SV2 MFR.pdf
PDF 41 KB Posted
- Attached to
- Bldg 85 Conex Farm Fiber Installation Federal contract opportunity
- Solicitation number
- FA282325Q0039
About this file
This document is a Memorandum for Record (MFR) documenting the second site visit for the Bldg 85 Connex Farm Fiber Installation project (Solicitation FA2823-25-Q-0039). Key details from the site visit include confirmation that wall-mounted cabinets have power and are grounded, a 4" dedicated conduit exists between outdoor pull boxes, and a minimum of 10 feet of fiber slack is required before going into the rack. The contractor will be responsible for adding wall jacks and running contractor-supplied patch panels, with cable lengths for each Connex run specified in previous RFI responses.
Additional notable points include the acceptance of a PDF format for as-built documentation and a correction regarding Max Cell requirements in the conduit, which contradicts previous RFI responses. The site visit minutes were signed by Kristina B. Brannon, the Contracting Officer, on 17 July 2025, and provide clarification on technical specifications and installation requirements for potential offerors bidding on this fiber installation project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs 22 Jul 25.pdf | ||
| RFIs 21 Jul 25.pdf | ||
| RFIs 17 Jul 25.pdf | ||
| 25Q0039-0004.pdf | ||
| SV MFR.pdf | ||
| RFIs 22 May 25.pdf | ||
| Att 2 96_CS Cyber Infrastructure Standards Installation Specs_Jan 2024.pdf | ||
| 25Q0039-0003.pdf | ||
| Att 1 PWS 20 May 25.pdf | ||
| 25Q0039-0002.pdf | ||
| Att 3 WD 15-4531 Rev 30.txt | TXT text file | |
| RFIs 24 Apr 25.pdf | ||
| Att 5 B85 Site Visit Meeting Location.jpg | JPG image | |
| 25Q0039-0001.pdf | ||
| Att 1 PWS 11 Apr 25.pdf | ||
| Att 4 FA282325Q0039.pdf | ||
| Att 3 WD 15-4531 Rev 29.txt | TXT text file | |
| Att 2 96_CS Cyber Infrastructure Standards Installation Specs_Feb 2025.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
17 July 2025
MEMORANDUM FOR RECORD
SUBJECT: F A2823-25-Q-0039- Bldg 85 Connex Fa1m Fiber Install Site Visit Meeting Minutes
1. The following notes were taken at the second site visit held on 16 July 2025:
-The wall mounted cabinets have power and are grounded. The busbar is already there.
-There is now a 4" dedicated conduit between outdoor pull boxes.
-The minimum slack required for the fiber is 10 feet before going into rack.
- Conduit locations are on the drawings attachment I.
-The 80 drops referred to in the PWS are the jacks on the wall.
- Contractor will add the jacks on the wall and nm Contractor supplied patch panels. (See paragraph 2.2 & 2.4).
-The cable lengths for each Conex nm is in the RFI responses #2 and #18. Offerors should utilize those numbers, unless you have found an inconsistency that should be addressed in an RFI.
-There is no fo1mat for the as-builts; a pdf suffices.
- Max Cell is not required in the conduit. This contradicts previous RFI response# 12 & 13 so those have been coITected in the latest RFis.
BRANNO���llyJ_gnOdby
NA.BELL.-==·KRJSTINA.BELL-
Date: 2025.07.17 14:20:43 -05'00'
KRISTINA B. BRANNON
Contracting Officer