Q A 15 Sep 2009 Los Angeles Air Force Base.doc

DOC document 24 KB Posted

Attached to
Repair Lighting Controls Federal contract opportunity
Solicitation number
FA2816-09-R-0061
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

Answers to questions asked via email

View the file

Other files for this federal contract opportunity

Other files attached to Repair Lighting Controls, newest first.
File Type Posted
Q A 15 Sep 2009 Los Angeles Air Force Base.doc DOC document
Scope of Work.pdf PDF
BLDG 272-4TH Furniture.pdf PDF
Watt Stopper locations.pdf PDF
Wattstopper IDP-3050.pdf PDF
Modified SOW 10 Sep 09.doc DOC document
BLDG 272-3RD Furniture.pdf PDF
BLDG 272-1ST Furniture.pdf PDF
BLDG 272-2nd Furniture.pdf PDF
02062E38-Panel Schedule.pdf PDF
02062E35-Panel Schedule.pdf PDF
02062E39-Panel Schedule.pdf PDF
02062E36-Panel Schedule.pdf PDF
02062E37-Panel Schedule.pdf PDF
02062E34-Panel Schedule.pdf PDF
02062E32-Single Line Diagram.pdf PDF
02062E40-Panel Schedule.pdf PDF
SAMS040123-F-30.pdf PDF
02062E33-Panel Schedule.pdf PDF
Past Perf Questionnaire.doc DOC document
Solicitation Docs.zip ZIP file
Solicitation.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Los Angeles Air Force Base

Project ACJP-072089

Solicitation Number: FA2816-09-R-0061

Questions and Answers Regarding Project:

Upgrade Lighting Systems, B-272, LAAFB

September 15, 2009

Question:

1. "The first is concerning the ALC panel mentioned in the Scope of Work, 3.2.4. and shown on design document sheet E-9. Is this panel existing? If not, is it to be provided by the electrical or mechanical contractor? If it is to be provided by the electrical contractor, are there any specifications as to make, model or operational information?"

Answer: This panel does not exist. The contractor is to supply the lighting control panels and the ALC devices/panel(s) as necessary. The contractor is also to program the ALC system and establish base network connectivity by working with the base Communication Organization. The Contractor will provide for global control of the lighting system within Building 272 through the base network via WebCTRL programming for desktop modifications by end users.

Question:

2. " The second is concerning the "Design and construct the installation of timer controls for the base water feature's lighting and water pumping system" in the Scope Of Work, 3.2.6.2. and design document F3.0. I can find no information on this item in the documents at all. Is there more information available on this?"

Answer: Timer controls for the water feature are to be Intermatic or approved equal. Two motors are 230 volt/15.2 Amp, 3 phase 5 HP (Scott pumps). Intermatic Model for reference: V45472CR or V45472R. Both timers for this application are to be astronomic and are in NEMA 3R cabinets. One motor is 120 volt single phase (no other motor information is available) Intermatic Model for reference: T101. This one unit is 24 hour timer in NEMA 3R cabinet. All timers are to be installed within the pump vault located to the South/West of the water feature.