CPCS_Bid_Schedule.pdf

PDF 64 KB Posted

Attached to
CPCS Maintenance
Solicitation number
FA2550-14-T-1002
Issued by

About this file

Bid Schedule

View the file

Other files

File Type Posted
CPCS_Maintenance_Combo.pdf PDF
CPCS_PWS_12_May_14.pdf PDF
WD_05-2079_Revision_No_14_Date_of_Revision_06192013.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Central Plant Computer System FA2550-14-T-1002

BID SCHEDULE

28 Apr 2014

CONTRACT

LINE ITEM

NO. (CLIN)

SUPPLIES/SERVICE

QTY

UNIT

PRICE

AMOUNT

0001 SCHEDULED MAINTENANCE

AND SERVICES:

Scheduled maintenance (SM) includes: system-debugging, adjustments, calibrations, load studies, testing and operational/functionality testing of all components of the CPCS.

See appendix B of PWS for listing of equipment to be serviced.

FY14, POP 1 Aug 2014 to 30 Sep

2014.

LUMP

SUM

0002 TECHNICAL SUPPORT:

Provide technical support 24 hours a day, 7 days a week.

Technical support shall consist of verbal or written communications with the user by telephone, fax, or e-mail in attempt to assist the user in identifying the nature of the problem and lead the user through trouble-shooting repair procedure, etc.

(Estimated)

HOUR

0003 WORK ORDER ROUTINE

LABOR:

Perform on-site maintenance to restore the equipment to automatic and manual modes of operation within 48 hours after notification. Perform scheduled hardware/software upgrades.

FY14, POP 1 Aug 2014 to 30 Sep

2014.

(Estimated)

0004 WORK ORDER EMERGENCY

LABOR:

Perform on-site Emergency

Maintenance (EM) to restore the equipment to automatic and

(Estimated)

CONTRACT

manual modes of operation within

48 hours after notification.

FY14, POP 1 Aug 2014 to 30 Sep

2014.

0005 WORK ORDER PARTS:

Any parts required to repair the

CPCS during unscheduled maintenance. Any hardware/software required to upgrade CPCS.

$9,000.00

Base Year Total (FY14)

OPTION

SCHEDULED MAINTENANCE

AND SERVICES:

Scheduled maintenance (SM) includes: system-debugging, adjustments, calibrations, load studies, testing and operational/functionality testing of all components of the CPCS.

See appendix B of PWS for listing of equipment to be serviced.

FY15, POP 1 Oct 2014 to 30 Sep

2015.

OPTION

TECHNICAL SUPPORT:

Provide technical support 24 hours a day, 7 days a week.

Technical support shall consist of verbal or written communications with the user by telephone, fax, or e-mail in attempt to assist the user in identifying the nature of the problem and lead the user through trouble-shooting repair procedure, etc.

OPTION

WORK ORDER ROUTINE

LABOR:

Perform on-site maintenance to restore the equipment to automatic and manual modes of operation within 48 hours after notification. Perform scheduled hardware/software upgrades.

FY15, POP 1 Oct 2014 to 30 Sep

2015.

(Estimated)

OPTION

WORK ORDER EMERGENCY

LABOR:

Perform on-site Emergency

Maintenance (EM) to restore the equipment to automatic and manual modes of operation within

48 hours after notification.

FY15, POP 1 Oct 2014 to 30 Sep

2015.

(Estimated)

OPTION

WORK ORDER PARTS:

Any parts required to repair the

CPCS during unscheduled maintenance. Any hardware/software required to upgrade CPCS.

$36,000.00

Option Year 1 Total (FY15)

SCHEDULED MAINTENANCE

AND SERVICES:

Scheduled maintenance (SM) includes: system-debugging, adjustments, calibrations, load studies, testing and operational/functionality testing of all components of the CPCS.

See appendix B of PWS for listing of equipment to be serviced.

FY16, POP 1 Oct 2015 to 30 Sep

2016.

