View the file

Other files

File Type Posted
Questions III.doc DOC document
CDC Dishwashing area-2.pdf PDF
CDC Dishwashing area-1.pdf PDF
Responses to RFIs.pdf PDF
Attachment 7 - Warranty Letter Example.pdf PDF
Attachment 9 - DD1354.pdf PDF
Attachment 2 - Contractor Cost Estimate.xls XLS spreadsheet
Questions II.doc DOC document
Questions.doc DOC document
AB 32.PDF PDF
AB 22.PDF PDF
AB 27.PDF PDF
AB 13.PDF PDF
Ceiling Sensor Information.pdf PDF
AB 35.PDF PDF
AB 26.PDF PDF
AB 5.PDF PDF
AB 23.PDF PDF
AB 12.PDF PDF
MFR Job Walk.doc DOC document
Survey Request_02.09.09_403.doc DOC document
1014468-Fort Mac —
Kitchen_SM.PDF PDF
AB 33.PDF PDF
AB 30.PDF PDF
AB 4.PDF PDF
AB 40.PDF PDF
AB 3.PDF PDF
AB 2.PDF PDF
AB 20.PDF PDF
AB 25.PDF PDF
AB 8.PDF PDF
AB 29.PDF PDF
Existing Kitchen Floor Specifications.pdf PDF
Amendment 1.pdf PDF
AB 7.PDF PDF
Site Visit Sign In.pdf PDF
AB 41.PDF PDF
AB 16.PDF PDF
AB 36.PDF PDF
AB 9.PDF PDF
AB 24.PDF PDF
AB 19.PDF PDF
AB 10.PDF PDF
AB 34.PDF PDF
As Built 1.PDF PDF
AB 15.PDF PDF
AB 17.PDF PDF
AB 39.PDF PDF
AB 28.PDF PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HHEK081033

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add four attachments to the solicitation that are mentioned in the statement of Work.

Attachment 1 Architect Engineer Estimate of the SOW is now Attachment 55.

Attachment 2 Contractor Cost Estimate is now Attachment 56.

Attachment 7 Warranty Letter Example is now Attachment 57.

Attachment 9 DD1354 is now Attachment 58.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-May-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA2816-09-R-0028

X 9B. DATED (SEE ITEM 11)

13-Apr-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-May-2009

CODE

61 CONS/LGCA - MAJOR ACQUISITION FLIGHT

OPERATIONAL CONTRACTING

483 N. AVIATION BLVD.

EL SEGUNDO CA 90245-2808

FA2816 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA2816-09-R-0028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work 11 Attachment 10 Asbestos Survey 2 03-MAR-2009 Attachment 11 Asbestos Survey

Attachment 1

Attachment 12 Asbestos Survey Attachment 2

Attachment 13 Asbestos Survey Attachment 3

Attachment 14 As Built #1 Attachment 15 As Built #2 Attachment 16 As Built #3 Attachment 17 As Built #4 Attachment 18 AS Built #5 Attachment 19 As Built #6 Attachment 2 Appendix A-Detailed

Scope of Work

Attachment 20 As Built #7 Attachment 21 As Built #8 Attachment 22 As Built #9 Attachment 23 As Built #10 Attachment 24 As Built #11 Attachment 25 As Built #12 Attachment 26 As Built #13 Attachment 27 As Built #14 Attachment 28 As Built #15 Attachment 29 As Built #16 Attachment 3 Repair Community Center

Pictures

Attachment 30 As Built #17 Attachment 31 As Built #18 Attachment 32 As Built #19 Attachment 33 As Built #20 Attachment 34 As Built #21 Attachment 35 As Built #22 Attachment 36 As Built #23 Attachment 37 As Built #24 Attachment 38 As Built #25 Attachment 39 As Built #26 Attachment 4 Asbestos Abatement and

Disposal Requirements

Attachment 40 As Built #27 Attachment 41 As Built #28 Attachment 42 As Built #29

Attachment 43 As Built #30 Attachment 44 As Built #31 Attachment 45 As Built #32 Attachment 46 As Built #33 Attachment 47 As Built #34 Attachment 48 As Built #35 Attachment 49 As Built #36 Attachment 5 Environmental

Construction Requirements

Attachment 50 As Built #37 Attachment 51 As Built #38 Attachment 52 As Built #39 Attachment 53 As Built #40 Attachment 54 As Built #41 Attachment 6 Lead-Based Paint

Abatement and Disposal Requirement

Attachment 7 Wage Determination

CA080033

28 03-APR-2009

Attachment 8 Past Performance Questionnaire

Attachment 9 AF Form 66 4 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work 11 Attachment 2 Appendix A-Detailed

Scope of Work

Attachment 3 Repair Community Center Pictures

Attachment 4 Asbestos Abatement and Disposal Requirements

Attachment 5 Environmental

Construction Requirements

Attachment 6 Lead-Based Paint Abatement and Disposal Requirement

Attachment 7 Wage Determination

CA080033

28 03-APR-2009

Attachment 8 Past Performance Questionnaire

Attachment 9 AF Form 66 4

Attachment 10 Asbestos Survey 2 03-MAR-2009 Attachment 11 Asbestos Survey

Attachment 1

Attachment 12 Asbestos Survey Attachment 2

Attachment 13 Asbestos Survey Attachment 3

Attachment 14 As Built #1 Attachment 15 As Built #2 Attachment 16 As Built #3 Attachment 17 As Built #4 Attachment 18 AS Built #5 Attachment 19 As Built #6 Attachment 20 As Built #7 Attachment 21 As Built #8 Attachment 22 As Built #9 Attachment 23 As Built #10 Attachment 24 As Built #11 Attachment 25 As Built #12 Attachment 26 As Built #13 Attachment 27 As Built #14 Attachment 28 As Built #15 Attachment 29 As Built #16 Attachment 30 As Built #17 Attachment 31 As Built #18 Attachment 32 As Built #19 Attachment 33 As Built #20 Attachment 34 As Built #21 Attachment 35 As Built #22 Attachment 36 As Built #23 Attachment 37 As Built #24 Attachment 38 As Built #25 Attachment 39 As Built #26 Attachment 40 As Built #27 Attachment 41 As Built #28 Attachment 42 As Built #29 Attachment 43 As Built #30 Attachment 44 As Built #31 Attachment 45 As Built #32 Attachment 46 As Built #33 Attachment 47 As Built #34 Attachment 48 As Built #35 Attachment 49 As Built #36 Attachment 50 As Built #37 Attachment 51 As Built #38 Attachment 52 As Built #39 Attachment 53 As Built #40 Attachment 54 As Built #41 Attachment 55 Architect Engineer

Estimate

Attachment 56 Contractor Cost Estimate Attachment 57 Warranty Letter Example Attachment 58 DD1354

(End of Summary of Changes)

File details come from the government source that posted it. Updated .