Tab 20 - Solicitation.doc

DOC document 2 MB Posted

Attached to
PAVING INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT, EGLIN AFB, FL Federal contract opportunity
Solicitation number
FA2823-08-R-0007
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Solicitation - Paving IDIQ

View the file

Other files for this federal contract opportunity

Other files attached to PAVING INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT, EGLIN AFB, FL, newest first.
File Type Posted
Tab 2 IDIQ Pave Spec 081002.doc DOC document
Tab 20 Attachment 15 —

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lump Sum

Paving IDIQ (Base Year)

FFP

Furnish all plant, labor, materials, and equipment, and perform all operations in connection with Paving (Indefinite Delivery Indefinite Quantity Contract), Eglin AFB FL in accordance with Specifications FTFA 08-1002, dated 07 Oct 07. SEE SCHEDULE "B" - PRICE SCHEDULE FOR PRICES.

Period of Performance is 365 calendar days after receipt of award.

FOB: Destination

SIGNAL CODE: A

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lump Sum
OPTION
Paving IDIQ (First Option Year)

FFP

Furnish all plant, labor, materials, and equipment, and perform all operations in connection with Paving (Indefinite Delivery Indefinite Quantity Contract), Eglin AFB FL in accordance with Specifications FTFA 08-1002, dated 07 Oct 07. SEE SCHEDULE "B" - PRICE SCHEDULE FOR PRICES.

Period of Performance is 365 calendar days after expiration of base year.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lump Sum
OPTION
Paving IDIQ (Second Option Year)

FFP

Furnish all plant, labor, materials, and equipment, and perform all operations in connection with Paving (Indefinite Delivery Indefinite Quantity Contract), Eglin AFB FL in accordance with Specifications FTFA 08-1002, dated 07 Oct 07. SEE SCHEDULE "B" - PRICE SCHEDULE FOR PRICES.

Period of Performance is 365 calendar days after expiration of first option year.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lump Sum
OPTION
Paving IDIQ (Third Option Year)

FFP

Furnish all plant, labor, materials, and equipment, and perform all operations in connection with Paving (Indefinite Delivery Indefinite Quantity Contract), Eglin AFB FL in accordance with Specifications FTFA 08-1002, dated 07 Oct 07. SEE SCHEDULE "B" - PRICE SCHEDULE FOR PRICES.

Period of Performance is 365 calendar days after expiration of second option year.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lump Sum
OPTION
Paving IDIQ (Fourth Option Year)

FFP

Furnish all plant, labor, materials, and equipment, and perform all operations in connection with Paving (Indefinite Delivery Indefinite Quantity Contract), Eglin AFB FL in accordance with Specifications FTFA 08-1002, dated 07 Oct 07. SEE SCHEDULE "B" - PRICE SCHEDULE FOR PRICES.

Period of Performance is 365 calendar days after expiration of third option year.

MAX

CLAUSES INCORPORATED BY FULL TEXT

A201. LINE ITEMS

THE FOLLOWING CONTRACT LINE ITEMS AND PRICE SCHEDULES ARE FIRM FIXED PRICE: 0001 THROUGH 4058.

UNIT PRICE SCHEDULE

IDIQ Paving, FTFA 08-1002 BASIC YEAR QUANTITIES

ITEM NO.
DESCRIPTION
EST QTY
UNIT
UNIT PRICE
EST AMT
0001
MILL ASPHALT
0001AA
0-2500
2500
SY
0001AB
2501-10000
3000
SY
0001AC
10001+
11000
SY
0002
ROUGH GRADING
0002AA
0-2500
2500
SY
0002AB
2501-10000
3000
SY
0002AC
10000+
11000
SY
0003
FINE GRADING ROADS/PARK LOT
0003AA
0-2500
2500
SY
0003AB
2501-10000
3000
SY
0003AC
10001+
11000
SY
0004
FINE GRADING S/W & CART PATHS
0004AA
0-500
500
SY
0004AB
501-5000
4000
SY
0004AC
5001+
6000
SY
0005
FIND GRADING SWALES/DRAINAGE
0005AA
0-2500
1000
SY
0005AB
2501-10000
3000
SY
0005AC
10001+
11000
SY
0006
6" GRADED AGGREGATE (GAB) IN PLACE
0006AA
0-2500
1000
SY
0006AB
2501-10000
3000
SY
0006AC
10001+
11000
SY
0007
COMP EXISTING SUBGRADE
0007AA
0-2500
2000
SY
0007AB
2500+
3000
SY
0008
COMPACT OF FILL SUBRADE & BASE
0008AA
0-2500
2000
SY
0008AB
2500+
3000
SY
0009
EXCAVATION, BULK
0009AA
0-2500
500
CY
0009AB
2501-10000
3000
CY
0009AC
10001+
11000
CY
0010
EXCAVATION, HAND
0010AA
EXCAVATION, HAND
100
CY
0011
FILL, COMMON EARTH
0011AA
0-500
500
CY
0011AB
500+
700
CY
0012
FILL, SELECT
0012AA
0-500
500
CY
0012AB
500+
700
CY
0013
SAWCUT ASPHALT
0013AA
