Q A from Site Visit
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment.doc | DOC document | |
| 65423_bldg_1201_replace_O2_and_CO_REV.docx | DOCX document | |
| RFP.pdf | ||
| DBA_Wages.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 1201 Site Visit Q&A
Q: Can the contractor shut down the boilers during work?
A: With Hanscom Civil Engineering coordination
Q: What do the boilers use for fuel?
A: The boilers use a combination of natural gas and #6 oil
Q: Does the contractor need to calibrate for just the #3 boiler, or all four boilers?
A: All four boilers will need to be calibrated.
Q: Will the contractor themselves have to shut down or turn on the boilers during work?
A: No. Hanscom Civil Engineering personnel will coordinate shutting down and turning on the boilers.