QandA_FA2823-22-Q-A001_29Oct21.pdf

PDF 144 KB Posted

Attached to
Power Converter Installation
Solicitation number
FA2823-22-Q-A001
Issued by

View the file

Other files

File Type Posted
QandA_FA2823-22-Q-A001_02Nov21.pdf PDF
FCX_KVA-Vertical-Brochure_Final.pdf PDF
Atch1SOW_v2.pdf PDF
Atch2_SiteVisitNotification.pdf PDF
Combo_FA2823-22-Q-A001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ FA2823-22-Q-A001

GWEF Power Converter Install

Q&A 29 October 2021

Question 1: Wanted to clarify that the 400 hertz power converter will be provided at the location.

Answer 1: Correct, this is already on-site.

Question 1a: And that the

• 125A 3 pole 480V circuit breaker

• Input circuit from existing switchboard to new converter termination on input circuit breaker within the converter

• 600A rated parallel output circuit

• Lot conduit, boxes, hardware, conductors and misc. hardware will not be provided?

Answer 1a: Correct, this will not be provided by the user.

File details come from the government source that posted it. Updated .