0-500
500
LF
0013AB
500-1000
750
LF
0013AC
1001+
1200
LF
0014
BITUM PRIME COAT
0014AA
BITUM PRIME COAT
800
GAL
0015
BITUM TACK COAT
0015AA
BITUM TACK COAT
800
GAL
0016
ASPHALT IN PLACE COMPACTED
0016AA
Type SP 12.5 Traffic Level B 0-250
250
TON
0016AB
251-2000
1500
TON
0016AC
2001+
3000
TON
0017
TYPE SP 9.5 TRAFFIC LEVEL B
0017AA
0-250
250
TON
0017AB
251-2000
500
TON
0017AC
2001+
2500
TON
0018
TYPE SP 19.0 TRAFFIC LEVEL B
0018AA
0-250
250
TON
0018AB
251-2000
500
TON
0018AC
2001+
2500
TON
0019
ASPHALT FOR AIRFIELDS
0019AA
0-2000
2000
TON
0019AB
2001-6000
6000
TON
0019AC
6001+
100000
TON
0020
HAUL REMOVED MATERIALS OFF BASE
0020AA
0-100
100
CY
0020AB
101-1000
1000
CY
0020AC
1001+
2100
CY
0021
REMOVE CONCRETE
0021AA
UP TO 6" THICK
100
SY
0021AB
6-10" THICK
100
SY
0021AC
GREATER THAN 10" THICK
100
SY
0022
REMOVE SIDEWALK 4" THICK
0022AA
4 FEET WIDE
100
SY
0023
INSTALL CONC S/W 4INCH THICK
0023AA
0-100
75
SY
0023AB
101+
150
SY
0024
CONCRETE VEH PVMT 4" THICK
0024AA
0-50
50
SY
0024AB
50+
75
SY
0025
CONCRETE VEH PVMT 5" THICK
0025AA
0-50
50
SY
0025AB
51+
75
SY
0026
FL DOT TYPE F CURB
0026AA
0-50
50
LF
0026AB
50-500
250
LF
0026AC
501+
750
LF
0027
PCC PAVING 700 PSI FLEX 12" THICK
0027AA
0-100
100
SY
0027AB
101-1000
500
SY
0027AC
1001+
1500
SY
0028
EACH ADDITIONAL INCH
0028AA
0-100
100
SY
0028AB
101-1000
500
SY
0028AC
1001+
1500
SY
0029
EXPANSION JOINT MAT'L SILICONE
0029AA
0-1000
750
LF
0029AB
1001+
1500
LF
0030
PRE-FORMED ELASTOMERIC
0030AA
0-1000
750
LF
0030AB
1001+
1500
LF
0031
PAVEMENT MARKING PERM. REFLECTIVE
0031AA
0-2500
2000
SF
0031AB
2501-10000
7500
SF
0031AC
10001+
12000
SF
0032
PERMANENT NON-REFLECTIVE
0032AA
0-2500
2000
SF
0032AB
2501-10000
7500
SF
0032AC
10001+
12000
SF
0033
TEMPORARY REFLECTIVE
0033AA
0-2500
2000
SF
0033AB
2501-10000
7500
SF
0033AC
10001+
12000
SF
0034
TEMPORARY NON-REFLECTIVE
0034AA
0-2500
2000
SF
0034AB
2501-10000
7500
SF
0034AC
10001+
12000
SF
0035
MANHOLE COVER/DROP INLET COVER ADJUSMENT
0035AA
MANHOLE COVER/DROP INLET COVER ADJUSTMENT
10
EA
0036
VALVE BOX ADJUSTMENT
0036AA
VALVE BOX ADJUSTMENT
10
EA
0037
REFLECTIVE PAVEMENT MARKERS
0037AA
REFLECTIVE PAVEMENT MARKERS
500
EA
0038
TRAFFIC TURTLES
0038AA
TRAFFIC TURTLES
100
EA
0039
HEADWALL/DRAINAGE STRUCTURES
0039AA
HEADWALL/DRAINAGE STRUCTURES
200
CY
0040
DRAINAGE PIPE, RCP, IN PLACE
0040AA
18"
100
LF
0040AB
24"
100
LF
0040AC
36"
100
LF
0040AD
48"
100
LF
0041
DRAINAGE PIPE, CMP, IN PLACE
0041AA
18"
100
LF
0041AB
24"
100
LF
0041AC
36"
100
LF
0041AD
48"
100
LF
0042
DRAINAGE PIPE, HDPE, IN PLACE
0042AA
18"
100
LF
0042AB
24"
100
LF
0042AC
36"
100
LF
0042AD
48"
100
LF
0043
DEMOLISH ASPHALT PAVEMENT
0043AA
6" THICK
100
SY
0043AB
12" THICK
100
SY
0044
TRAFFIC MARKING REMOVAL
0044AA
0-2500
2500
SF
0044AB
2501-7500
6000
SF
0044AC
7501 - AND GREATER
8000
SF
0045
TRAFFIC MARKING LAYOUT
0045AA
0-2500
2500
SF
0045AB
2501-7500
6000
SF
0045AC
7501 - AND GREATER
8000
SF
0046
SAWCUT CONCRETE
0046AA
0-5"
100
LF
0046AB
GREATER THAN 5"
100
LF
0047
AIRCRAFT TIEDOWNS
0047AA
AIRCRAFT TIEDOWNS
25
EA
0048
EROSION CONTROL – RIPRAP & FABRIC
0048AA
RIPRAP MEETING FL DOT SECTION 530
100
TON
0048AB
TERRA TEX HD FILTER FABRIC
4000
SF
0049
REMOVE/REPLACE EXISTING BUMPER BLOCKS
0049AA
REMOVE/REPLACE EXISTING BUMPER BLOCKS
100
EA
0050
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
0050AA
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
100
EA
0051
PLACE/WATER SOD
0051AA
PLACE/WATER SOD
4000
SY
0052
SEEDING/WATERING
0052AA
SEEDING/WATERING
4000
SY
0053
RUNWAY PAINT REMOVAL
0053AA
2000-5000
3000
SF
0053AB
5001-15000
7500
SF
0053AC
15001+
16000
SF
0054
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
0054AA
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
10
EA
0055
RUNWAY RUBBER REMOVAL
0055AA
0-200,000
150,000
SF
0055AB
200,001-400,000
250,000
SF
0055AC
400,001-600,000
450,000
SF
0055AD
RUBBERIZED TOPPING
1000
SF
0056
SHEET PILES (INSTALLED)
0056AA
10' Steel Sheet Pile Panels 0-300
250
LF
0056AB
10' Steel Sheet Pile Panels <301
325
LF
0056AC
10' Fiberglass Sheet Pile Panels 0-300
250
LF
0056AD
10' Fiberglass Sheet Pile Panels <301
325
LF
0057
Highway Traffic Control Barriers (Jersey Barriers)
0057AA
10' Jersey Barriers 0-1000 (Installed)
950
LF
0057AB
10' Jersey Barriers 1001> (Installed)

