GLEN_15-4104_Bid_Schedule_4.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Construct Enoch Rd. from Sputnik St. to Base-X Area. Federal contract opportunity
- Solicitation number
- FA2550-17-R-1010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Request_for_Information_FA255017R1010.docx | DOCX document | |
| GLEN_15-4104_Geotech_Report.pdf | ||
| Design_Guide_Version_March_2016.pdf | ||
| Enoch_Road_Drawings_3.pdf | ||
| GLEN_15-4104_SOW_1.pdf | ||
| 1442_Enoch_Rd._Const_RFP_Released.pdf | ||
| Safety_and_Health_Reqmts_7.pdf | ||
| Enoch_Road_Specifications_2.pdf | ||
| GLEN_15-4104_Form_66_Submittal_Log_5.xlsx | XLSX spreadsheet | |
| Wage_Determination_CO170018_6.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
North Gate
| PROJECT GLEN 15-4104 | |||||
| CONSTRUCT ENOCH ROAD FROM SPUTNIK STREET TO BASE-X AREA | |||||
| Contractor's Name: | |||||
| Date submitted: | |||||
| Bid Tabulation | |||||
| Item #: | LINE ITEM DESCRIPTION: | QUANTITY: | UNIT: | UNIT COST: | COST: |
| 1 | Mobilization/Demobilization | Lump Sum | $____________ | $___________________ | |
| 2 | Material Testing | Lump Sum | $____________ | $___________________ | |
| 3 | Traffic Control | Lump Sum | $____________ | $___________________ | |
| 4 | Remove Existing Corrugated Metal Pipe | L.F. | $____________ | $___________________ | |
| Sawcut Existing Asphalt | L.F. | ||||
| 5 | Unclassified Excavation | C.Y. | $____________ | $___________________ | |
| 6 | Subgrade Compaction | S.F. | $____________ | $___________________ | |
| 7 | Class 6 Base and Compaction | S.Y. | $____________ | $___________________ | |
| 8 | HMA Grading S with Grade PG64-22 Binder - 2" Thick Base Course | S.Y. | $____________ | $___________________ | |
| 9 | HMA Grading SX with Grade PG64-28 Binder - 2" Thick Surface Course | S.Y. | $____________ | $___________________ | |
| 10 | Prime Coat | S.Y. | $____________ | $___________________ | |
| 11 | Tack Coat | S.Y. | $____________ | $___________________ | |
| 12 | Type 3 W-Beam Guradrail (Includes removal of existing guardrail) | L.F. | $____________ | $___________________ | |
| 13 | Adjust Existing Manhole Ring and Cover to Grade | EA | $____________ | $___________________ | |
| 14 | Construct 24" Reinforced Concrete Pipe | L.F. | $____________ | $___________________ | |
| 15 | Construct 24" Concrete Flared End Section | EA | $____________ | $___________________ | |
| 16 | Construct D50 Riprap | C.Y. | $____________ | $___________________ | |
| 17 | Install Temporary Erosion Control | L.S. | $____________ | $___________________ | |
| 18 | Install Permanent Mulching and Seeding | S.Y. | $____________ | $___________________ | |
| 19 | Paint Double Yellow Centerline Stripe | L.F. | $____________ | $___________________ | |
| 20 | Paint White Edgeline Stripe | L.F. | $____________ | $___________________ | |
| 21 | Install Street Signs on New Posts | EA | $____________ | $___________________ | |
| 22 | Reset Existing Street Sign and Posts | EA | $____________ | $___________________ | |
| 23 | Project Close Out | Lump Sum | $____________ | $___________________ | |
| Base Bid Line Item Costs - Sub Total | |||||
| Bonding ( %) | |||||
| Bid Total |
Note: This bid tabulation lists the only pay items to be used for this contract. If the contractor believes that additional line items are necessary for completion of the required work, they may add them to the proposal sheet and attach a clear explanation for the additional line item(s). The contractor is to propose the quantities/amounts to cover all costs to complete the project.