Industry_Questions_28_June_2016.pdf

PDF 62 KB Posted

Attached to
HWY 94 and Enoch Rd. Signs Federal contract opportunity
Solicitation number
FA2550-16-T-2010
Issued by
Department of the Air Force Space Command

About this file

See attached Industry Questions and Answers 28 June 16

View the file

Other files for this federal contract opportunity

Other files attached to HWY 94 and Enoch Rd. Signs, newest first.
File Type Posted
FA2550-16-T-2010-0001_HWY_94_and_Enoch_Rd_Signs.pdf PDF
GLEN_15-5201_STATEMENT_OF_REQUIREMNT.pdf PDF
HWY_94_and_Enoch_Rd._Signs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28 June 2016

The Following are questions and answers from a vendor:

Question 1 - If you are using the existing control base for these new signs. Or do you need a new one?

Response: We intend to use the existing control base for the new signs. One additional toggle switch will be required to operate the new "Irwin Gate Open/Closed" sign board. Per the SOR, the contractor shall provide onsite installation assistance to configure and link the radio networks and commissioning to insure that the system is fully operational.

Question 2 - Are you planning on using any of the existing equipment that is on the current signs or are you wanting all new materials?

Response: The SOR requires new equipment to include solar panels, battery/cabinet, etc. to be sized to operate the new signs.

Question 3 - Are these all new locations for these signs

Response: The SOR Project background shows reusing the existing sign posts on Highway 94 and North Curtis Road for the new message boards. A new sign assembly will be installed on South Curtis Road as shown on the SOR Exhibit.

Question 4 - Line items 4-6, are these new signs black on white or do you want them green with white to match the electronic signs?

Response: The SOR Exhibit shows the required sign colors and wording as approved by CDOT.