LF

0058
NIGHT WORK/WEEKEND WORK
0058AA
NIGHT WORK/WEEKEND WORK
_____%
JB

TOTAL (CLINS 0001-0057AB) BASIC YEAR

BOND ____ %

TOTAL ESTIMATE

IDIQ Paving, FTFA 08-1002 OPTION YEAR 1 QUANTITIES

ITEM NO.
DESCRIPTION
EST QTY
UNIT
UNIT PRICE
EST AMT
1001
MILL ASPHALT
1001AA
0-2500
2500
SY
1001AB
2501-10000
3000
SY
1001AC
10001+
11000
SY
1002
ROUGH GRADING
1002AA
0-2500
2500
SY
1002AB
2501-10000
3000
SY
1002AC
10000+
11000
SY
1003
FINE GRADING ROADS/PARK LOT
1003AA
0-2500
2500
SY
1003AB
2501-10000
3000
SY
1003AC
10001+
11000
SY
1004
FINE GRADING S/W & CART PATHS
1004AA
0-500
500
SY
1004AB
501-5000
4000
SY
1004AC
5001+
6000
SY
1005
FIND GRADING SWALES/DRAINAGE
1005AA
0-2500
1000
SY
1005AB
2501-10000
3000
SY
1005AC
10001+
11000
SY
1006
6" GRADED AGGREGATE (GAB) IN PLACE
1006AA
0-2500
1000
SY
1006AB
2501-10000
3000
SY
1006AC
10001+
11000
SY
1007
COMP EXISTING SUBGRADE
1007AA
0-2500
2000
SY
1007AB
2500+
3000
SY
1008
COMPACT OF FILL SUBRADE & BASE
1008AA
0-2500
2000
SY
1008AB
2500+
3000
SY
1009
EXCAVATION, BULK
1009AA
0-2500
500
CY
1009AB
2501-10000
3000
CY
1009AC
10001+
11000
CY
1010
EXCAVATION, HAND
1010AA
EXCAVATION, HAND
100
CY
1011
FILL, COMMON EARTH
1011AA
0-500
500
CY
1011AB
500+
700
CY
1012
FILL, SELECT
1012AA
0-500
500
CY
1012AB
500+
700
CY
1013
SAWCUT ASPHALT
1013AA
0-500
500
LF
1013AB
500-1000
750
LF
1013AC
1001+
1200
LF
1014
BITUM PRIME COAT
1014AA
BITUM PRIME COAT
800
GAL
1015
BITUM TACK COAT
1015AA
BITUM TACK COAT
800
GAL
1016
ASPHALT IN PLACE COMPACTED
1016AA
Type SP 12.5 Traffic Level B 0-250
250
TON
1016AB
251-2000
1500
TON
1016AC
2001+
3000
TON
1017
TYPE SP 9.5 TRAFFIC LEVEL B
1017AA
0-250
250
TON
1017AB
251-2000
500
TON
1017AC
2001+
2500
TON
1018
TYPE SP 19.0 TRAFFIC LEVEL B
1018AA
0-250
250
TON
1018AB
251-2000
500
TON
1018AC
2001+
2500
TON
1019
ASPHALT FOR AIRFIELDS
1019AA
0-2000
2000
TON
1019AB
2001-6000
6000
TON
1019AC
6001+
100000
TON
1020
HAUL REMOVED MATERIALS OFF BASE
1020AA
0-100
100
CY
1020AB
101-1000
1000
CY
1020AC
1001+
2100
CY
1021
REMOVE CONCRETE
1021AA
UP TO 6" THICK
100
SY
1021AB
6-10" THICK
100
SY
1021AC
GREATER THAN 10" THICK
100
SY
1022
REMOVE SIDEWALK 4" THICK
1022AA
4 FEET WIDE
100
SY
1023
INSTALL CONC S/W 4INCH THICK
1023AA
0-100
75
SY
1023AB
101+
150
SY
1024
CONCRETE VEH PVMT 4" THICK
1024AA
0-50
50
SY
1024AB
50+
75
SY
1025
CONCRETE VEH PVMT 5" THICK
1025AA
0-50
50
SY
1025AB
51+
75
SY
1026
FL DOT TYPE F CURB
1026AA
0-50
50
LF
1026AB
50-500
250
LF
1026AC
501+
750
LF
1027
PCC PAVING 700 PSI FLEX 12" THICK
1027AA
0-100
100
SY
1027AB
101-1000
500
SY
1027AC
1001+
1500
SY
1028
EACH ADDITIONAL INCH
1028AA
0-100
100
SY
1028AB
101-1000
500
SY
1028AC
1001+
1500
SY
1029
EXPANSION JOINT MAT'L SILICONE
1029AA
0-1000
750
LF
1029AB
1001+
1500
LF
1030
PRE-FORMED ELASTOMERIC
1030AA
0-1000
750
LF
1030AB
1001+
1500
LF
1031
PAVEMENT MARKING PERM. REFLECTIVE
1031AA
0-2500
2000
SF
1031AB
2501-10000
7500
SF
1031AC
10001+
12000
SF
1032
PERMANENT NON-REFLECTIVE
1032AA
0-2500
2000
SF
1032AB
2501-10000
7500
SF
1032AC
10001+
12000
SF
1033
TEMPORARY REFLECTIVE
1033AA
0-2500
2000
SF
1033AB
2501-10000
7500
SF
1033AC
10001+
12000
SF
1034
TEMPORARY NON-REFLECTIVE
1034AA
0-2500
2000
SF
1034AB
2501-10000
7500
SF
1034AC
10001+
12000
SF
1035
MANHOLE COVER/DROP INLET COVER ADJUSMENT
10035AA
MANHOLE COVER/DROP INLET COVER ADJUSTMENT
10
EA
1036
VALVE BOX ADJUSTMENT
1036AA
VALVE BOX ADJUSTMENT
10
EA
1037
REFLECTIVE PAVEMENT MARKERS
1037AA
REFLECTIVE PAVEMENT MARKERS
500
EA
1038
TRAFFIC TURTLES
1038AA
TRAFFIC TURTLES
100
EA
1039
HEADWALL/DRAINAGE STRUCTURES
1039AA
HEADWALL/DRAINAGE STRUCTURES
200
CY
1040
DRAINAGE PIPE, RCP, IN PLACE
1040AA
18"
100
LF
1040AB
24"
100
LF
1040AC
36"
100
LF
1040AD
48"
100
LF
1041
DRAINAGE PIPE, CMP, IN PLACE
1041AA
18"
100
LF
1041AB
24"
100
LF
1041AC
36"
100
LF
1041AD
48"
100
LF
1042
DRAINAGE PIPE, HDPE, IN PLACE
1042AA
18"
100
LF
1042AB
24"
100
LF
1042AC
36"
100
LF
1042AD
48"
100
LF
1043
DEMOLISH ASPHALT PAVEMENT
1043AA
6" THICK
100
SY
1043AB
12" THICK
100
SY
1044
TRAFFIC MARKING REMOVAL
1044AA
0-2500
2500
SF
1044AB
2501-7500
6000
SF
1044AC
7501 - AND GREATER
8000
SF
1045
TRAFFIC MARKING LAYOUT
1045AA
0-2500
2500
SF
1045AB
2501-7500
6000
SF
1045AC
7501 - AND GREATER
8000
SF
1046
SAWCUT CONCRETE
1046AA
0-5"
100
LF
1046AB
GREATER THAN 5"
100
LF
1047
AIRCRAFT TIEDOWNS
1047AA
AIRCRAFT TIEDOWNS
25
EA
1048
EROSION CONTROL – RIPRAP & FABRIC
1048AA
RIPRAP MEETING FL DOT SECTION 530
100
TON
1048AB
TERRA TEX HD FILTER FABRIC
4000
SF
1049
REMOVE/REPLACE EXISTING BUMPER BLOCKS
1049AA
REMOVE/REPLACE EXISTING BUMPER BLOCKS
100
EA
1050
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
1050AA
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
100
EA
1051
PLACE/WATER SOD
1051AA
PLACE/WATER SOD
4000
SY
1052
SEEDING/WATERING
1052AA
SEEDING/WATERING
4000
SY
1053
RUNWAY PAINT REMOVAL
1053AA
2000-5000
3000
SF
1053AB
5001-15000
7500
SF
1053AC
15001+
16000
SF
1054
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
1054AA
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
10
EA
1055
RUNWAY RUBBER REMOVAL
1055AA
0-200,000
150,000
SF
1055AB
200,001-400,000
250,000
SF
1055AC
400,001-600,000
450,000
SF
1055AD
RUBBERIZED TOPPING
1000
SF
1056
SHEET PILES (INSTALLED)
1056AA
10' Steel Sheet Pile Panels 0-300
250
LF
1056AB
10' Steel Sheet Pile Panels <301
325
LF
1056AC
10' Fiberglass Sheet Pile Panels 0-300
250
LF
1056AD
10' Fiberglass Sheet Pile Panels <301
325
LF
1057
Highway Traffic Control Barriers (Jersey Barriers)
1057AA
10' Jersey Barriers 0-1000 (Installed)
950
LF
1057AB
10' Jersey Barriers 1001> (Installed)

