65423_bldg_1201_replace_O2_and_CO_REV.docx

DOCX document 39 KB Posted

Attached to
Replace CO and O2 Sensors Federal contract opportunity
Solicitation number
FA2835-14-R-0013
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Revised Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Replace CO and O2 Sensors, newest first.
File Type Posted
Solicitation_Amendment.doc DOC document
Building_1201_Site_Visit_QandA.docx DOCX document
RFP.pdf PDF
DBA_Wages.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

For Replace the O2 and CO Sensors on all 4 Boilers.

Location: Building: 1201 By: Lenore Gerossie

WORK ORDER NUMBER: 65423

DATED: 25 April 2014

1. GENERAL INFORMATION:

This project is intended to replace the O2 and CO sensors on all 4 boilers in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply.

2. SCOPE: Replace the O2 and CO sensors on all four boilers

· Remove and replace the controller for O2 and CO sensors on Boiler 3

· Replace the LCD display on Boiler 4

· Install new probes to each boiler

· Calibrate all 4 units

· Send broken LCD to ABB for analysis and return results to CE

· Civil Engineering will shut down and start the boilers

· Base estimate on two trips to work on two boilers at time, provide pricing if more than two trips will be needed

· Schedule will need to be provided after award of contract. CE requires a notice to shut down boilers.

3. GENERAL REQUIREMENTS:

Work includes, but is not limited to the following:

a. Provide resolutions of any technical problems that arise during the construction.

b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.

c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.

4. ADMINISTRATION:

Points of Contact (POC):

POC: Roland HartzPhone Number. (781) 225-2951
POC: Bill NeicePhone Number. (781) 225-6157