OPTION

TECHNICAL SUPPORT:

Provide technical support 24 hours a day, 7 days a week.

Technical support shall consist of verbal or written communications with the user by telephone, fax, or e-mail in attempt to assist the user in identifying the nature of the problem and lead the user through trouble-shooting repair procedure, etc., OPTION

WORK ORDER ROUTINE

LABOR:

Perform on-site maintenance to restore the equipment to automatic and manual modes of operation within 48 hours after notification. Perform scheduled hardware/software upgrades.

FY16, POP 1 Oct 2015 to 30 Sep

2016.

(Estimated)

HOURS

OPTION

WORK ORDER EMERGENCY

LABOR:

Perform on-site Emergency

Maintenance (EM) to restore the equipment to automatic and manual modes of operation within

48 hours after notification.

FY16, POP 1 Oct 2015 to 30 Sep

2016.

(Estimated)

OPTION

WORK ORDER PARTS:

Any parts required to repair the

CPCS during unscheduled maintenance. Any hardware/software required to upgrade CPCS.

$37,600.00

Option Year 2 Total (FY16)

OPTION

SCHEDULED MAINTENANCE

AND SERVICES:

Scheduled maintenance (SM) includes: system-debugging, adjustments, calibrations, load studies, testing and operational/functionality testing of all components of the CPCS.

See appendix B of PWS for listing of equipment to be serviced.

FY17, POP 1 Oct 2016 to 30 Sep

2017.

OPTION

TECHNICAL SUPPORT:

Provide technical support 24 hours a day, 7 days a week.

Technical support shall consist of verbal or written communications with the user by telephone, fax, or e-mail in attempt to assist the user in identifying the nature of the problem and lead the user through trouble-shooting repair procedure, etc.

OPTION

WORK ORDER ROUTINE

LABOR:

Perform on-site maintenance to restore the equipment to automatic and manual modes of operation within 48 hours after notification. Perform scheduled hardware/software upgrades.

FY17, POP 1 Oct 2016 to 30 Sep

2017.

(Estimated)

OPTION

WORK ORDER EMERGENCY

LABOR:

Perform on-site Emergency

Maintenance (EM) to restore the equipment to automatic and manual modes of operation within

48 hours after notification.

(Estimated)

2017.

OPTION

WORK ORDER PARTS:

Any parts required to repair the

CPCS during unscheduled maintenance. Any hardware/software required to upgrade CPCS.

$39,100.00

Option Year 3 Total (FY17)

SCHEDULED MAINTENANCE

AND SERVICES:

Scheduled maintenance (SM) includes: system-debugging, adjustments, calibrations, load studies, testing and operational/functionality testing of all components of the CPCS.

See appendix B of PWS for listing of equipment to be serviced.

FY18, POP 1 Oct 2017 to 30 Sep

2018.

OPTION

TECHNICAL SUPPORT:

Provide technical support 24 hours a day, 7 days a week.

Technical support shall consist of verbal or written communications with the user by telephone, fax, or e-mail in attempt to assist the user in identifying the nature of the problem and lead the user through trouble-shooting repair procedure, etc., OPTION

WORK ORDER ROUTINE

LABOR:

Perform on-site maintenance to

(Estimated) restore the equipment to automatic and manual modes of operation within 48 hours after notification. Perform scheduled hardware/software upgrades.

FY18, POP 1 Oct 2017 to 30 Sep

2018.

OPTION

WORK ORDER EMERGENCY

LABOR:

Perform on-site Emergency

Maintenance (EM) to restore the equipment to automatic and manual modes of operation within

48 hours after notification.

FY18, POP 1 Oct 2017 to 30 Sep

2018.

(Estimated)

OPTION

WORK ORDER PARTS:

Any parts required to repair the

CPCS during unscheduled maintenance. Any hardware/software required to upgrade CPCS.

$41,700.00

Option Year 4 Total (FY18)

Contract Total, CLINs

0001 through 4006

Total

File details come from the government source that posted it. Updated .