LF

1058
NIGHT WORK/WEEKEND WORK
1058AA
NIGHT WORK/WEEKEND WORK
_____%
JB

TOTAL (CLINS 0001-0057AB) BASIC YEAR

BOND ____ %

TOTAL ESTIMATE

IDIQ Paving, FTFA 08-1002 OPTION YEAR 2 QUANTITIES

ITEM NO.
DESCRIPTION
EST QTY
UNIT
UNIT PRICE
EST AMT
2001
MILL ASPHALT
2001AA
0-2500
2500
SY
2001AB
2501-10000
3000
SY
2001AC
10001+
11000
SY
2002
ROUGH GRADING
2002AA
0-2500
2500
SY
2002AB
2501-10000
3000
SY
2002AC
10000+
11000
SY
2003
FINE GRADING ROADS/PARK LOT
2003AA
0-2500
2500
SY
2003AB
2501-10000
3000
SY
2003AC
10001+
11000
SY
2004
FINE GRADING S/W & CART PATHS
2004AA
0-500
500
SY
2004AB
501-5000
4000
SY
2004AC
5001+
6000
SY
2005
FIND GRADING SWALES/DRAINAGE
2005AA
0-2500
1000
SY
2005AB
2501-10000
3000
SY
2005AC
10001+
11000
SY
2006
6" GRADED AGGREGATE (GAB) IN PLACE
2006AA
0-2500
1000
SY
2006AB
2501-10000
3000
SY
2006AC
10001+
11000
SY
2007
COMP EXISTING SUBGRADE
2007AA
0-2500
2000
SY
2007AB
2500+
3000
SY
2008
COMPACT OF FILL SUBRADE & BASE
2008AA
0-2500
2000
SY
2008AB
2500+
3000
SY
2009
EXCAVATION, BULK
2009AA
0-2500
500
CY
2009AB
2501-10000
3000
CY
2009AC
10001+
11000
CY
2010
EXCAVATION, HAND
2010AA
EXCAVATION, HAND
100
CY
2011
FILL, COMMON EARTH
2011AA
0-500
500
CY
2011AB
500+
700
CY
2012
FILL, SELECT
2012AA
0-500
500
CY
2012AB
500+
700
CY
2013
SAWCUT ASPHALT
2013AA
0-500
500
LF
2013AB
500-1000
750
LF
2013AC
1001+
1200
LF
2014
BITUM PRIME COAT
2014AA
BITUM PRIME COAT
800
GAL
2015
BITUM TACK COAT
2015AA
BITUM TACK COAT
800
GAL
2016
ASPHALT IN PLACE COMPACTED
2016AA
Type SP 12.5 Traffic Level B 0-250
250
TON
2016AB
251-2000
1500
TON
2016AC
2001+
3000
TON
2017
TYPE SP 9.5 TRAFFIC LEVEL B
2017AA
0-250
250
TON
2017AB
251-2000
500
TON
2017AC
2001+
2500
TON
2018
TYPE SP 19.0 TRAFFIC LEVEL B
2018AA
0-250
250
TON
2018AB
251-2000
500
TON
2018AC
2001+
2500
TON
2019
ASPHALT FOR AIRFIELDS
2019AA
0-2000
2000
TON
2019AB
2001-6000
6000
TON
2019AC
6001+
100000
TON
2020
HAUL REMOVED MATERIALS OFF BASE
2020AA
0-100
100
CY
2020AB
101-1000
1000
CY
2020AC
1001+
2100
CY
2021
REMOVE CONCRETE
2021AA
UP TO 6" THICK
100
SY
2021AB
6-10" THICK
100
SY
2021AC
GREATER THAN 10" THICK
100
SY
2022
REMOVE SIDEWALK 4" THICK
2022AA
4 FEET WIDE
100
SY
2023
INSTALL CONC S/W 4INCH THICK
2023AA
0-100
75
SY
2023AB
101+
150
SY
2024
CONCRETE VEH PVMT 4" THICK
2024AA
0-50
50
SY
2024AB
50+
75
SY
2025
CONCRETE VEH PVMT 5" THICK
2025AA
0-50
50
SY
2025AB
51+
75
SY
2026
FL DOT TYPE F CURB
2026AA
0-50
50
LF
2026AB
50-500
250
LF
2026AC
501+
750
LF
2027
PCC PAVING 700 PSI FLEX 12" THICK
2027AA
0-100
100
SY
2027AB
101-1000
500
SY
2027AC
1001+
1500
SY
2028
EACH ADDITIONAL INCH
2028AA
0-100
100
SY
2028AB
101-1000
500
SY
2028AC
1001+
1500
SY
2029
EXPANSION JOINT MAT'L SILICONE
2029AA
0-1000
750
LF
2029AB
1001+
1500
LF
2030
PRE-FORMED ELASTOMERIC
2030AA
0-1000
750
LF
2030AB
1001+
1500
LF
2031
PAVEMENT MARKING PERM. REFLECTIVE
2031AA
0-2500
2000
SF
2031AB
2501-10000
7500
SF
2031AC
10001+
12000
SF
2032
PERMANENT NON-REFLECTIVE
2032AA
0-2500
2000
SF
2032AB
2501-10000
7500
SF
2032AC
10001+
12000
SF
2033
TEMPORARY REFLECTIVE
2033AA
0-2500
2000
SF
2033AB
2501-10000
7500
SF
2033AC
10001+
12000
SF
2034
TEMPORARY NON-REFLECTIVE
2034AA
0-2500
2000
SF
2034AB
2501-10000
7500
SF
2034AC
10001+
12000
SF
2035
MANHOLE COVER/DROP INLET COVER ADJUSMENT
20035AA
MANHOLE COVER/DROP INLET COVER ADJUSTMENT
10
EA
2036
VALVE BOX ADJUSTMENT
2036AA
VALVE BOX ADJUSTMENT
10
EA
2037
REFLECTIVE PAVEMENT MARKERS
2037AA
REFLECTIVE PAVEMENT MARKERS
500
EA
2038
TRAFFIC TURTLES
2038AA
TRAFFIC TURTLES
100
EA
2039
HEADWALL/DRAINAGE STRUCTURES
2039AA
HEADWALL/DRAINAGE STRUCTURES
200
CY
2040
DRAINAGE PIPE, RCP, IN PLACE
2040AA
18"
100
LF
2040AB
24"
100
LF
2040AC
36"
100
LF
2040AD
48"
100
LF
2041
DRAINAGE PIPE, CMP, IN PLACE
2041AA
18"
100
LF
2041AB
24"
100
LF
2041AC
36"
100
LF
2041AD
48"
100
LF
2042
DRAINAGE PIPE, HDPE, IN PLACE
2042AA
18"
100
LF
2042AB
24"
100
LF
2042AC
36"
100
LF
2042AD
48"
100
LF
2043
DEMOLISH ASPHALT PAVEMENT
2043AA
6" THICK
100
SY
2043AB
12" THICK
100
SY
2044
TRAFFIC MARKING REMOVAL
2044AA
0-2500
2500
SF
2044AB
2501-7500
6000
SF
2044AC
7501 - AND GREATER
8000
SF
2045
TRAFFIC MARKING LAYOUT
2045AA
0-2500
2500
SF
2045AB
2501-7500
6000
SF
2045AC
7501 - AND GREATER
8000
SF
2046
SAWCUT CONCRETE
2046AA
0-5"
100
LF
2046AB
GREATER THAN 5"
100
LF
2047
AIRCRAFT TIEDOWNS
2047AA
AIRCRAFT TIEDOWNS
25
EA
2048
EROSION CONTROL – RIPRAP & FABRIC
2048AA
RIPRAP MEETING FL DOT SECTION 530
100
TON
2048AB
TERRA TEX HD FILTER FABRIC
4000
SF
2049
REMOVE/REPLACE EXISTING BUMPER BLOCKS
2049AA
REMOVE/REPLACE EXISTING BUMPER BLOCKS
100
EA
2050
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
2050AA
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
100
EA
2051
PLACE/WATER SOD
2051AA
PLACE/WATER SOD
4000
SY
2052
SEEDING/WATERING
2052AA
SEEDING/WATERING
4000
SY
2053
RUNWAY PAINT REMOVAL
2053AA
2000-5000
3000
SF
2053AB
5001-15000
7500
SF
2053AC
15001+
16000
SF
2054
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
2054AA
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
10
EA
2055
RUNWAY RUBBER REMOVAL
2055AA
0-200,000
150,000
SF
2055AB
200,001-400,000
250,000
SF
2055AC
400,001-600,000
450,000
SF
2055AD
RUBBERIZED TOPPING
1000
SF
2056
SHEET PILES (INSTALLED)
2056AA
10' Steel Sheet Pile Panels 0-300
250
LF
2056AB
10' Steel Sheet Pile Panels <301
325
LF
2056AC
10' Fiberglass Sheet Pile Panels 0-300
250
LF
2056AD
10' Fiberglass Sheet Pile Panels <301
325
LF
2057
Highway Traffic Control Barriers (Jersey Barriers)
2057AA
10' Jersey Barriers 0-1000 (Installed)
950
LF
2057AB
10' Jersey Barriers 1001> (Installed)

