460 FSS Gym WiFi SOW DRAFT.pdf
PDF 172 KB Posted
- Attached to
- Buckley WiFi
- Solicitation number
- FA254325SSBC04
About this file
This Statement of Work (SOW) details a technology solution for the 460th FSS/FSVS Fitness Center at Buckley AFB, Colorado, to provide high-speed internet access for facility patrons. CenturyLink will deliver a Fiber+ Internet Bundle that includes a 1 GIG Fiber Internet circuit, wireless infrastructure, and network equipment over a 3-year contract. The comprehensive solution encompasses a Cisco Meraki security appliance, 20 wireless access points (5 high-ceiling/gymnasium and 15 standard), a 24-port network switch, professional site survey, and optional business applications at no additional charge.
The project requires delivery within 30 days of contract award, with a total estimated value of $70,000. The solution will support internet access for up to 1,500 personnel, enabling activities like downloading music, checking email, and social media during fitness and meeting activities. Additional included services are 10 Business Essential licenses, Microsoft Office 365, web hosting, DNS registration, data backup, and cloud fax capabilities. The primary point of contact is Ms. Peggy Haynes Mericle, with technical support from USAF personnel Nathan L. Weisbeck and TSgt Tunell.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Buckley WiFi IGE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
1.0. Purpose
This document describes work that will be performed to plan and deliver a technology solution that will afford patrons of the 460th FSS/FSVS Fitness Center located at:
460th FSS/FSVS Fitness Center 17890 E. Steamboat Avenue, Building 35 Buckley AFB, CO 80011
The main point of Contact for this project is:
Ms. Peggy Mericle Telephone: (720)-847-4350
This proposed technology solution will enable Internet access for patrons during their visits to this multipurpose facility that supports fitness activities as well as small, medium and large meetings of up to 1500 personnel. Many of the patrons of this facility require access to the Internet during their visits for a variety of reasons including the downloading music and videos during workouts, responding to and checking email, participating in social media, etc.
2.0. Solution Overview
The solution will consist of the following:
• High-speed Internet connection
• Distribution Power over Ethernet Switch
• Wi-Fi access points (AP’s)
• Miscellaneous parts to support Installation of hardware
• Wiring to interconnect hardware elements of the solution
The high-speed Internet connection will be delivered over a communications circuit which will be provisioned to the building and terminated onto a CenturyLink provided router. The combination of this circuit and router are referred to as “Fiber Plus or Fiber +”. The router will be setup to distribute Internet connections throughout the building via distribution switches and Wi-Fi AP’s which will be distributed throughout the building into areas where service is required. Distributing these Wi-Fi AP’s throughout the building will provide wireless signals to patrons within the building. The entire solution is referred to as the Fiber Plus Internet Bundle. This solution will allow patrons to access the internet via their smart phones, tablets and PC’s.
3.0. Terms
The 460th FSS/FSVS, Fitness Center requests to enter into a 3-year contract with CenturyLink to provide the engineering, installation, wiring and hardware/software required to support the solution described in the Solution Overview
3.1. Scope of Work
The work required to install and turn up the solution is divided into the following general tasks.
• General Site Survey o Determine Network Demark o Plan Placement of Router and Ethernet Switch o Confirm Adequate Power Sources of Equipment
• Wi-Fi Predictive Planning o Perform placement planning of Wi-Fi access points based off of desired service area
• Circuit Delivery and Test (Includes installation of termination router)
• Installation of Ethernet Switch
• Installation of Wi-Fi Access points
• Installation of wiring to support interconnections between Ethernet switch and AP’s
• Installation of wiring to support extension of circuit (if required)
• Turn up and test of solution
• Usage training of solution
3.2 Requirement/Description of Services
Fiber+ Internet Bundle Offer: CenturyLink provides Fiber+ Internet services under: (a) the Fiber+ Internet Package Attachment (“Attachment Quote Z- 00984403”) and (b) the Domestic CenturyLink IQ Networking, Local Access, and Rental CPE Service Exhibits. The Attachment and Service Exhibits applicable to customers purchasing Fiber+ Internet services for wholesale purposes are found at http://www.centrulink.com/legal/FiberPlus_Wholesale.pdf, valued at $70k.
There is a CSA in place for CenturyLink to provide all access to the installation.
CenturyLink is the only provider for this requirement.
3.3 General Bill of Materials
The Fiber+ Internet Bundle Offer includes:
• Security Appliance Advanced Managed Enterprise with Cisco Meraki: 1 each Meraki MX100 – Firewall Controller
• Fiber Plus Circuit, 1 GIG Fiber Internet
• Wireless Access Point: 5 each MR52 Wi-Fi AP’s, High
Ceiling/Gymnasium AP’s, Device + Mgmt.
• Wireless Access Point: 15 each MR33 Wi-Fi AP, Wi-Fi AP’s, Device + Mgmt.
• Network Switch: 1 each MS225-24P, 24 Port Switch, Device + Mgmt.
• Wiring
• Professional Sight Survey
• Fiber+ Internet: 1 each Adtran Netvanta 5660 Pro 1G
• Building Extension
• Business Essentials Standard: Includes 10 Licenses
• Pro MET 24x7 Professional: 1 each Pro 1G 24x7
Optional Business Applications Included at No Additional Charge:
• Microsoft Office 365 from CenturyLink (10 Business Essential licenses, includes email w/ 50GB storage
• Basic Web Hosting with Site Builder Tools (5GB Storage)
• DNS Registration (1 included)
• Data Backup for PC and Laptop (not applicable to servers) (10 Licenses at
10GB each)
• Cloud Fax (20 Inbound/Outbound Pages)
3.4. General Requirements:
Fiber+ Internet bundle to include hardware/software/engineering/installation for a 1 GIG Fiber Internet Wi-Fi System.
3.5 Delivery
Delivery will be no later than 30 Days after award of contract.
3.6 Delivery Address
Ms. Peggy Haynes Mericle 460th FSS/FSVS (Bldg 35) Fitness Center 17890 E. Steamboat Avenue Buckley Garrison, CO 80011
4.0. Point of Contact
Primary POC:
Ms. Peggy Haynes Mericle Telephone: (720)-847-4350
Technical POC:
NATHAN L. WEISBECK, MSgt, USAF SEL, IT Flight 460th Mission Support Group Comm: 720-847-5711
DSN: 847-5711
nathan.weisbeck@us.af.mil 312-847-5711
Technical POC:
TSgt Tunell:
justin.tunell@us.af.mil
| 460th FSS/FSVS |
| Fitness Center |
| 17890 E. Steamboat Avenue, Building 35 |
| Buckley AFB, CO 80011 |
| Ms. Peggy Mericle |
| Telephone: (720)-847-4350 |
File details come from the government source that posted it. Updated .