64799_Bldg_1728_SOW.docx

DOCX document 41 KB Posted

Attached to
Install Floor Outlets Federal contract opportunity
Solicitation number
FA2835-14-R-0023
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Install Floor Outlets, newest first.
File Type Posted
Tile_and_Mastic_report.pdf PDF
QA's_for_1728_Conduit_Run_(2).docx DOCX document
B1728_Drawing_for_Conduit_Run.pdf PDF
Amendment_1.pdf PDF
Solicitation_Doc.pdf PDF
Bid_Schedule_.xlsx XLSX spreadsheet
DBA_Wage_Rates.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Install Floor Outlets in Classrooms Location: Building 1728 By: Roland Hartz

WORK ORDER NUMBER: 64799

DATED: 28 May 2014

1. GENERAL INFORMATION:

This project is intended to Install Floor Outlets in Classrooms in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply.

2. SCOPE: Install Floor Outlets in Classrooms, maintain redlines and provide panel schedule

· Prior to the start of work coordinate work schedule with the requester, Stephan Ramos 5-5936 or Debbie Billings 5-5948. Classroom work must be scheduled around class schedule. Some work may need to be done on off hours or weekends.

· Install new 100 amp. power panel (3ph/208/120v/27 space) complete with all necessary breakers, wiring, fittings and connections from existing building power to the crawlspace 18x18x8 power pull can and then to floor outlets.

· Classroom G Outlets: Each floor box to include three duplex receptacles and LAN empty conduit outlet using Legrand EFB6S floor box with EFB610BTCBK cover or equivalent centered on each of the 8 table locations. Provide MC Cable power wiring from crawlspace power pull can to each floor box receptacle. Provide LAN empty PVC conduit distribution with pull string from the Data closet to each classroom floor box. Data wiring, outlets and connections by others. Floor boxes to be recessed into the floor with surface solid covers on existing carpet.

· Classroom H Outlets: Each floor box to include three duplex receptacles and LAN empty conduit outlet using Legrand EFB6S floor box with EFB610BTCBK cover or equivalent centered on each of the 8 table locations. Provide MC Cable power wiring from crawlspace power pull can to each floor box receptacle. Provide LAN empty PVC conduit distribution with pull string from the Data closet to each classroom floor box. Data wiring, outlets and connections by others. Floor boxes to be recessed into the floor with surface solid covers on existing carpet.

· Classroom I Outlets: Remove carpet and base and replace with new carpet tile and base after floor box installation and new concrete is set. Saw cut and remove concrete to make trenches to accommodate floor boxes, 1” power and 2” data conduits from crawl space pull cans to each floor box. Foundation wall shall need to be drilled or cored at trench locations to allow conduits to pass through. Each floor box to include three duplex receptacles and LAN empty conduit outlet using Legrand EFB6S floor box with EFB610BTCBK or equivalent cover centered on each of the 8 tables or . Floor boxes to be securely set in position and conduits connected prior to infilling the trenches with concrete. Concrete to have wire mesh, vapor barrier and be trowel finished flush with existing floor and cured with curing compound. Provide MC cable power wiring from crawlspace power pull can to second pull can outside of Classroom I. Convert MC cable to conduit and wire from second pull can to each floor box receptacle. Provide LAN empty PVC conduit distribution with pull string from the Data closet to each floor box. Data wiring, outlets and connections by others. Floor boxes to be recessed into the floor with surface solid covers on carpet.

***Quote power only and classroom I, list classroom G&H as options*** ****Period of performance will be 60 day’s****

3. GENERAL REQUIREMENTS:

Work includes, but is not limited to the following:

a. Provide resolutions of any technical problems that arise during the construction.

b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.

c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.

4. ADMINISTRATION:

Points of Contact (POC):

Lead: Roland HartzPhone Number (781) 225-2951