LF

2058
NIGHT WORK/WEEKEND WORK
2058AA
NIGHT WORK/WEEKEND WORK
_____%
JB

TOTAL (CLINS 0001-0057AB) BASIC YEAR

BOND ____ %

TOTAL ESTIMATE

IDIQ Paving, FTFA 08-1002 OPTION YEAR 3 QUANTITIES

ITEM NO.
DESCRIPTION
EST QTY
UNIT
UNIT PRICE
EST AMT
3001
MILL ASPHALT
3001AA
0-2500
2500
SY
3001AB
2501-10000
3000
SY
3001AC
10001+
11000
SY
3002
ROUGH GRADING
3002AA
0-2500
2500
SY
3002AB
2501-10000
3000
SY
3002AC
10000+
11000
SY
3003
FINE GRADING ROADS/PARK LOT
3003AA
0-2500
2500
SY
3003AB
2501-10000
3000
SY
3003AC
10001+
11000
SY
3004
FINE GRADING S/W & CART PATHS
3004AA
0-500
500
SY
3004AB
501-5000
4000
SY
3004AC
5001+
6000
SY
3005
FIND GRADING SWALES/DRAINAGE
3005AA
0-2500
1000
SY
3005AB
2501-10000
3000
SY
3005AC
10001+
11000
SY
3006
6" GRADED AGGREGATE (GAB) IN PLACE
3006AA
0-2500
1000
SY
3006AB
2501-10000
3000
SY
3006AC
10001+
11000
SY
3007
COMP EXISTING SUBGRADE
3007AA
0-2500
2000
SY
3007AB
2500+
3000
SY
3008
COMPACT OF FILL SUBRADE & BASE
3008AA
0-2500
2000
SY
3008AB
2500+
3000
SY
3009
EXCAVATION, BULK
3009AA
0-2500
500
CY
3009AB
2501-10000
3000
CY
3009AC
10001+
11000
CY
3010
EXCAVATION, HAND
3010AA
EXCAVATION, HAND
100
CY
3011
FILL, COMMON EARTH
3011AA
0-500
500
CY
3011AB
500+
700
CY
3012
FILL, SELECT
3012AA
0-500
500
CY
3012AB
500+
700
CY
3013
SAWCUT ASPHALT
3013AA
0-500
500
LF
3013AB
500-1000
750
LF
3013AC
1001+
1200
LF
3014
BITUM PRIME COAT
3014AA
BITUM PRIME COAT
800
GAL
3015
BITUM TACK COAT
3015AA
BITUM TACK COAT
800
GAL
3016
ASPHALT IN PLACE COMPACTED
3016AA
Type SP 12.5 Traffic Level B 0-250
250
TON
3016AB
251-2000
1500
TON
3016AC
2001+
3000
TON
3017
TYPE SP 9.5 TRAFFIC LEVEL B
3017AA
0-250
250
TON
3017AB
251-2000
500
TON
3017AC
2001+
2500
TON
3018
TYPE SP 19.0 TRAFFIC LEVEL B
3018AA
0-250
250
TON
3018AB
251-2000
500
TON
3018AC
2001+
2500
TON
3019
ASPHALT FOR AIRFIELDS
3019AA
0-2000
2000
TON
3019AB
2001-6000
6000
TON
3019AC
6001+
100000
TON
3020
HAUL REMOVED MATERIALS OFF BASE
3020AA
0-100
100
CY
3020AB
101-1000
1000
CY
3020AC
1001+
2100
CY
3021
REMOVE CONCRETE
3021AA
UP TO 6" THICK
100
SY
3021AB
6-10" THICK
100
SY
3021AC
GREATER THAN 10" THICK
100
SY
3022
REMOVE SIDEWALK 4" THICK
3022AA
4 FEET WIDE
100
SY
3023
INSTALL CONC S/W 4INCH THICK
3023AA
0-100
75
SY
3023AB
101+
150
SY
3024
CONCRETE VEH PVMT 4" THICK
3024AA
0-50
50
SY
3024AB
50+
75
SY
3025
CONCRETE VEH PVMT 5" THICK
3025AA
0-50
50
SY
3025AB
51+
75
SY
3026
FL DOT TYPE F CURB
3026AA
0-50
50
LF
3026AB
50-500
250
LF
3026AC
501+
750
LF
3027
PCC PAVING 700 PSI FLEX 12" THICK
3027AA
0-100
100
SY
3027AB
101-1000
500
SY
3027AC
1001+
1500
SY
3028
EACH ADDITIONAL INCH
3028AA
0-100
100
SY
3028AB
101-1000
500
SY
3028AC
1001+
1500
SY
3029
EXPANSION JOINT MAT'L SILICONE
3029AA
0-1000
750
LF
3029AB
1001+
1500
LF
3030
PRE-FORMED ELASTOMERIC
3030AA
0-1000
750
LF
3030AB
1001+
1500
LF
3031
PAVEMENT MARKING PERM. REFLECTIVE
3031AA
0-2500
2000
SF
3031AB
2501-10000
7500
SF
3031AC
10001+
12000
SF
3032
PERMANENT NON-REFLECTIVE
3032AA
0-2500
2000
SF
3032AB
2501-10000
7500
SF
3032AC
10001+
12000
SF
3033
TEMPORARY REFLECTIVE
3033AA
0-2500
2000
SF
3033AB
2501-10000
7500
SF
3033AC
10001+
12000
SF
3034
TEMPORARY NON-REFLECTIVE
3034AA
0-2500
2000
SF
3034AB
2501-10000
7500
SF
3034AC
10001+
12000
SF
3035
MANHOLE COVER/DROP INLET COVER ADJUSMENT
30035AA
MANHOLE COVER/DROP INLET COVER ADJUSTMENT
10
EA
3036
VALVE BOX ADJUSTMENT
3036AA
VALVE BOX ADJUSTMENT
10
EA
3037
REFLECTIVE PAVEMENT MARKERS
3037AA
REFLECTIVE PAVEMENT MARKERS
500
EA
3038
TRAFFIC TURTLES
3038AA
TRAFFIC TURTLES
100
EA
3039
HEADWALL/DRAINAGE STRUCTURES
3039AA
HEADWALL/DRAINAGE STRUCTURES
200
CY
3040
DRAINAGE PIPE, RCP, IN PLACE
3040AA
18"
100
LF
3040AB
24"
100
LF
3040AC
36"
100
LF
3040AD
48"
100
LF
3041
DRAINAGE PIPE, CMP, IN PLACE
3041AA
18"
100
LF
3041AB
24"
100
LF
3041AC
36"
100
LF
3041AD
48"
100
LF
3042
DRAINAGE PIPE, HDPE, IN PLACE
3042AA
18"
100
LF
3042AB
24"
100
LF
3042AC
36"
100
LF
3042AD
48"
100
LF
3043
DEMOLISH ASPHALT PAVEMENT
3043AA
6" THICK
100
SY
3043AB
12" THICK
100
SY
3044
TRAFFIC MARKING REMOVAL
3044AA
0-2500
2500
SF
3044AB
2501-7500
6000
SF
3044AC
7501 - AND GREATER
8000
SF
3045
TRAFFIC MARKING LAYOUT
3045AA
0-2500
2500
SF
3045AB
2501-7500
6000
SF
3045AC
7501 - AND GREATER
8000
SF
3046
SAWCUT CONCRETE
3046AA
0-5"
100
LF
3046AB
GREATER THAN 5"
100
LF
3047
AIRCRAFT TIEDOWNS
3047AA
AIRCRAFT TIEDOWNS
25
EA
3048
EROSION CONTROL – RIPRAP & FABRIC
3048AA
RIPRAP MEETING FL DOT SECTION 530
100
TON
3048AB
TERRA TEX HD FILTER FABRIC
4000
SF
3049
REMOVE/REPLACE EXISTING BUMPER BLOCKS
3049AA
REMOVE/REPLACE EXISTING BUMPER BLOCKS
100
EA
3050
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
3050AA
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
100
EA
3051
PLACE/WATER SOD
3051AA
PLACE/WATER SOD
4000
SY
3052
SEEDING/WATERING
3052AA
SEEDING/WATERING
4000
SY
3053
RUNWAY PAINT REMOVAL
3053AA
2000-5000
3000
SF
3053AB
5001-15000
7500
SF
3053AC
15001+
16000
SF
3054
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
3054AA
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
10
EA
3055
RUNWAY RUBBER REMOVAL
3055AA
0-200,000
150,000
SF
3055AB
200,001-400,000
250,000
SF
3055AC
400,001-600,000
450,000
SF
3055AD
RUBBERIZED TOPPING
1000
SF
3056
SHEET PILES (INSTALLED)
3056AA
10' Steel Sheet Pile Panels 0-300
250
LF
3056AB
10' Steel Sheet Pile Panels <301
325
LF
3056AC
10' Fiberglass Sheet Pile Panels 0-300
250
LF
3056AD
10' Fiberglass Sheet Pile Panels <301
325
LF
3057
Highway Traffic Control Barriers (Jersey Barriers)
3057AA
10' Jersey Barriers 0-1000 (Installed)
950
LF
3057AB
10' Jersey Barriers 1001> (Installed)

