RFI_9_Sept_13.pdf

PDF 30 KB Posted

Attached to
Replace Generator, Bldg 440 Eglin AFB Federal contract opportunity
Solicitation number
FA2823-13-R-4016
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Questions and Answers dated 9 September 2013.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Generator, Bldg 440 Eglin AFB, newest first.
File Type Posted
Sketch.pdf PDF
FA2823-13-R-4016.pdf PDF
FA2823-13-R-4016_Amendment_2.pdf PDF
REV_STATEMENT_OF_WORK__FTFA_13-1125.pdf PDF
FA2823-13-R-4016_Amendment_3.pdf PDF
Sketch__1.pdf PDF
Site_Visit_Sign_in_sheet.pdf PDF
RFI.pdf PDF
FA2823-13-R-4016-01.pdf PDF
EAFB_Form_90_(FINAL).xfdl XFDL file
Affidavit_9_Jul_13.pdf PDF
FA2823-13-R-4016.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information 9 September 2013

Question: 1. What is the manufacture type of generator that is being replaced?

Response: Onan

Question: 2. Please provide the Fuel Capacity or estimated Run Time required for the new Generator.

Response: Provide 13 hours of run time for a 100% standby load.

3. Amendment 1 states e-mailed quote is acceptable. Please confirm this is correct and that 1 e-mailed bid package is acceptable.

Response: Yes, proposals can be hand carried, mailed or emailed to Velmandria.sylvester@us.af.mil.

Please include the solicitation number FA2823-13-R-4016 in the subject for all email correspondence.

4. Please confirm that a bid bond is not required and that only Performance and payment bond is required.

Response: No, a bid bond is not required. Yes, Performance and payment bonds are required.

5. Can concrete be used to patch back asphalt cut from the new Generator to the exterior wall.

Response: Yes, use concrete

6. Is the existing Generator operational and if it is can it be removed prior to the new Generator arriving.

Response: Existing generator is not in working order and therefore it can be removed prior to the new generator arriving.