STATEMENT OF WORK

FOR

33 FW Wheel and Tire Shop Aircraft Parts Washer, Bldg. 1417 12 July 2019

1. SCOPE:

The project is located at Eglin AFB, Florida, 33rd Fighter Wing, building 1417. The Clean Products Inc. parts washer model HD-4848-HP-SS that is currently installed in building 1417 requires removal/transport/disposal. The contractor is responsible for all labor and equipment associated with removing and transporting the old Clean Products Inc. parts washer model HD- 4848-HP-SS. The replacement StingRay 3032 Aircraft Wheel Washer or equal product requires purchase and installation. The new aircraft wheel washer equipment should be sized to operate on the existing electrical circuit to the current parts washer. The current circuit is 480 volts, 3-phase, fed from panel P4 in room 211 and is protected by a 100 amp circuit breaker. The circuit consists of 3 #1 power conductors plus a #8 ground in 1.5” conduit terminating in a 100 amp non-fused disconnect. The current aircraft parts washer is then fed from this disconnect. If the new aircraft parts washer equipment can’t use the existing circuit, then it is the contractor’s responsibility to properly size and install the required circuit components to power the new equipment from panel P4 in room 211. This new StingRay 3032 Aircraft Parts Washer or equal product will be installed in the same location as the existing The Clean Products Inc. parts washer model HD-4848-HP-SS, therefore, the old aircraft wheel washer must be removed first.

The contractor is responsible for all labor and equipment associated with the transport and installation of the new StingRay 3032 Aircraft Wheel Washer or equal product. Tooling required for removal of the old parts washer and install of the new parts washer will not be provided by the 33rd MXS. All previously mentioned expenses must be included and itemized in the contractor bid.

2. REQUIREMENT: StingRay 3032 Aircraft Wheel Washer OR EQUAL PRODUCT

StingRay 3032 Aircraft Wheel Washer The StingRay 3032 Aircraft Wheel Washer is designed to completely remove grease, oil, rubber bead and related soils from F35 aircraft wheels in 8 minutes or less. Machine equipped with 30 Horsepower StingRay Simplex Pump System with electric heating system. Swing Door Design for Maximum Turntable access with 1000 lb. capacity. No special foundation required. Complete process-washer, chemical, training, and know how.

Accessories include:

- Oscillating Power Blast Manifold

- 30 HP Stainless Steel Appointed Simplex Pump System with Viton Seals

- Electric Heating System

- Stainless Steel Cabinet & Wetted Standard Components

- Stainless Steel Remote Grease Fittings

- Stainless Steel Engineered Wheel Wash Power Blast Manifold

- Automatic Fresh Water Rinse System

- Automatic Ail Skimmer

- Automatic Steam Exhaust

- Steam Exhaust PVC Kit

- Stainless Steel Internal Reservoir Cover

- Turntable Anchoring Attachment & Fixture Kit

- Industrial Control Package

- Maintenance Kit

3. DIMENSIONS (L x W x H):

67 x 66 x 78 inches (Parts Washer)

4. ELECTRICAL

Provide all labor and materials to disconnect and remove the existing parts washer. Reuse the existing circuit to power the new equipment, if possible, or install the required electrical circuit from panel P4 (room 211) to a properly sized non-fused disconnect mounted adjacent to the equipment. Existing circuit breakers, conductors, conduit, and non-fused disconnect can be re-used by the contractor as long as they are the required size/rating IAW the manufacturer’s specifications/latest edition of the National Electrical Code (NEC). This circuit shall be installed in electric metallic conduit (EMT), and the conductors, conduit, and circuit breaker shall be sized IAW manufacturer’s specifications/latest edition of the National Electrical Code (NEC).

Install the circuit from the non-fused disconnect switch to the parts washer. This circuit shall be installed in EMT conduit with a final transition of no more than 6’ liquidtight, flexible metal conduit using compression fittings appropriate to the installation, to make the final connection to the new equipment. Both the conductors and conduit shall be sized IAW manufacturer’s specifications/latest edition of the NEC.

OTHER ELECTRICAL SPECIFICATIONS:

Contractor shall perform all investigative and design services to verify where they will get power to feed the new equipment, which include all material required and method of installation

Final installation shall comply with the manufacturer’s recommended instructions and standards.

Install all necessary components to make this a complete and operational system and by all appropriate codes and standards.

All insulated type wire shall be THHN/THWN copper Only use compression fittings for EMT conduit. Connectors using set screws are not allowed.

Contractor must field verify the voltage, amperage, wire size, transformer size, measurements, etc.

Ensure electrical work is completed per the latest edition of the National Electrical Code.

Ensure new electrical work is grounded and bonded per the latest edition of the National Electrical Code Ensure Design and Installation meet all requirements of UFC 3-600-01 and all applicable NFPA standards Ensure compliance with the Eglin AFB specific base electrical requirements.

All branch circuits shall have their own neutral conductor, no sharing of the neutral conductor.

The Contractor shall repair any openings in electrical boxes, panels, cabinets, etc. when the opening is created by the Contractor removing something or not using an opening they created Any holes created by the Contractor through the wall, floor, ceiling, etc. for installation or removal of conduit, pipe, duct, etc. needs to be repaired to seal the opening with appropriate material to meet any appropriate code requirements.

5. POINT OF CONTACT:

Madison Cotton at madison.cotton@us.af.mil

6. CHANGES TO THE SOW:

No changes to this SOW will be allowed without the Contracting Officer consent.