LF

3058
NIGHT WORK/WEEKEND WORK
3058AA
NIGHT WORK/WEEKEND WORK
_____%
JB

TOTAL (CLINS 0001-0057AB) BASIC YEAR

BOND ____ %

TOTAL ESTIMATE

IDIQ Paving, FTFA 08-1002 OPTION 4 QUANTITIES

ITEM NO.
DESCRIPTION
EST QTY
UNIT
UNIT PRICE
EST AMT
4001
MILL ASPHALT
4001AA
0-2500
2500
SY
4001AB
2501-10000
3000
SY
4001AC
10001+
11000
SY
4002
ROUGH GRADING
4002AA
0-2500
2500
SY
4002AB
2501-10000
3000
SY
4002AC
10000+
11000
SY
4003
FINE GRADING ROADS/PARK LOT
4003AA
0-2500
2500
SY
4003AB
2501-10000
3000
SY
4003AC
10001+
11000
SY
4004
FINE GRADING S/W & CART PATHS
4004AA
0-500
500
SY
4004AB
501-5000
4000
SY
4004AC
5001+
6000
SY
4005
FIND GRADING SWALES/DRAINAGE
4005AA
0-2500
1000
SY
4005AB
2501-10000
3000
SY
4005AC
10001+
11000
SY
4006
6" GRADED AGGREGATE (GAB) IN PLACE
4006AA
0-2500
1000
SY
4006AB
2501-10000
3000
SY
4006AC
10001+
11000
SY
4007
COMP EXISTING SUBGRADE
4007AA
0-2500
2000
SY
4007AB
2500+
3000
SY
4008
COMPACT OF FILL SUBRADE & BASE
4008AA
0-2500
2000
SY
4008AB
2500+
3000
SY
4009
EXCAVATION, BULK
4009AA
0-2500
500
CY
4009AB
2501-10000
3000
CY
4009AC
10001+
11000
CY
4010
EXCAVATION, HAND
4010AA
EXCAVATION, HAND
100
CY
4011
FILL, COMMON EARTH
4011AA
0-500
500
CY
4011AB
500+
700
CY
4012
FILL, SELECT
4012AA
0-500
500
CY
4012AB
500+
700
CY
4013
SAWCUT ASPHALT
4013AA
0-500
500
LF
4013AB
500-1000
750
LF
4013AC
1001+
1200
LF
4014
BITUM PRIME COAT
4014AA
BITUM PRIME COAT
800
GAL
4015
BITUM TACK COAT
4015AA
BITUM TACK COAT
800
GAL
4016
ASPHALT IN PLACE COMPACTED
4016AA
Type SP 12.5 Traffic Level B 0-250
250
TON
4016AB
251-2000
1500
TON
4016AC
2001+
3000
TON
4017
TYPE SP 9.5 TRAFFIC LEVEL B
4017AA
0-250
250
TON
4017AB
251-2000
500
TON
4017AC
2001+
2500
TON
4018
TYPE SP 19.0 TRAFFIC LEVEL B
4018AA
0-250
250
TON
4018AB
251-2000
500
TON
4018AC
2001+
2500
TON
4019
ASPHALT FOR AIRFIELDS
4019AA
0-2000
2000
TON
4019AB
2001-6000
6000
TON
4019AC
6001+
100000
TON
4020
HAUL REMOVED MATERIALS OFF BASE
4020AA
0-100
100
CY
4020AB
101-1000
1000
CY
4020AC
1001+
2100
CY
4021
REMOVE CONCRETE
4021AA
UP TO 6" THICK
100
SY
4021AB
6-10" THICK
100
SY
4021AC
GREATER THAN 10" THICK
100
SY
4022
REMOVE SIDEWALK 4" THICK
4022AA
4 FEET WIDE
100
SY
4023
INSTALL CONC S/W 4INCH THICK
4023AA
0-100
75
SY
4023AB
101+
150
SY
4024
CONCRETE VEH PVMT 4" THICK
4024AA
0-50
50
SY
4024AB
50+
75
SY
4025
CONCRETE VEH PVMT 5" THICK
4025AA
0-50
50
SY
4025AB
51+
75
SY
4026
FL DOT TYPE F CURB
4026AA
0-50
50
LF
4026AB
50-500
250
LF
4026AC
501+
750
LF
4027
PCC PAVING 700 PSI FLEX 12" THICK
4027AA
0-100
100
SY
4027AB
101-1000
500
SY
4027AC
1001+
1500
SY
4028
EACH ADDITIONAL INCH
4028AA
0-100
100
SY
4028AB
101-1000
500
SY
4028AC
1001+
1500
SY
4029
EXPANSION JOINT MAT'L SILICONE
4029AA
0-1000
750
LF
4029AB
1001+
1500
LF
4030
PRE-FORMED ELASTOMERIC
4030AA
0-1000
750
LF
4030AB
1001+
1500
LF
4031
PAVEMENT MARKING PERM. REFLECTIVE
4031AA
0-2500
2000
SF
4031AB
2501-10000
7500
SF
4031AC
10001+
12000
SF
4032
PERMANENT NON-REFLECTIVE
4032AA
0-2500
2000
SF
4032AB
2501-10000
7500
SF
4032AC
10001+
12000
SF
4033
TEMPORARY REFLECTIVE
4033AA
0-2500
2000
SF
4033AB
2501-10000
7500
SF
4033AC
10001+
12000
SF
4034
TEMPORARY NON-REFLECTIVE
4034AA
0-2500
2000
SF
4034AB
2501-10000
7500
SF
4034AC
10001+
12000
SF
4035
MANHOLE COVER/DROP INLET COVER ADJUSMENT
40035AA
MANHOLE COVER/DROP INLET COVER ADJUSTMENT
10
EA
4036
VALVE BOX ADJUSTMENT
4036AA
VALVE BOX ADJUSTMENT
10
EA
4037
REFLECTIVE PAVEMENT MARKERS
4037AA
REFLECTIVE PAVEMENT MARKERS
500
EA
4038
TRAFFIC TURTLES
4038AA
TRAFFIC TURTLES
100
EA
4039
HEADWALL/DRAINAGE STRUCTURES
4039AA
HEADWALL/DRAINAGE STRUCTURES
200
CY
4040
DRAINAGE PIPE, RCP, IN PLACE
4040AA
18"
100
LF
4040AB
24"
100
LF
4040AC
36"
100
LF
4040AD
48"
100
LF
4041
DRAINAGE PIPE, CMP, IN PLACE
4041AA
18"
100
LF
4041AB
24"
100
LF
4041AC
36"
100
LF
4041AD
48"
100
LF
4042
DRAINAGE PIPE, HDPE, IN PLACE
4042AA
18"
100
LF
4042AB
24"
100
LF
4042AC
36"
100
LF
4042AD
48"
100
LF
4043
DEMOLISH ASPHALT PAVEMENT
4043AA
6" THICK
100
SY
4043AB
12" THICK
100
SY
4044
TRAFFIC MARKING REMOVAL
4044AA
0-2500
2500
SF
4044AB
2501-7500
6000
SF
4044AC
7501 - AND GREATER
8000
SF
4045
TRAFFIC MARKING LAYOUT
4045AA
0-2500
2500
SF
4045AB
2501-7500
6000
SF
4045AC
7501 - AND GREATER
8000
SF
4046
SAWCUT CONCRETE
4046AA
0-5"
100
LF
4046AB
GREATER THAN 5"
100
LF
4047
AIRCRAFT TIEDOWNS
4047AA
AIRCRAFT TIEDOWNS
25
EA
4048
EROSION CONTROL – RIPRAP & FABRIC
4048AA
RIPRAP MEETING FL DOT SECTION 530
100
TON
4048AB
TERRA TEX HD FILTER FABRIC
4000
SF
4049
REMOVE/REPLACE EXISTING BUMPER BLOCKS
4049AA
REMOVE/REPLACE EXISTING BUMPER BLOCKS
100
EA
4050
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
4050AA
REMOVE BUMPER BLOCK - PLACE NEW BUMPER BLOCK
100
EA
4051
PLACE/WATER SOD
4051AA
PLACE/WATER SOD
4000
SY
4052
SEEDING/WATERING
4052AA
SEEDING/WATERING
4000
SY
4053
RUNWAY PAINT REMOVAL
4053AA
2000-5000
3000
SF
4053AB
5001-15000
7500
SF
4053AC
15001+
16000
SF
4054
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
4054AA
FIELD ADJUST RUNWAY LIGHT & CONCRETE JUNCTION BLOCKS
10
EA
4055
RUNWAY RUBBER REMOVAL
4055AA
0-200,000
150,000
SF
4055AB
200,001-400,000
250,000
SF
4055AC
400,001-600,000
450,000
SF
4055AD
RUBBERIZED TOPPING
1000
SF
4056
SHEET PILES (INSTALLED)
4056AA
10' Steel Sheet Pile Panels 0-300
250
LF
4056AB
10' Steel Sheet Pile Panels <301
325
LF
4056AC
10' Fiberglass Sheet Pile Panels 0-300
250
LF
4056AD
10' Fiberglass Sheet Pile Panels <301
325
LF
4057
Highway Traffic Control Barriers (Jersey Barriers)
4057AA
10' Jersey Barriers 0-1000 (Installed)
950
LF
4057AB
10' Jersey Barriers 1001> (Installed)

LF

4058
NIGHT WORK/WEEKEND WORK
4058AA
NIGHT WORK/WEEKEND WORK
_____%
JB

TOTAL (CLINS 0001-0057AB) BASIC YEAR

BOND ____ %

TOTAL ESTIMATE

Cummulative Total

(Base plus option years):

Section C - Descriptions and Specifications

C-1
SPECIFICATIONS, STANDARDS AND DRAWINGS (IAW FAR 11.201)

Specifications, standards or drawings (as applicable) are furnished/listed below:

ITEM NR SPECIFICATIONS, STANDARDS AND/OR ATTACHMENTS

SEE SECTION J

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY REFERENCE

52.246-12
Inspection of Construction
AUG 1996
52.246-13
Inspection--Dismantling, Demolition, or Removal of Improvements
AUG 1996

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY REFERENCE

52.247-34
F.O.B. Destination
NOV 1991

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within time specified in individual delivery orders issued hereunder calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than time specified in individual delivery orders issued hereunder. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $239.43 for each calendar day of delay for each performance period stated in individual delivery orders issued hereunder until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

Section H - Special Contract Requirements

CLAUSES INCORPORATED BY FULL TEXT

H-025
INCORPORATION OF SECTION K
OCT 1998

Section K of the solicitation is hereby incorporated by reference.

H-800
IMPLEMENTATION OF WARRANTY–CONSTRUCTION
JAN 2000

(a) Any manufacturer’s warranties which extend beyond or in addition to the normal one year warranty required by FAR 52.246-21 shall be furnished to the government in their entirety, including the names of vendors responsible for servicing these warranties.

(b) Prior to final acceptance of the work covered by this contract, the contractor shall furnish in writing to the Contracting Officer a list of all items of equipment furnished. This list will be accompanied by the applicable warranty documentation. This list shall include;

(i) Nomenclature of the item, type and serial number where applicable, and name and address of the manufacturer.

