LED type K lighting fixture | 2 | EA | |
| K | K36 | LED type M lighting fixture | 2 | EA | |
| K | K37 | LED type W lighting fixture | 2 | EA | |
| K | K38 | LED type BN lighting fixture | 2 | EA | |
| K | K38 | LED type EN lighting fixture | 2 | EA | |
| K | K40 | LED type GN lighting fixture | 2 | EA | |
| K | K41 | LED type LN lighting fixture | 2 | EA | |
| K | K42 | LED type DN lighting fixture | 2 | EA | |
| K | K50 | Light Pole, 10' | 2 | EA | |
| K | K43 | Light Pole, 20' for DN fixture | 2 | EA | |
| K | K44 | Light Pole 30' | 2 | EA | |
| K | K45 | Provide #2 THWN copper conductors | 2 | EA | |
| K | K46 | Provide #6 THWN copper equipment ground conductors | 2 | EA | |
| K | K47 | Remove and Reset Light Pole Fixtures | 1 | EA | |
| K | K48 | Photo Sensor | 1 | EA | |
| K | K49 | Wiring for New Conduits | 140 | LF | |
| L - LANDSCAPING | |||||
| L | L01 | Loam | 120 | CY | |
| L | L02 | Seeding, by hand | 7,067 | SF | |
| L | L03 | Seeding, by hydroseed | 500 | SF | |
| L | L04 | Red Hemlock mulch | 9 | CY | |
| L | L05 | Weed check mat | 37 | SY | |
| L | L06 | Filter fabric | 37 | SY | |
| L | L07 | Move shrub, 12" root ball | 2 | EA | |
| L | L08 | Move shrub, 24" root ball | 2 | EA | |
| L | L09 | Move tree, 36" root ball | 2 | EA |