Text version
FA282321Q4004 Culverts Questions and Answers
Question 1: What is the end use?
Answer: Is to lay across a road for vehicle traffic to cross over and water to flow through it.
Question: 2: Will these be used in ground or above?
Answer: Yes in the ground.
Question 3: Will they be connected to make larger pipes?
Answer: No.
Question 4: Are they aware the ends on the 50 Ft pipes can NOT be rerolled?
Answer: Yes we do know this, pipe must be in the lengths specified. All pipes will stand alone.
Question 5: Will they need connecting bands?
Answer: No
Question 6: What is AASHTO-444? our engineers have never heard of this. Is it a typo?
Answer: This is not a typo, when culverts are over a specified length, they are classified as a bridge.
Question 7: Do you require couplers?
Answer: No
Question 8: If no couplers the ends won't have nuts and bolts.
Answer: The flare/duckbill end sections should have bolts and such.
Question 9: Are these being delivered to one location?
Answer: Yes