(ii) Cost

(iii) Period of warranty

(iv) Name, address and telephone number of the subcontractor or supplier

(v) Name, address and telephone number of the servicing agency that will be responsible for the warranty service.

H-801
MEDICAL INFORMATION
JAN 2000

The name of the Contractor’s physician(s) and preferred hospital (for use in the event of industrial injury of employees) shall be posted by the Contractor at the site of the work in a prominent place where it can easily be seen by the workers. This information shall also be furnished to the Director of Base Medical Services, 96 MDG/SG, Eglin AFB FL 32542-5300.

H-803
INSPECTION AND SURVEILLANCE
JAN 2000

The Director, Civil Engineering, Eglin Air Force Base, Florida, is designated as the representative of the Contracting Officer for the purpose of surveillance and inspection of performance of work under this contract. This designation does not include authority to direct or authorize the Contractor to make changes in the scope or terms of the contract without the written authority of the Contracting Officer. Contractor shall notify Construction Management Branch, 96 CEG/CEOC, Nick D’Aquila, telephone 883-1336, at least 24 hours in advance of the date work will commence under this contract; contractor shall also notify that office at earliest possible time of anticipated absence(s) from the job site.

H-807
ON-BASE PERFORMANCE
JAN 2000

(a) Work on this project shall be accomplished during normal hours, which are 7:00 AM to 3:30 PM, Monday through Friday, except legal holidays. Any work desired to be accomplished during other than the normal hours will require prior approval of the Contracting Officer. The Contractor must submit a written request to the Contracting Officer.

(b) The Contractor’s performance may be interrupted from time to time because of high priority mission schedules. For each calendar day and/or portion of a calendar day that the contractor is removed from the job site, the contract schedule will be adjusted by one (1) calendar day.

(c) If building remains occupied throughout construction, special provisions apply as follows: This will be identified on each individual delivery order issues hereunder.

H-810
HURRICANE SEASON
JAN 2000

Hurricane season for the state of Florida is normally the period from 01 June through 30 November. During an actual hurricane, tropical storm or tropical depression condition, you may be contacted by the contracting office and requested to secure equipment, clean up your work area and properly protect stored materials. In accordance with the contract clause FAR 52.236-9, “Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements” and FAR 52.236-12 “Cleaning Up,” you should keep this in mind and maintain your work area free from debris and in a safe and secure condition at the completion of each work day. A duty is imposed on the Contractor to monitor local weather conditions, weather bulletins and base closure information in the local media. The Contractor must contact the Contract Administrator with a report of conditions adversely affecting the construction site.

H-811
CONSTRUCTION PERMITS
JUL 2001

Contractor shall obtain a construction permit for any construction work on Eglin Air Force Base. An AF Form 103 “Base Civil Engineering Work Clearance Request” must be submitted with all required signatures, to the Contract Inspector prior to beginning of performance on the job site. No work shall begin until approval of the AF Form 103 has been granted.

H-813
ENVIRONMENTAL INSURANCE REQUIREMENTS
JAN 2000

The Contractor shall, at its own expense, provide and maintain insurance during the entire performance period of this contract which specifically provides coverage for environmental damages with a minimum amount of $1,000,000.00 per occurrence.

H-817
UTILITIES
JAN 2000

All reasonable required amounts of water and electric power will be made available to the Contractor by the Government without cost to the Contractor.

H-818
UTILITY OUTAGES
JAN 2000

Contractor shall notify the Contracting Officer’s Representative (COR) in writing two weeks prior to any utility outage anticipated during the performance of this contract.

H-819
NO UTILITIES
JAN 2000

Power and water are not available at the job site, nor will they be made available by the Government. Contractor is responsible for providing temporary lighting for working at night, portable generators, and portable water.

H-820
SALVAGE MATERIALS
JAN 2000

(a) All items of Government property indicated on the drawings or in the specifications to be removed and disposed of by the contractor shall become the property of the contractor and shall be removed promptly from the Eglin AFB Reservation and legally disposed of EXCEPT items identified on individual task orders issued hereunder.

(b) Contractors are encouraged to recycle salvage materials when possible. Contact the Eglin Recycling Center, 850-882-7744, Ext. 624, for assistance.

H-825
ASBESTOS REMOVAL REQUIREMENTS
OCT 1992

The contractor shall comply with the applicable requirements of 29 CFR 1910.1001 and 40 CFR 61, Subparts A and M and with laws, ordinances, rules and regulations of federal, state, and local authorities regarding handling, transporting, and disposing of asbestos waste materials. Where the requirements of this specification and referenced documents vary, the most stringent requirements shall apply.

H-829
HAZARDOUS WASTE REMOVAL
JAN 2000

The Contractor shall dispose of all hazardous waste in accordance with all applicable local, federal and state environmental laws and regulations, including but not limited to 40 CFR 260-268, Hazardous Waste Management, and Rule 17-30 Florida Administrative Code. The Contractor shall assume the responsibility of determining what constitutes “hazardous waste” and complying with all environmental laws and regulations governing its removal.

H-833
INDEFINITE QUANTITY CONTRACTS
JAN 2000

The Government hereby obligates itself to order a minimum of $5,000.00 in services during the period of the contract. Individual orders, not to exceed $6,000,000.00 each, may be negotiated hereunder. The maximum cumulative value of all orders hereunder shall not exceed $50,000,000 aggregate.

H-837
DAILY REPORT TO INSPECTOR
JAN 2000

(a) The Contractor shall submit a Daily Report to 96 CEG/CEOM inspector, Harold Cuthriell on AAC Form 3 or 4003. The report shall include weather conditions, work accomplished, test accomplished, test reports, delays and discrepancies.

(b) The report to the inspector shall be the original signed by the contractor or his superintendent and turned into 96 CEG/CEOM inspector, Harold Cuthriell by 12:00 noon the following work day.

H-841
SUPERINTENDENT ESCORT
JAN 2002

Upon notification of award, the Prime Contractor must identify a superintendent and alternate for this contract and job site. The full name, home address, SSN#, date of birth, state driver’s license #, days/hours of access required, and consent to a background check for security purposes of each such employee shall be required. The Prime Contractor’s superintendent and/or alternate shall be accountable for all individuals escorted onto the installation. These individuals shall be responsible for escorting new employees to Pass and I.D. where they may apply for and hopefully be issued their contractor badges. In the case of those employees who are only needed for a short duration of time and who will not require a badge, the escort must maintain accountability of these individuals at all times while on the installation. The privilege of a potential employee being allowed access should be considered in all hiring and subcontracting decisions. The U.S. Air Force will not be responsible or liable for any costs or delays that a contractor incurs due to a contractor’s employee being denied access to Eglin AFB. Further, any failure of the superintendent or alternate to comply with any of these requirements shall result in the revocation of escort authority and will not be an excuse or defense for any damages, including liquidated damages that might be assessed by the contracting officer. The Superintendent and/or alternate shall be responsible for collecting badges/PVC cards from all employees upon completion of the project/contract or termination of service. Prior to final payment the Superintendent must provide proof to the contracting officer of collection/turn-in of all badges for employees granted base access in support of this project/job.

H-846
INSURANCE CLAUSE IMPLEMENTATION
MAR 2004

The Contractor shall obtain and maintain the minimum kinds and amounts of insurance during performance of this contract as specified in FAR Sub Part 28.3.

H-853
Conformance with Environmental Management Systems (Pollution Prevention and Right-to-Know Information)
APR 2008

1. Contractors shall provide a list of toxic and hazard chemicals to the Facility Hazardous Materials Cell, 96 CEG/CEVCP, 850-882-4677 before bringing any material onto the facility. This list shall consist of the material name, manufacturer name and address, quantity and size of the materials. This list may be in Microsoft Word or Excel. Updates of this list shall be submitted quarterly to the above office.

2. The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility environmental management system (EMS) applicable for your contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility EMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the EMS Site Coordinator, 96 CEG/CEVCP, 850-882-7684. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.

3. All on-site contractor personnel shall complete facility sponsored environmental training specific to the facility. The facility training will take approximately thirty minutes to accomplish. The training must be completed within 90 days of the contractor employee being work on the installation. The method of train can be video or my seminar presentations. Documentation of the training will be provided to EMS Coordinator, 96 CEG/CEVCP, 850-882-7684. Upon contract award, the Contracting Officer's Representative will notify the facility-level Environmental Management Systems Coordinator, 96 CEG/CEVCP, 850-882-7684 to arrange EMS training for appropriate staff.

