RFI_1_Questions_and_Responses.pdf

PDF 115 KB Posted

Attached to
GLEN 15-2203 Repair Sanitary Sewer Manholes
Solicitation number
FA255017R1013
Issued by

About this file

RFI Responses

View the file

Other files

File Type Posted
Schriever_2013_I-I_Study.pdf PDF
2_GLEN_15-2203_SOW_25_Apr_17.pdf PDF
5_Design_Guide_Version_March_2016.pdf PDF
8_WD_CO20160012.pdf PDF
6_GLEN_15-2203_Form_66.xlsx XLSX spreadsheet
7_23-DD_1354_August_2013.pdf PDF
1_FA255017R1013_1442.pdf PDF
4_SAFB_Overarching_Environmental.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GLEN 15-2203 Sanitary Sewer Manholes RFI #1

FA2550-17-R-1013

RFI Questions and Responses

1. Please provide the Photographs and site map from the 2013 I&I Study (Page 5 SOW

Paragraph 5.2.1.3).

a. Government Response: Will be posted on FBO. Included in this amendment.

2. For the undefined channel repairs will the contractor be required to provide new Rip

Rap?

a. Government Response: If rip rap needs to be removed to complete the repair, it should be replaced after the repair is complete. However, if this question refers to the “deficiency” column in the table under part 5.2.1 of the SOW, “undefined channel” refers to issues within the concrete bench at the bottom of the manhole.

3. In areas where we replace manhole vaults will a concrete patch be acceptable or will we be required to pour a concrete collar and patch back the asphalt around it?

a. Government Response: Portland cement concrete is desirable in place of hot mix asphalt for patching, if it will be more cost effective. Where Portland cement concrete is to be used, the concrete should be per an approved minimum 4,000 psi air-entrained mix, installed to shed water and broom finished, and the edges adjoining asphalt pavements need to be saw-cut straight.

4. Will a SWPPP Plan be required for the project?

a. Government Response: A formal SWPPP is not required, however the contractor should install temporary erosion control and protection for Schriever’s stormwater infrastructure per the details shown in CDoT M-208-1 where applicable. In June

2013, the US Army Corps of Engineers determined that Schriever AFB has no jurisdictional wetlands or Waters of the US.

5. How many manholes are to be addressed?

a. Government Response: The drawings show all manholes. Section 5.2.1 specifies which manholes and the issues.

6. Is overgrowth to be removed or trimmed back.

a. Government Response: Trimming back will be sufficient if it does not create the same issue in the future. Otherwise, removal is required.

7. When are RFI’s due by?

a. Government Response: All RFI’s are due by 12 July 17. Responses will be provided no later than 14 July 17.