Appendix A - Schedule of Contract Documents.xls
XLS spreadsheet 34 KB Posted
- Attached to
- construct Emergency Control Center at Bldg 272 Federal contract opportunity
- Solicitation number
- FA2816-09-R-0064
About this file
Attachment 10 - Appendix A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix B - AF Form 66 Design-Build 11-17-08.xls | XLS spreadsheet | |
| Attachment 7 - SECTION 02085.pdf | ||
| Wage Determination CA080033.pdf | ||
| Section 01010 - Environmental Requirements.pdf | ||
| Attachment 5 - Warranty Letter Example.pdf | ||
| PerformanceQuestionnaire.pdf | ||
| FA2816-09-R-0064.pdf | ||
| Rm 158 Conceptual Drawing.ppt | PPT presentation | |
| Attachment 6 - SECTION 02086.pdf | ||
| Drawings.zip | ZIP file | |
| Attachment 1 - SOW.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF CONTRACT DOCUMENTS | PROJECT NUMBER: | PROJECT TITLE: | SOLICITATION / CONTRACT NO.: | ||
| (Including Drawings, Specifications, and Design Analysis) | ACJP 092092 | Construct Emergency Control Center | xxx | ||
| DOCUMENT NUMBER | DOCUMENT TITLE | DOCUMENT DATE | DOCUMENT REVISION NUMBER | REMARKS | |
| 1 | Section 01010 - Environmental Construction Requirements | 7/2/09 | 0 | 34 Pages | |
| 2 | Section 02085 - Asbestos Abatement and Disposal Requirements | 12/5/08 | 0 | 23 Pages | |
| 3 | Section 02086 - Lead-Based Paint Abatement and Disposal Requirements | 12/5/08 | 0 | 19 Pages | |
| 4 | 272-00-A.3 | 8/15/05 | 0 | 1 Page | |
| 5 | 272-00-A.4 | 8/16/05 | 0 | 1 Page | |
| 6 | 272-00-E11 | 8/17/05 | 0 | 1 Page | |
| 7 | 272-00-E12 | 8/18/05 | 0 | 1 Page | |
| 8 | 272-00-E3 | 8/19/05 | 0 | 1 Page | |
| 9 | 272-00-E4 | 8/20/05 | 0 | 1 Page | |
| 10 | 272-00-FP.3 | 8/21/05 | 0 | 1 Page | |
| 11 | 272-00-M1.1 | 8/22/05 | 0 | 1 Page | |
| 12 | 272-00-M1.2 | 8/23/05 | 0 | 1 Page | |
| 13 | 272-00-P.2 | 8/24/05 | 0 | 1 Page | |
| 14 | 272-00-P.3 | 8/25/05 | 0 | 1 Page | |
| 15 | Rm 158 Conceptual Drawing | 8/4/09 | 0 | 1 Page |
&L&"Arial,Bold"&8Schedule of Contract Documents&C&"Arial,Bold"&8&P of &N&R&"Arial,Bold"&8(11-17-08) Appendix A Enter the date (MM/DD/YY)
File details come from the government source that posted it. Updated .