H-854
BONDS
OCT 1992

(a) Within the time period specified by the Contracting Officer, the offeror shall furnish two bonds each with surety or sureties acceptable to the Government in the form of a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds shall be as follows:

(1) Bid Bonds. Each bidder shall submit WITH THEIR BID a Bid Bond (Standard Form 24) with a surety or sureties acceptable to the Government, or other security in the form of twenty percent (20%) of the bid price but shall not exceed $3,000,000. The Bid Bond amount shall be expressed either as a percentage of the bid price or in dollars and cents.

(2) Performance Bond. The penal sum of the Performance Bond shall equal one hundred percent (100%) of any Task (Call) Order $100,000 or greater obligated under this Indefinite Delivery Indefinite Quantity (IDIQ) contract. If the total value of outstanding Task (Call) Orders exceeds $100,000 at any one given time, Contractor shall furnish additional performance bonding to reflect increased value of the Task (Call) Orders. This requirement also applies to any options exercised by the Government. Any bonds will be furnished by the Contractor to the Government prior to commencement of contract performance.

(3) Payment Bonds. The penal sum of the Payment Bond shall equal one hundred percent (100%) of any Task (Call) Order $100,000 or greater obligated under this IDIQ contract. If the total value of outstanding Task (Call) Orders exceeds $100,000 at any one given time, Contractor shall furnish additional performance bonding to reflect increased value of the Task (Call) Orders. This requirement also applies to any options exercised by the Government. Any bonds will be furnished by the Contractor to the Government prior to commencement of contract performance.

(b) Alternate Payment Protection. For task orders between $30,000 and $100,000, the contractor shall submit one of the following payment protections for one hundred (100%) of the individual delivery order price:

Irrevocable Letter of Credit

Payment Bond

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1
Definitions
JUL 2004
52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
APR 1984
52.203-6
Restrictions On Subcontractor Sales To The Government
SEP 2006
52.203-7
Anti-Kickback Procedures
JUL 1995
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
JAN 1997
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
JAN 1997
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
SEP 2007
52.204-4
Printed or Copied Double-Sided on Recycled Paper
AUG 2000
52.204-7
Central Contractor Registration
JUL 2006
52.204-9
Personal Identity Verification of Contractor Personnel
SEP 2007
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
SEP 2006
52.215-2
Audit and Records--Negotiation
JUN 1999
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.219-8
Utilization of Small Business Concerns
MAY 2004
52.219-9
Small Business Subcontracting Plan
NOV 2007
52.219-9 Alt II
Small Business Subcontracting Plan (Nov 2007) Alternate II
OCT 2001
52.222-3
Convict Labor
JUN 2003
52.222-4
Contract Work Hours and Safety Standards Act - Overtime Compensation
JUL 2005
52.222-6
Davis Bacon Act
JUL 2005
52.222-7
Withholding of Funds
FEB 1988
52.222-8
Payrolls and Basic Records
FEB 1988
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
JUL 2005
52.222-12
Contract Termination-Debarment
FEB 1988
52.222-13
Compliance with Davis-Bacon and Related Act Regulations.
FEB 1988
52.222-14
Disputes Concerning Labor Standards
FEB 1988
52.222-15
Certification of Eligibility
FEB 1988
52.222-21
Prohibition Of Segregated Facilities
FEB 1999
52.222-26
Equal Opportunity
MAR 2007
52.222-27
Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-30
Davis-Bacon Act--Price Adjustment (None or Separately Specified Method)
DEC 2001
52.222-35
Equal Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans
SEP 2006
52.222-36
Affirmative Action For Workers With Disabilities
JUN 1998
52.222-37
Employment Reports On Special Disabled Veterans, Veterans Of The Vietnam Era, and Other Eligible Veterans
SEP 2006
52.223-5
Pollution Prevention and Right-to-Know Information
AUG 2003
52.223-5 Alt I
Pollution Prevention and Right-to-Know Information (Aug 2003) Alternate I
AUG 2003
52.223-6
Drug-Free Workplace
MAY 2001
52.223-14
Toxic Chemical Release Reporting
AUG 2003
52.225-13
Restrictions on Certain Foreign Purchases
FEB 2006
52.227-1
Authorization and Consent
DEC 2007
52.227-2
Notice And Assistance Regarding Patent And Copyright Infringement
DEC 2007
52.227-4
Patent Indemnity-Construction Contracts
DEC 2007
52.228-2
Additional Bond Security
OCT 1997
52.228-5
Insurance - Work On A Government Installation
JAN 1997
52.228-11
Pledges Of Assets
FEB 1992
52.228-12
Prospective Subcontractor Requests for Bonds
OCT 1995
52.228-14
Irrevocable Letter of Credit
DEC 1999
52.228-15
Performance and Payment Bonds--Construction
NOV 2006
52.229-3
Federal, State And Local Taxes
APR 2003
52.232-5
Payments under Fixed-Price Construction Contracts
SEP 2002
52.232-17
Interest
JUN 1996
52.232-23
Assignment Of Claims
JAN 1986
52.232-27
Prompt Payment for Construction Contracts
SEP 2005
52.232-33
Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-1
Disputes
JUL 2002
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.236-2
Differing Site Conditions
APR 1984
52.236-3
Site Investigation and Conditions Affecting the Work
APR 1984
52.236-5
Material and Workmanship
APR 1984
52.236-6
Superintendence by the Contractor
APR 1984
52.236-7
Permits and Responsibilities
NOV 1991
52.236-8
Other Contracts
APR 1984
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10
Operations and Storage Areas
APR 1984
52.236-11
Use and Possession Prior to Completion
APR 1984
52.236-12
Cleaning Up
APR 1984
52.236-13
Accident Prevention
NOV 1991
52.236-14
Availability and Use of Utility Services
APR 1984
52.236-15
Schedules for Construction Contracts
APR 1984
52.236-17
Layout of Work
APR 1984
52.236-21
Specifications and Drawings for Construction
FEB 1997
52.236-21 Alt I
Specifications and Drawings for Construction (Feb 1997) - Alternate I
APR 1984
52.236-26
Preconstruction Conference
FEB 1995
52.242-13
Bankruptcy
JUL 1995
52.242-14
Suspension of Work
APR 1984
52.243-4
Changes
JUN 2007
52.244-5
Competition In Subcontracting
DEC 1996
52.244-6
Subcontracts for Commercial Items
MAR 2007
52.246-21
Warranty of Construction
MAR 1994
52.248-3
Value Engineering-Construction
SEP 2006
52.249-2
Termination For Convenience Of The Government (Fixed-Price)
MAY 2004
52.249-2 Alt I
Termination for Convenience of the Government (Fixed-Price) (May 2004) - Alternate I
SEP 1996
52.249-10
Default (Fixed-Price Construction)
APR 1984
52.253-1
Computer Generated Forms
JAN 1991
252.201-7000
Contracting Officer's Representative
DEC 1991
252.203-7001
Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DEC 2004
252.203-7002
Display Of DOD Hotline Poster
DEC 1991
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7004 Alt A
Central Contractor Registration (52.204-7) Alternate A
SEP 2007
252.205-7000
Provision Of Information To Cooperative Agreement Holders
DEC 1991
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country
DEC 2006
252.223-7006
Prohibition On Storage And Disposal Of Toxic And Hazardous Materials
APR 1993
252.225-7012
Preference For Certain Domestic Commodities
MAR 2008
252.227-7033
Rights in Shop Drawings
APR 1966
252.232-7010
Levies on Contract Payments
DEC 2006
252.236-7000
Modification Proposals-Price Breakdown
DEC 1991
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.243-7002
Requests for Equitable Adjustment
MAR 1998
252.244-7000
Subcontracts for Commercial Items and Commercial Components (DoD Contracts)
JAN 2007
252.247-7023
Transportation of Supplies by Sea
MAY 2002
252.247-7024
Notification Of Transportation Of Supplies By Sea
MAR 2000

52.216-18 Ordering. (OCT 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from Base Year: 365 days after receipt of award, Option Year One: 365 days after expiration of base year, Option Year Two: 365 days after expiration of option year one, Option Year Three: 365 days after expiration of option year two, Option Year Four: 365 days after expiration of option year three.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

(End of clause)

52.216-19 Order Limitations. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $5,000.00 , the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the…

This is the start of the file's text. The full file is on GovTribe.